| Permeability | Gas / liquid impermeable |
| Applications | Water , waste water, digester , reactor , grain , sludge , chemicals |
| Payment Terms | L/C,T/T |
| Supply Ability | 60 sets per month |
| Delivery Time | 10-30 days after deposit received |
| Packaging Details | PE poly-foam between each two steel plates;wooden pallets and wooden box |
| Coating Thickness | 0.25~0.40mm, double coating |
| Hardness | 6.0 Mohs |
| Foundation | Concrete or glass fused steel |
| Installation | By jacking machine or steel pole, fast in installation |
| Holiday test | >1500V |
| Acid and alkalinity proof | Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 |
| Coating Color | Dark green, or Customizing colors |
| Adhesion | 3,450N/cm |
| Steel grade | ART 310 |
| Brand Name | CEC TANKS |
| Model Number | W20180508003 |
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
Leading China Galvanized Steel Fire Water Tank Manufacturer: Center Enamel
Engineering the Global Standard: The Leading China Galvanized Steel Water Tank
Suit Your Individual Needs with Galvanized Steel Water Storage Tanks
AWWA D103 Standard Galvanized Steel Tanks for Fire Protection Water Storage
Product Specification
| Permeability | Gas / liquid impermeable | Applications | Water , waste water, digester , reactor , grain , sludge , chemicals |
| Payment Terms | L/C,T/T | Supply Ability | 60 sets per month |
| Delivery Time | 10-30 days after deposit received | Packaging Details | PE poly-foam between each two steel plates;wooden pallets and wooden box |
| Coating Thickness | 0.25~0.40mm, double coating | Hardness | 6.0 Mohs |
| Foundation | Concrete or glass fused steel | Installation | By jacking machine or steel pole, fast in installation |
| Holiday test | >1500V | Acid and alkalinity proof | Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 |
| Coating Color | Dark green, or Customizing colors | Adhesion | 3,450N/cm |
| Steel grade | ART 310 | Brand Name | CEC TANKS |
| Model Number | W20180508003 | Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Place of Origin | CHINA | ||
| High Light | Faster Install Time galvanized steel tank ,Fish Farm steel tank ,Fish Farm galvanized steel tank | ||
A faster install time galvanized steel tank for a fish farm is a pre-engineered, modular bolted containment system designed specifically to slash construction schedules while delivering a durable, high-integrity water environment for commercial aquaculture and Recirculating Aquaculture Systems (RAS). In fish farming, timing is everything; a delayed construction schedule can miss critical seasonal stocking windows and impact profitability. By utilizing factory-prefabricated hot-dip galvanized steel panels that bolt together rapidly on-site, these tanks eliminate the weeks of waiting associated with poured concrete curing, allowing aquaculture operators to commission facilities and start production in record time.
Commercial fish farming requires precise planning and rapid infrastructure deployment. Traditional containment methods introduce major scheduling risks:
Weather-Dependent Concrete Curing: Poured-in-place concrete basins require extensive formwork, heavy reinforcement, and weeks of curing time. Rain, freezing temperatures, or high heat can halt construction and derail project timelines.
High On-Site Labor Overhead: Welded steel tanks demand specialized welding crews, rigorous on-site non-destructive testing, and complex safety permits, driving up labor expenses.
Missed Stocking Cycles: Every week a fish farm spends under construction is a week of lost revenue. Rapid deployment directly correlates with faster return on investment (ROI).
All steel panels are precision-punched, formed, and hot-dip galvanized in a controlled factory environment. They arrive on-site as flat-packed modular kits complete with all necessary hardware and structural gaskets, ready for immediate assembly.
Because the modular panels are engineered for efficient handling, local installation crews can erect massive aquaculture reservoirs using simple, lightweight assembly tools. This eliminates the need for heavy, expensive crane mobilization in remote rural or coastal farm locations.
Unlike concrete that requires a 28-day curing period before it can safely hold full hydrostatic loads, a bolted galvanized steel tank is ready for filling and stocking immediately upon completion of bolt-torquing and internal liner installation.
| Performance Metric | Fast-Install Galvanized Bolted Tank | Cast-in-Place Concrete Basin | Field-Welded Carbon Steel Tank |
|---|---|---|---|
| On-Site Installation Time | Fast (Assembled in days to a few weeks) | Very Slow (Months of formwork and curing) | Slow (Weeks of welding and inspection) |
| Labor Requirement | Low (Local assembly crew with basic tools) | High (Specialized formwork and concrete workers) | High (Certified structural welders) |
| Weather Dependency | Minimal (Bolting can proceed in various conditions) | High (Rain and extreme temperatures disrupt curing) | Moderate (Welding sensitive to high moisture/wind) |
| Design Lifespan | 30+ Years | 20–25 Years | 15–20 Years |
| Scalability & Relocation | High (Bolted modular design allows future expansion) | None (Fixed monolithic structure) | Low |
Whether upgrading an existing RAS facility or establishing a new commercial breeding station, minimizing downtime is essential. Center Enamel’s fast-install galvanized steel tanks combine rapid assembly with certified food-grade interior liners, ensuring that your fish stock enjoys a clean, secure habitat while your project stays strictly on schedule.
A: Galvanized steel tanks are prefabricated as modular bolted kits in a factory. They require no pouring, framing, or 28-day curing periods. Local crews can simply bolt the panels together on-site, reducing construction time from months to just a few days.
A: No. One of the primary benefits of modular bolted construction is that large cranes or heavy construction equipment are rarely needed. The panels are lightweight enough to be handled and erected using standard tools and scaffolding.
A: Yes. When paired with certified food-grade and NSF-compliant interior liners, galvanized steel tanks provide an entirely non-toxic, clean environment that protects water quality and ensures healthy fish growth.
A: Yes. Because these tanks are constructed from modular bolted panels, they offer high flexibility, allowing facility managers to scale up storage capacity or modify configurations as farm operations grow.
At Center Enamel, we combine advanced manufacturing capabilities with deep engineering expertise to deliver robust, high-performance, and rapid-deployment containment solutions for agricultural and aquaculture projects worldwide.
Are you planning a fish farming or aquaculture water storage project? Contact our engineering team today for a technical consultation, capacity sizing, and a customized proposal.
Company Details
Business Type:
Manufacturer
Year Established:
1989
Employee Number:
500~600
Ecer Certification:
Verified Supplier
Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a... Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...
Get in touch with us
Leave a Message, we will call you back quickly!