China factories

China factory - Sunbeam Electronics (Hong Kong) Limited

Sunbeam Electronics (Hong Kong) Limited

  • China,Shenzhen
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China One Stop PCB Assembly Service PCBA testing ICT SMT FR4 Material
China One Stop PCB Assembly Service PCBA testing ICT SMT FR4 Material

  1. China One Stop PCB Assembly Service PCBA testing ICT SMT FR4 Material
  2. China One Stop PCB Assembly Service PCBA testing ICT SMT FR4 Material

One Stop PCB Assembly Service PCBA testing ICT SMT FR4 Material

  1. MOQ: package qty
  2. Price: Contact sales for updated price
  3. Get Latest Price
Payment Terms T/T
Supply Ability 1000+
Delivery Time 2 weeks
Packaging Details tape and reel
Material FR4
UL Rank UL94V-0
Brand Name OEM
Model Number untitled
Place of Origin china

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 1000+
Delivery Time 2 weeks Packaging Details tape and reel
Material FR4 UL Rank UL94V-0
Brand Name OEM Model Number untitled
Place of Origin china
High Light One Stop PCB Assembly ServicePCB Assembly Service ICT SMTFR4 printed circuit board assembly

PCBA on-stop service PCBA testing ICT SMT

 
 
1.PCB fabrication and PCB assembly;
2.PCBA programming & functional testing;
3.Electronic components purchasing service;
4.Enclosure molding & final assembly with labels,instructions,enclosure, boxes.
 
   
PCB Assembly Capabilities  
Item Technical Parameter
SMT Jointing Min. Space 0201mm
QFP Space Pitch 0.3mm
Min. Package 201
Min. Size 2*2 inch(50*50mm)
Max. Size 14*22 inch(350*550mm)
Placement Precision 0.01mm
Placement Precision QFP, SOP, PLCC, BGA
Placement Capability 0805, 0603, 0402, 0201
 
PCB Lead time (workday(s))
  Single, Double-sided 4 layer 6 layer Over 8 layer HDI
Sample Lead time (Normal) 6 7 8 10-12 10-12
Sample Lead time (Faster) 48-72 hours 5 6 6-7 12
Mass production lead time 7-9 10-12 13-15 16 20
PCB Assembly Lead time
Sample Lead time PCB Fab+Components Sourcing+PCBA=15 workdays
Mass production lead time PCB Fab+Components Sourcing+PCBA=20 workdays

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler

  • Year Established:

    2001

  • Total Annual:

    50 Million-55 Million

  • Employee Number:

    >48

  • Ecer Certification:

    Active Member

Sunbeam Electronics (Hong Kong) Limited set up on 2001 start capital HKD 3 Millions, our team total have 48 persons and including 15 professional electronics sourcing engineer and 20 professional marketing specialist. Sunbeam Electronics' main product line are TI,ADI,NXP,Micron,Microchip,Maxim,... Sunbeam Electronics (Hong Kong) Limited set up on 2001 start capital HKD 3 Millions, our team total have 48 persons and including 15 professional electronics sourcing engineer and 20 professional marketing specialist. Sunbeam Electronics' main product line are TI,ADI,NXP,Micron,Microchip,Maxim,...

+ Read More

Get in touch with us

  • Reach Us
  • Sunbeam Electronics (Hong Kong) Limited
  • Internatinal Logistics Center A-702, No. 1 South China Road, ShenZhen, China
  • https://www.componentelec.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement