| Applications | Water , waste water, digester , reactor , grain , sludge , chemicals |
| Easy to clean | Smooth, glossy, inert, anti-adhesion |
| Adhesion | 3,450N/cm |
| Roof available | Glass fused steel roof , membrane roof, aluminum roof , GRP roof |
| Capactiy available | 20 m3 to 20,000 m3 |
| Acid and alkalinity proof | Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 |
| Steel plates thickness | 3mm - 12mm , depends on the diameter & height |
| Size Of Panel | 2.4M * 1.2M |
| Installation | By jacking machine or steel pole, fast in installation |
| Service life | ≥30 years |
| Coating thickness | 0.25mm~0.40mm , two layer of coating internal and external |
| Payment Terms | L/C,T/T |
| Supply Ability | 60 sets per month |
| Delivery Time | 10-30 days after deposit received |
| Packaging Details | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Steel grade | ART 310 |
| Feature | Eco-friendly, Durability |
| Brand Name | CEC TANKS |
| Model Number | W |
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Place of Origin | China |
View Detail Information
Explore similar products
Bolted Steel Drinking Water Storage Tanks with AWWA and OSHA Standard
Easily Transportable Bolted Steel Tanks for Fire Protection Water Storage
Minimum Assembly Time Bolted Steel Tanks for Digester and Bioenergy Process
Cost-Effective Bolted Steel Sludge Holding Tanks: Large Volume Solutions by
Product Specification
| Applications | Water , waste water, digester , reactor , grain , sludge , chemicals | Easy to clean | Smooth, glossy, inert, anti-adhesion |
| Adhesion | 3,450N/cm | Roof available | Glass fused steel roof , membrane roof, aluminum roof , GRP roof |
| Capactiy available | 20 m3 to 20,000 m3 | Acid and alkalinity proof | Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 |
| Steel plates thickness | 3mm - 12mm , depends on the diameter & height | Size Of Panel | 2.4M * 1.2M |
| Installation | By jacking machine or steel pole, fast in installation | Service life | ≥30 years |
| Coating thickness | 0.25mm~0.40mm , two layer of coating internal and external | Payment Terms | L/C,T/T |
| Supply Ability | 60 sets per month | Delivery Time | 10-30 days after deposit received |
| Packaging Details | PE poly-foam between each two steel plates ; wooden pallet and wooden | Steel grade | ART 310 |
| Feature | Eco-friendly, Durability | Brand Name | CEC TANKS |
| Model Number | W | Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Place of Origin | China | ||
| High Light | bolted steel water storage tanks ,welded steel tanks | ||
In municipal water distribution networks, industrial processing complexes, master-planned residential communities, and emergency fire suppression grids, maintaining a dependable, high-volume reserve of clean water is vital. Among standard mid-to-large scale containment capacities, the 200,000 Gallon Bolted Steel Water Storage Tank represents a benchmark solution, striking the optimal balance between massive volume capacity, site footprint efficiency, and structural economy.
Traditional poured-in-place concrete basins and massive field-welded carbon steel tanks frequently encounter severe structural hurdles, including multi-month construction delays, concrete micro-cracking, water leakage, and high ongoing maintenance overhead. To overcome these limitations, modern engineering relies on advanced modular containment. Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) leverages decades of manufacturing excellence to engineer and supply world-class 200,000 gallon bolted steel water storage solutions tailored to global standards.
Storing 200,000 gallons of water places immense hydrostatic pressure on the lower shell rings and floor foundations, demanding rigorous structural engineering:
Center Enamel manufactures high-capacity storage tanks utilizing premium Glass-Fused-to-Steel (GFS) or advanced Fusion Bonded Epoxy (FBE) modular panel systems:
| Evaluation Metric | Center Enamel Modular Bolted Tank | Cast-in-Place Concrete Reservoir | Traditional Field-Welded Steel Tank |
|---|---|---|---|
| Construction Velocity | Fast (Prefabricated modular panels bolted rapidly on-site with zero curing delays) | Very Slow (Months of formwork, pouring, and multi-week curing phases) | Moderate (Requires heavy field plate rolling, welding, and radiograph testing) |
| Corrosion Defense & Purity | Superior (Inert glass or factory epoxy coating prevents rust and water contamination) | Moderate (Vulnerable to concrete carbonation, cracking, and water seepage) | Low (Dependent on field-applied epoxy coatings that degrade and blister quickly) |
| Lifecycle & Maintenance | Minimal (30 to 50+ years of service with virtually zero interior maintenance) | High (Requires frequent structural crack injection and waterproof patching) | High (Continuous maintenance overhead to prevent rust-through and leaks) |
| Code Compliance | Certified (Engineered strictly to AWWA D103-09, NSF/ANSI 61, and ISO benchmarks) | Variable (Dependent on local civil contractor execution and mix quality) | Variable (Dependent on field weld inspection and NDT testing) |
Engineering Assurance: Every 200,000 gallon water storage tank engineered by Center Enamel complies strictly with international design benchmarks, including AWWA D103-09, NSF/ANSI 61, NFPA 22, and ISO 9001, backed by rigorous quality protocols such as 100% high-voltage holiday spark testing prior to dispatch.
A: Bolted steel tanks offer significantly faster installation times, lower overall project costs, factory-controlled coating quality, modular scalability, and freedom from the concrete cracking and water leakage issues common in large civil reservoirs.
A: Yes. All large-capacity water storage systems designed and manufactured by Center Enamel strictly comply with global engineering standards, including AWWA D103-09 for bolted steel tanks and NSF/ANSI 61 for safe contact with potable drinking water.
A: Because all structural panels are prefabricated under strict factory conditions, on-site assembly via mechanical bolting is completed in a fraction of the time required to pour and cure a massive concrete basin, significantly accelerating project commissioning timelines.
A: Yes. Center Enamel custom-engineers high-capacity storage tanks to integrate seamlessly with municipal and industrial fire suppression networks, complying fully with NFPA 22 design guidelines and accommodating specific piping, valve, and level-sensor configurations.
Company Details
Business Type:
Manufacturer
Year Established:
1989
Employee Number:
500~600
Ecer Certification:
Verified Supplier
Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a... Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...
Get in touch with us
Leave a Message, we will call you back quickly!