| Steel grade | ART 310 |
| Delivery Time | 0-60 days after deposit received |
| Corrosion Integrity | Excellent |
| Payment Terms | L/C,T/T |
| Coating thickness | 0.25mm~0.40mm & Double coating |
| Roof available | Glass fused steel roof , membrane roof, aluminum roof , GRP roof |
| Steel plates thickness | 3mm to 12mm , depends on the tank structure |
| Supply Ability | 60 sets per month |
| Tank body color | Dark green / customized |
| Packaging Details | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Model Number | W20160907009 |
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Brand Name | CEC TANKS |
| Place of Origin | China |
View Detail Information
Explore similar products
Glass-Fused-to-Steel Tanks for Cow Dung Anaerobic Digesters: Maximizing Biogas
The First Glass-Lined Steel Tanks Manufacturer in China
Glass Fused to Steel Potable Water Storage Tanks with Aluminum Dome Roofs:
Expandable Glass Fused to Steel Tanks Made of ART 310 Steel Plate: Advanced
Product Specification
| Steel grade | ART 310 | Delivery Time | 0-60 days after deposit received |
| Corrosion Integrity | Excellent | Payment Terms | L/C,T/T |
| Coating thickness | 0.25mm~0.40mm & Double coating | Roof available | Glass fused steel roof , membrane roof, aluminum roof , GRP roof |
| Steel plates thickness | 3mm to 12mm , depends on the tank structure | Supply Ability | 60 sets per month |
| Tank body color | Dark green / customized | Packaging Details | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Model Number | W20160907009 | Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Brand Name | CEC TANKS | Place of Origin | China |
| High Light | durable bolted steel water tank ,steel storage tank for water supply ,glass fused steel water storage tank | ||
Steel has been the material of water storage for more than a century — for good reason. Steel is strong, predictable, and factory-engineerable, which is why the world's water systems are built from it. But not all steel tanks are equal: a field-welded tank depends on site welders and weather-dependent field painting, while a factory-manufactured bolted steel tank arrives with its coating and structure already controlled. The difference shows up in the first decade of service — and compounds over the next three.
Bolted steel water tanks from Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) are manufactured under ISO 9001 with factory-applied coatings — glass fused to steel at 820-930 degrees Celsius, or fusion bonded epoxy, or hot-dip galvanizing — and engineered to AWWA D103-09 with NSF/ANSI 61 certified options for potable duty. As the first GFS tank manufacturer in China, Center Enamel has supplied steel water storage to more than 100 countries since 2008.
The steel water tank family splits into four coating technologies, each with a different corrosion-resistance profile and lifecycle cost.
Bolted construction converts steel's factory advantages into project advantages: speed, quality control, and flexibility that field-welded tanks cannot match.
Steel does not fail from strength — it fails from corrosion — so the coating decision is the life-expectancy decision for any steel water tank.
| Evaluation Criterion | Bolted GFS Steel Tank (Center Enamel) | Field-Welded Coated Steel Tank | Cast-in-Place Concrete Tank |
|---|---|---|---|
| Corrosion & coating life | Superior — inert glass, 30-50 years, no recoating | Poor — field coating fails in 5-10 years | Moderate — cracking and carbonation |
| Construction velocity | Fast — weeks, bolted panels | Slow — site welding and coating | Very slow — months of casting |
| Modularity & relocation | High — expand or move | None — permanent | None — permanent |
| Potable certification | NSF/ANSI 61 & WRAS certified options | Coating certification varies | Liner-dependent |
| Lifecycle maintenance | Minimal — inspection only | Recoating cycles | Crack repair and re-lining |
Every Center Enamel steel water tank is FEA-verified to AWWA D103-09, manufactured under ISO 9001 and ISO 45001 systems, factory-coated with 100% high-voltage holiday spark testing, and certified to NSF/ANSI 61 and WRAS for potable duty where required.
For most water supply duties, bolted GFS is the best balance: a factory-fused inert glass surface, AWWA D103-09 structural design, and a 30-50 year life with no recoating. FBE, galvanized, and stainless suit narrower chemistry or budget niches.
With factory-applied coatings such as GFS, steel water tanks are engineered for 30-50 years with minimal maintenance. Field-welded and field-painted tanks typically need recoating every 5-10 years.
Yes, when the contacting surface is certified. Center Enamel offers NSF/ANSI 61 and WRAS certified GFS options, and the inert glass surface cannot leach or harbor biofilm.
Yes — capacity, diameter-to-height ratio, coating type, roof, accessories, and even multi-tank layouts are engineered per application, site, and water chemistry.
Company Details
Business Type:
Manufacturer
Year Established:
1989
Employee Number:
500~600
Ecer Certification:
Verified Supplier
Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a... Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...
Get in touch with us
Leave a Message, we will call you back quickly!