China factories

China factory - Shenzhen Benky Industrial Co., Ltd.

Shenzhen Benky Industrial Co., Ltd.

  • China,Shenzhen
  • Site Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Customized Processing CNC Processing For Microwave Equipment Installation Box
China Customized Processing CNC Processing For Microwave Equipment Installation Box

  1. China Customized Processing CNC Processing For Microwave Equipment Installation Box
  2. China Customized Processing CNC Processing For Microwave Equipment Installation Box
  3. China Customized Processing CNC Processing For Microwave Equipment Installation Box
  4. China Customized Processing CNC Processing For Microwave Equipment Installation Box

Customized Processing CNC Processing For Microwave Equipment Installation Box

  1. MOQ: 5PCS
  2. Price: $20.00
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 10,000/month
Delivery Time 10-25 work days
Packaging Details Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom
Material Aluminum alloy 6061
Drawing Format STEP, STP, IGES,IGS,PDF,DWG,DXF,CAD
Surface treatment anodizing, powder coating, Sandblasting
Roughness Ra0.2-Ra3.2(Custom Available)
OEM/ODM OEM ODM CNC Milling Turning Machining Service
QC Control 100% QC on critical dimensions, QC report available
Service Customized OEM
Brand Name Customized
Model Number Custom made
Certification ISO9001:2015,RoHS
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 10,000/month
Delivery Time 10-25 work days Packaging Details Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom
Material Aluminum alloy 6061 Drawing Format STEP, STP, IGES,IGS,PDF,DWG,DXF,CAD
Surface treatment anodizing, powder coating, Sandblasting Roughness Ra0.2-Ra3.2(Custom Available)
OEM/ODM OEM ODM CNC Milling Turning Machining Service QC Control 100% QC on critical dimensions, QC report available
Service Customized OEM Brand Name Customized
Model Number Custom made Certification ISO9001:2015,RoHS
Place of Origin China

【Part name】 Microwave equipment installation box parts processing

【Manufacturing process】CNC finishing

【Surface treatment】 Oxidized blue

【Product Features】 High processing accuracy

 

【Processing Equipment】

 

3-axis / 4-axis / 5-axis CNC machining centers (computer gongs), drilling tapping machines, CNC lathes, precision grinders, gantry milling machining centers, molding machines, hot-pressing tanks, western machines, wire cutting (fast / medium / slow walking) Wire) other processing equipment. Mechanical locking device parts processing

 

【Accuracy size】

 

Precision of metal parts:

 

Milling tolerance ± 0.01mm, turning tolerance ± 0.005mm

 

Plastic parts accuracy: ± 0.05mm

 

Size: 2200mm larger (removable parts are limited by size)

 

【Quantity Delivery】

 

Samples (1 order): 2-7 days

 

Small medium batch processing: 7-20 days

 

Mass production: 20-35 days

 

【material】

 

Metal: aluminum alloy, magnesium alloy, magnesium lithium alloy, low carbon steel, stainless steel, titanium alloy, copper, etc.

 

Plastic: ABS, PC, POM, PEEK, PP, acrylic (PMMA), nylon, Teflon, PPS, nylon + glass fiber, etc.

 

Composite material: carbon fiber

 

【Surface treatment】

 

Sand blasting, hard anodizing, micro-arc oxidation, grinding, polishing, oil spraying, blackening, electroplating, vacuum plating, chemical plating, phosphating, passivation, screen printing, flower biting, most other surface post-treatment processes.

 
SURFACE TREATMENT
Aluminum Parts
Stainless Steel Parts
Steel Parts
Brass Parts
Clear Anodized
Polishing
Zinc Plating
Nickel Plating
Color Anodized
Passivating
Oxide black
chrome plating
Sandblast Anodized
Sandblasting
Nickel Plating
Electrophoresis black
Chroming
Laser engraving
Powder Coated
Powder coated
Brushing
Electrophoresis black
Heat treatment
Gold plating
Polishing
Oxide black
Chrome Plating
etc.
etc
etc
etc
 
Quotation
According to your drawing(size, material, required technology, etc)
Tolerance
+/-0.001 mm - 0.01 mm (Customized avaiable)
Surface Roughness
Ra0.2 - Ra3.2(Customized avaiable)
Processing
Turning, Milling , Drilling, Auto lathe, Tapping, Surface treatment, etc.
Drawing Formats
PRO/E, Auto CAD, Solid Works , UG, CAD / CAM / CAE, PDF

 

 


 

 

 

 

 

FAQ:

1. Are you a factory or a trading company?
A: We are a factory which has been specialized in cnc machining & automatic manufacturing for more than 30 years.
2. Where is your factory and how can I visit it?
A: Our factory is located in Shenzhen city and you can get more detailed information by browsing our website: www.cnbenky.com
3. How long can I get some samples for checking and what about the price?
A: Normaly samples will be done within 1-2 days (automatic machining parts) or 3-5 day (cnc machining parts). The sample cost
depends on all information (size, material, finish, etc.). We will return the sample cost if your order quantity is good.
4. How is the warranty of the products quality control?
A: We hold the tightend quality controlling from very begining to the end and aim at 100% error free.
5.How to get an accurate quotation?
♦ Drawings, photos or samples of products.
♦ Detailed sizes of products.
♦ Material of products.
♦ Surface treatment of products.
♦ Ordinary purchasing quantity.

 



Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1990

  • Total Annual:

    20,000,000-40,000,000

  • Employee Number:

    350~600

  • Ecer Certification:

    Site Member

Introduction Established in 1990,Benky has engaged in the aluminum die casting,Zinc die casting plastic processing and CNC machining industry for 30 years.With our innovation philosophy and experience, we can provide you the services at a reasonable price, with the best quality, and fast delivery... Introduction Established in 1990,Benky has engaged in the aluminum die casting,Zinc die casting plastic processing and CNC machining industry for 30 years.With our innovation philosophy and experience, we can provide you the services at a reasonable price, with the best quality, and fast delivery...

+ Read More

Get in touch with us

  • Reach Us
  • Shenzhen Benky Industrial Co., Ltd.
  • No.18,Youmagang Industrial Zone, JiangShi Village Gongming Town, Bao'An District Shenzhen City, China
  • https://www.cnbenky.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement