China factories

China factory - CHG International Limited

CHG International Limited

  • China,Beijing ,Beijing
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Method Type Automatic Powder Coating Production Line for Cold Rolled Steel
China Method Type Automatic Powder Coating Production Line for Cold Rolled Steel

  1. China Method Type Automatic Powder Coating Production Line for Cold Rolled Steel
  2. China Method Type Automatic Powder Coating Production Line for Cold Rolled Steel
  3. China Method Type Automatic Powder Coating Production Line for Cold Rolled Steel

Method Type Automatic Powder Coating Production Line for Cold Rolled Steel

  1. MOQ: 1 set
  2. Price: Negotiable
  3. Get Latest Price
Packaging Details Varies depending on the design
Delivery Time Varies depending on the design
Payment Terms L/C, D/P, T/T, Western Union, MoneyGram
Supply Ability 10 sets per year
Coating Powder Coating
Substrate Steel
Application Hardware Spraying Equipment
Method Type Automatic
Control Unit PLC
Mini Order Qty 1 Set
Certification ISO, CE
Place of Origin China
Brand Name CHG
Model Number AC-08

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Packaging Details Varies depending on the design Delivery Time Varies depending on the design
Payment Terms L/C, D/P, T/T, Western Union, MoneyGram Supply Ability 10 sets per year
Coating Powder Coating Substrate Steel
Application Hardware Spraying Equipment Method Type Automatic
Control Unit PLC Mini Order Qty 1 Set
Certification ISO, CE Place of Origin China
Brand Name CHG Model Number AC-08

This powder coating production line sprays cold rolled steel plates.

 

The material of the spray booth is PVC, and the spraying method combines automatic gun spraying and additional manual coating, and adopts an overhead conveyor system.

 

Production line flow: manual loading → automatic spraying + manual spraying → powder solidification → natural cooling → manual unloading

 

The Process of Powder Coating Line:

1. Surface Preparation:

The first step in the powder coating line is the surface preparation of the aluminum profiles. This stage is essential to ensure proper adhesion of the powder coating. Surface preparation may include cleaning, degreasing, and removing any contaminants from the aluminum surfaces.

2. Pre-Treatment:

After surface preparation, the aluminum profiles undergo a pre-treatment process to enhance coating adhesion and corrosion resistance. Common pre-treatment methods include chemical cleaning, phosphating, or chromate conversion coating. The pre-treatment prepares the aluminum surface for better powder adhesion and improves coating performance.

3. Drying:

Once the pre-treatment is completed, the aluminum profiles are passed through drying ovens to remove any remaining moisture from the surface. Dry aluminum surfaces are crucial for proper powder coating adhesion and finish.

4. Powder Coating Application:

The dried aluminum profiles are then ready for powder coating application. The powder coating material is electrostatically charged and sprayed onto the aluminum profiles using powder coating guns. The positively charged powder particles are attracted to the grounded aluminum profiles, adhering to the surface uniformly.

5. Powder Curing:

After powder coating application, the aluminum profiles are transferred to curing ovens. In the curing ovens, the powder coating undergoes a thermal curing process. The oven's heat causes the powder particles to melt and flow, creating a continuous, smooth coating film. The curing process also chemically cross-links the powder particles, ensuring a durable and hardened finish.

6. Cooling:

Following the curing process, the coated aluminum profiles are allowed to cool down. This cooling phase stabilizes the coating and ensures it maintains its properties and appearance.

7. Quality Inspection:

After cooling, the coated aluminum profiles undergo a thorough quality inspection. The inspection involves checking the coating thickness, appearance, adhesion, and overall quality to ensure it meets the specified standards.

 

 

Powder Coating Production Line for Cold Rolled Steel Plates Coating Equipment

Powder Coating Production Line for Cold Rolled Steel Plates Coating Equipment

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company

  • Year Established:

    2007

  • Employee Number:

    70~80

  • Ecer Certification:

    Verified Supplier

     CHG International Limited was established in 2007. With nearly 20 years of experience, our company and products have gained acceptance from a large number of customers.   Our business covers the import and export of machinery and equipment, automation e...      CHG International Limited was established in 2007. With nearly 20 years of experience, our company and products have gained acceptance from a large number of customers.   Our business covers the import and export of machinery and equipment, automation e...

+ Read More

Get in touch with us

  • Reach Us
  • CHG International Limited
  • Building B, No.5 Jinxing West Road, Daxing District, Beijing, China
  • https://www.chgcoating.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement