| Holiday test | >1500v |
| Delivery Time | 0-60 days after deposit received |
| Payment Terms | L/C,T/T |
| Hardness | 6.0Mohs |
| Tank body color | Dark green / can be customized |
| Supply Ability | 60 sets per month |
| Adhesion | 3,450N/cm |
| Packaging Details | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Model Number | W20160504020 |
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Place of Origin | China |
| Brand Name | CEC TANKS |
View Detail Information
Explore similar products
Glass-Fused-to-Steel Tanks for Cow Dung Anaerobic Digesters: Maximizing Biogas
The First Glass-Lined Steel Tanks Manufacturer in China
Glass Fused to Steel Potable Water Storage Tanks with Aluminum Dome Roofs:
Expandable Glass Fused to Steel Tanks Made of ART 310 Steel Plate: Advanced
Product Specification
| Holiday test | >1500v | Delivery Time | 0-60 days after deposit received |
| Payment Terms | L/C,T/T | Hardness | 6.0Mohs |
| Tank body color | Dark green / can be customized | Supply Ability | 60 sets per month |
| Adhesion | 3,450N/cm | Packaging Details | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Model Number | W20160504020 | Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Place of Origin | China | Brand Name | CEC TANKS |
| High Light | NFPA 22 compliant fire water tanks ,commercial fire protection storage tanks ,glass fused steel fire water tanks | ||
Commercial buildings - offices, retail centers, hotels, warehouses, data centers, and factories - depend on a dedicated fire-reserve volume that satisfies the authority having jurisdiction and the insurer. That reserve must be reliable through decades of standby, integrate with fire pumps and sprinklers, and occupy a constrained site footprint. The tank is not optional infrastructure; it is the precondition for occupancy.
Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) supplies NFPA 22 and FM compliant commercial fire protection water storage tanks in bolted GFS, galvanized, and stainless steel. As China's first GFS manufacturer since 2008 with installations in more than 100 countries, the company delivers fire reserves that pass inspection and survive decades of dormancy.
A commercial fire protection tank must satisfy code volume, remain reliable through decades of standby, and integrate with the building's fire pump and sprinkler system.
Commercial fire tanks favor bolted construction for speed and a corrosion-proof lining that survives long standby.
Commercial projects run on schedule and tight sites - bolted tanks deliver code-compliant fire reserve without long concrete pours or welded delays.
| Criterion | Bolted GFS (Center Enamel) | Concrete Tank | Field-Welded Steel |
|---|---|---|---|
| NFPA 22 / FM | Compliant, document-ready | Compliant | Compliant, coating risk |
| Standby corrosion | None - fused glass | Rebar risk | Internal coating ages |
| Erection time | Weeks | Months | Slow welding |
| Site footprint | Compact, bolted | Large formwork | Medium |
| Lifecycle | 30-50 years | Repair cycles | Recoat 5-10 yr |
Center Enamel commercial fire tanks are FEA-verified to AWWA D103-09, manufactured under ISO 9001/45001, 100% high-voltage holiday spark tested, and built to NFPA 22 with FM-approved components where required - supported by documentation for occupancy permits and insurance.
A fire tank is the one asset a building owner prays never to use - and the one the insurer checks first. It has to be full, compliant, and intact on the day it finally matters.
It is a dedicated tank that holds the fire-reserve volume a commercial building needs for its sprinklers, hose streams, and fire pumps per NFPA 22. Center Enamel supplies bolted GFS, galvanized, and stainless tanks built to NFPA 22 and FM standards for offices, warehouses, hotels, and plants.
A fire tank stands full but unused for decades; the GFS fused-glass lining never rusts or needs recoating during that standby, matching the 30-50 year building life. It also needs no field painting, avoiding VOC permits and weather delays on commercial sites.
Yes - designs follow NFPA 22 for private fire service mains, and FM-approved components are supplied where the insurer requires them. Documentation supporting occupancy permits and insurance premiums is provided with each tank.
Yes - capacity, footprint, roof type, elevation (grade or tower), booster integration, and material (GFS, galvanized, stainless) are engineered per building hydraulic demand and site constraints, with NFPA 22 documentation.
Company Details
Business Type:
Manufacturer
Year Established:
1989
Employee Number:
500~600
Ecer Certification:
Verified Supplier
Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a... Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...
Get in touch with us
Leave a Message, we will call you back quickly!