China factories

Chat Now Send Email
China factory - Daoyunai Energy Saving Technology Limited

Daoyunai Energy Saving Technology Limited

  • China,Shanghai ,Shanghai
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China DN800 UV CIPP Trenchless Pipeline Construction with UV-light Curing and High
China DN800 UV CIPP Trenchless Pipeline Construction with UV-light Curing and High

  1. China DN800 UV CIPP Trenchless Pipeline Construction with UV-light Curing and High
  2. China DN800 UV CIPP Trenchless Pipeline Construction with UV-light Curing and High
  3. China DN800 UV CIPP Trenchless Pipeline Construction with UV-light Curing and High
  4. China DN800 UV CIPP Trenchless Pipeline Construction with UV-light Curing and High

DN800 UV CIPP Trenchless Pipeline Construction with UV-light Curing and High

  1. MOQ: 1 set
  2. Price: Variable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 50 sets per year
Delivery Time 2-3 weeks
Packaging Details Normal
Brand Name Dao
Model Number D919
Certification ISO
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 50 sets per year
Delivery Time 2-3 weeks Packaging Details Normal
Brand Name Dao Model Number D919
Certification ISO Place of Origin China
High Light DN800 UV CIPPUV-light curing Trenchless Pipeline ConstructionHigh-strength liners Sewer Rehabilitation
Case Study: DN800 Sewer Rehabilitation in Suqian, China | UV CIPP Technology
In Suqian City, Jiangsu Province, we executed a high-efficiency trenchless sewer rehabilitation project on a critical DN800 underground pipeline. Using advanced UV CIPP (Cured-in-Place Pipe) technology, our team restored a 30-meter section of aging infrastructure that had reached a critical state of deterioration.
The Challenge: Severe Pipeline Corrosion and Root Intrusion
The 20-year-old concrete sewer pipe faced several structural threats that required immediate intervention:
  • Structural Decay: Significant thinning of the host pipe walls due to two decades of use
  • Root Intrusion: Aggressive root growth had caused extensive cracking and blockages
  • Environmental Risk: The deterioration posed a high risk of soil contamination and potential pipe collapse in a busy urban area
The Solution: Rapid UV CIPP Trenchless Repair
To minimize urban disruption and avoid the high costs of traditional excavation, we utilized the Daoyunai UV CIPP system. This trenchless method allows for "pipe-within-a-pipe" restoration without digging up the street.
Key Project Metrics
Pipe Diameter: DN800
Repair Length: 30 Meters
Total Project Time: Approximately 5 hours
Technology: UV-light curing with high-strength liners
Why Daoyunai UV CIPP Materials?
The project's success relied on the superior performance of Daoyunai liners and curing equipment:
  • High-Strength Liners: Engineered for maximum structural integrity and long-term corrosion resistance
  • Operational Speed: The liner's flexibility allows for fast pull-in, while the UV curing process is significantly faster than traditional thermal curing
  • Versatile Curing Equipment: Our proprietary UV system supports both Mercury and LED lamp options, offering the adaptability to cure various liner types currently available on the global market
Conclusion: Durable Infrastructure, Minimal Disruption
By choosing UV CIPP, the city of Suqian avoided weeks of road closures. The DN800 sewer is now reinforced with a seamless, jointless "new" pipe capable of withstanding heavy ground loads for decades to come.
UV CIPP sewer rehabilitation project showing the DN800 pipeline repair process

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2012

  • Total Annual:

    40000000-45000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ...

+ Read More

Get in touch with us

  • Reach Us
  • Daoyunai Energy Saving Technology Limited
  • Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
  • https://www.cipp-uv.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement