China factories

Chat Now Send Email
China factory - Shijiazhuang Zhengzhong Technology Co., Ltd

Shijiazhuang Zhengzhong Technology Co., Ltd

  • China,Guangzhou ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Data Center Tank Installation: Bolted Panel Erection Sequence and Schedule
China Data Center Tank Installation: Bolted Panel Erection Sequence and Schedule

  1. China Data Center Tank Installation: Bolted Panel Erection Sequence and Schedule

Data Center Tank Installation: Bolted Panel Erection Sequence and Schedule

  1. MOQ: 1set
  2. Price: $5000~$20000 one set
  3. Get Latest Price
Delivery Time 10-30 days after deposit received
Permeability Gas / liquid impermeable
Size Of Panel 2.4M * 1.2M
Packaging Details PE poly-foam between each two steel plates ; wooden pallet and wooden
Payment Terms L/C,T/T
Foundation Concrete or glass fused steel
Easy to clean Smooth, glossy, inert, anti-adhesion
Steel plates thickness 3mm to 12mm , depends on the tank structure
Supply Ability 60 sets per month
Tank Material Glass fused to steel
Model Number W
Brand Name CEC TANKS
Place of Origin China
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Delivery Time 10-30 days after deposit received Permeability Gas / liquid impermeable
Size Of Panel 2.4M * 1.2M Packaging Details PE poly-foam between each two steel plates ; wooden pallet and wooden
Payment Terms L/C,T/T Foundation Concrete or glass fused steel
Easy to clean Smooth, glossy, inert, anti-adhesion Steel plates thickness 3mm to 12mm , depends on the tank structure
Supply Ability 60 sets per month Tank Material Glass fused to steel
Model Number W Brand Name CEC TANKS
Place of Origin China Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI
High Light Glass fused steel tank installation ,Bolted panel erection sequence ,Data center tank schedule

Data Center Tank Installation: Bolted Panel Erection Sequence and Schedule

A tank that is perfectly designed still has to appear on site, on the critical path, without damaging the coated panels. Installation is where many projects slip. For a data center, the bolted-panel method is chosen as much for its schedule predictability as for its coating quality. A missed tank milestone can delay the entire commissioning sequence, so the installation plan deserves the same rigor as the engineering.

Data center tank installation follows a repeatable sequence: factory packing of coated panels, container load, site foundation and anchor check, panel erection tier by tier with 8.8-grade bolts and butyl sealant, crane and crew coordination, and QA including bolt torque and a holiday-test record review. Bolted erection completes in days with a small crew, protecting the commissioning date; the sequence repeats cleanly across a multi-tank campus program.

From Factory to Site

Coated panels are crated to survive ocean freight, with mill and coating certificates shipped alongside. On arrival the foundation is verified against the anchor-bolt plan before any panel is lifted. Getting this handoff right prevents the most common delay: a foundation that does not match the tank.

  • Crated coated panels, documented.
  • Foundation checked to anchor plan.
  • Certificates travel with the load.

The Erection Sequence

Crews erect the shell tier by tier, placing a continuous butyl sealant and tightening 8.8-grade bolts to spec, then fit the roof, nozzles and accessories. The key QA steps are joint cleanliness, torque verification and a review of the 1500 V holiday-test record from the factory. Documenting these steps during erection, rather than after, is what keeps the handover clean.

Step Action QA
Foundation Verify anchors Tolerance check.
Shell Tier-by-tier bolt-up Torque verify.
Roof Fit panels/access Alignment.
QA Record review 1500 V test + torque.

Schedule Advantage

Bolted erection needs no on-site coating, no radiography and no weld weather windows, so a small crew and a crane can finish in days. The Thailand installation used a six-person crew in twelve days, illustrating the speed a data center critical path can rely on.

  • Thailand 2015: 6 people, 12 days.
  • No field welding of coated steel.
  • Small crew, one crane.

Scaling Across a Campus

Multi-tank programs repeat the same sequence phased to foundation readiness. The Indonesia Cilincing potable tank (21,088 m3, 2024) and the Namibia program of six 11,230 m3 tanks (2022) show single and multi-tank bolted erection at scale.

  • Indonesia Cilincing 2024: 21,088 m3.
  • Namibia 2022: six tanks at 11,230 m3 each.

Company Expertise

Center Enamel supplies the panels, the bolt/sealant/torque specification and erection supervision, so the data center tank installation is a governed sequence rather than an ad-hoc site build.

Frequently Asked Questions

How long does bolted tank erection take?

Often days with a small crew and crane, because there is no on-site coating, radiography or weld weather window.

What is the most common installation delay?

A foundation that does not match the anchor-bolt plan; verifying anchors before lifting prevents it.

What QA happens during erection?

Joint cleanliness, bolt torque verification and review of the factory 1500 V holiday-test record.

Can multiple tanks be phased?

Yes - the same sequence repeats phased to foundation readiness, as with multi-tank programs.

Who provides the crane and crew?

Usually the local contractor; the tank supplier provides supervision and the specification.

Is on-site coating needed?

No - panels arrive pre-coated, which is a major schedule advantage over welded tanks.

Data center tank installation is a governed, repeatable sequence, not a site gamble. Pack the coated panels well, verify the foundation, bolt tier by tier with the right sealant and torque, and review the holiday-test record - and the tank comes online in days, repeatable across the campus.

Suggested CTA: Send us your tank count, volumes and foundation dates and we will return a phased erection plan with the bolt, sealant and torque specification plus supervision.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1989

  • Employee Number:

    500~600

  • Ecer Certification:

    Verified Supplier

  Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...   Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...

+ Read More

Get in touch with us

  • Reach Us
  • Shijiazhuang Zhengzhong Technology Co., Ltd
  • Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
  • https://www.cectanks.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement