| Permeability | Gas / liquid impermeable |
| Applications | Water , waste water, digester , reactor , grain , sludge , chemicals |
| Payment Terms | L/C,T/T |
| Supply Ability | 60 sets per month |
| Delivery Time | 10-30 days after deposit received |
| Packaging Details | PE poly-foam between each two steel plates;wooden pallets and wooden box |
| Coating Thickness | 0.25~0.40mm, double coating |
| Hardness | 6.0 Mohs |
| Foundation | Concrete or glass fused steel |
| Installation | By jacking machine or steel pole, fast in installation |
| Holiday test | >1500V |
| Acid and alkalinity proof | Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 |
| Coating Color | Dark green, or Customizing colors |
| Adhesion | 3,450N/cm |
| Steel grade | ART 310 |
| Brand Name | CEC TANKS |
| Model Number | W20180508003 |
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
Customized Industrial Water Storage Tanks: Tailored Solutions for Every Need
Center Enamel: The Worldwide Leading Industrial Water Tank Manufacturer
GLS Wastewater Storage Tanks with More Than 30 Years Service Life: Durable,
Large Capacity Industrial Water Tanks With Low Project Cost
Product Specification
| Permeability | Gas / liquid impermeable | Applications | Water , waste water, digester , reactor , grain , sludge , chemicals |
| Payment Terms | L/C,T/T | Supply Ability | 60 sets per month |
| Delivery Time | 10-30 days after deposit received | Packaging Details | PE poly-foam between each two steel plates;wooden pallets and wooden box |
| Coating Thickness | 0.25~0.40mm, double coating | Hardness | 6.0 Mohs |
| Foundation | Concrete or glass fused steel | Installation | By jacking machine or steel pole, fast in installation |
| Holiday test | >1500V | Acid and alkalinity proof | Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 |
| Coating Color | Dark green, or Customizing colors | Adhesion | 3,450N/cm |
| Steel grade | ART 310 | Brand Name | CEC TANKS |
| Model Number | W20180508003 | Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Place of Origin | CHINA | ||
| High Light | liquid fertilizer storage tanks ,crude oil storage tank | ||
In chemical processing complexes, municipal water treatment facilities, bioenergy plants, and heavy industrial manufacturing, maintaining reliable, large-volume reserves of liquids is critical to continuous operational workflows. Among mid-to-large capacity containment assets, the 200,000 Gallon Liquid Storage Tank represents a benchmark scale, balancing massive volumetric capacity with structural economy and spatial footprint efficiency. Storing 200,000 gallons of industrial process water, wastewater, fire suppression reserves, or liquid chemicals subjects the containment vessel to intense hydrostatic pressures and severe chemical environments.
Traditional storage options—such as poured-in-place concrete reservoirs and heavy field-welded carbon steel tanks—frequently encounter performance hurdles, including multi-month construction delays, concrete carbonation, structural micro-cracking, and rapid interior coating degradation. To achieve uncompromising reliability and total regulatory compliance, modern industry relies on modular bolted containment. Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) leverages decades of manufacturing excellence to engineer and supply world-class 200,000 gallon industrial liquid storage solutions globally.
Containing 200,000 gallons of liquid requires rigorous structural design and materials science:
Center Enamel manufactures high-capacity industrial tanks utilizing premium modular panel technologies:
| Evaluation Metric | Center Enamel 200k Gal Bolted Tank | Cast-in-Place Concrete Reservoir | Traditional Welded Steel Tank |
|---|---|---|---|
| Chemical & Corrosion Defense | Superior (Inert glass or factory FBE coating resists aggressive industrial liquids and acids) | Moderate (Vulnerable to concrete carbonation, chemical attack, and seepage) | Low (Dependent on field-applied epoxy coatings that pit and blister quickly) |
| Construction Velocity | Fast (Prefabricated modular panels bolted rapidly on-site with zero curing delays) | Very Slow (Months of formwork, concrete pouring, and multi-week curing phases) | Moderate (Requires heavy field plate rolling, welding, and radiograph testing) |
| Modularity & Scalability | High (Modular bolted design allows effortless volume expansion or relocation) | None (Permanent civil structure; impossible to expand without major demolition) | Limited (Destructive cutting required to modify or dismantle) |
| Lifecycle & Maintenance | Minimal (30 to 50+ years of service with virtually zero interior maintenance) | High (Requires frequent structural crack sealing and waterproof patching) | High (Continuous maintenance overhead to prevent rust-through and leaks) |
Engineering Assurance: All 200,000 gallon industrial liquid storage tanks engineered by Center Enamel comply strictly with internationally recognized design and quality benchmarks, including AWWA D103-09, ISO 28765, ISO 9001, and rigorous quality protocols such as 100% high-voltage holiday spark testing prior to dispatch.
A: Center Enamel's 200,000 gallon tanks are engineered to store a wide variety of industrial liquids, including raw process water, municipal potable water, fire suppression reserves, wastewater effluent, landfill leachate, and select industrial chemicals.
A: Modular bolted steel tanks offer significantly faster installation times, factory-controlled coating quality that prevents chemical attack and seepage, modular scalability, and freedom from the concrete micro-cracking and water leakage issues common in large civil basins.
A: GFS tanks combine the high tensile strength of steel with the absolute chemical inertness of glass through high-temperature thermal fusion (820°C to 930°C). This creates an impermeable, non-porous surface that resists acids, alkalis, and heavy industrial liquids without requiring interior repainting.
A: Because all structural panels are prefabricated under strict factory conditions, on-site mechanical bolting is completed in a fraction of the time required to pour and cure a massive concrete basin, significantly accelerating plant commissioning timelines.
Company Details
Business Type:
Manufacturer
Year Established:
1989
Employee Number:
500~600
Ecer Certification:
Verified Supplier
Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a... Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...
Get in touch with us
Leave a Message, we will call you back quickly!