China factories

China factory - Zhengzhou Zhenheng Construction Equipment Co., Ltd.

Zhengzhou Zhenheng Construction Equipment Co., Ltd.

  • China,Zhengzhou ,Henan
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
China Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer

  1. China Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
  2. China Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
  3. China Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
  4. China Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer

Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer

  1. MOQ: 1 set
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T
Supply Ability 30 sets per month
Delivery Time 7-15 working days after confirm order
Packaging Details Export standard container: 20GP or 40GP, 40HC
After-sales service provided Engineers available to service machinery overseas
Product name Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Power Type 3phase,50hz,38v
Max. Aggregate 80/60mm
Warranty twelve month
Machine Type Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Color Customer Required
Application Building Works
Brand Name ZHENHENG
Model Number Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Certification SGS, ISO, BV, CE
Place of Origin HENAN CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T Supply Ability 30 sets per month
Delivery Time 7-15 working days after confirm order Packaging Details Export standard container: 20GP or 40GP, 40HC
After-sales service provided Engineers available to service machinery overseas Product name Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Power Type 3phase,50hz,38v Max. Aggregate 80/60mm
Warranty twelve month Machine Type Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Color Customer Required Application Building Works
Brand Name ZHENHENG Model Number Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Certification SGS, ISO, BV, CE Place of Origin HENAN CHINA
High Light YHZM20 Mobile Concrete Mixer ,40HC*2 Mobile Concrete Mixer ,YHZM20 mobile ready mix concrete plant

Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer

 

Product Description of Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer


Principles of Mobile Concrete Batching Plant:
Mobile concrete batching plant is consist of aggregate loading system, electric auto-measurement system. The core of the whole system is the auto-measurement controlled by computer, which will operate the feeding quantity of cement, sand, gravel, keep the mixture ratio of concrete strictly, to ensure the production quality.
The system works by high-tech of mechanical and electrical integration, establish the auto-running of electronic weighing and feeding trolley and chain procedures. It will also effective organized the generally used machinery in the construction enterprises, such as the concrete mixer, engineering vehicles, belt conveyors, etc, play their best performance.
 
Technical Parameters of 
JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant

No. Modle YHZM20
/ Theory Capacity 20m³/h
Loading Suggestion 40HC*2
Total Power 42kw
Total Weight 12T
1 Aggregate System
Modle PLD800-2Bins
Storage Vloume 4m³*2
Weighing Hopper 800L
Motor Power 4kw*2
2 Mixing System
Modle JZM500
Charging Volume 800L
Discharging Volume 500L
Theory Capacity 20 m³/h
Mixing Motor Power 4.5kw*2
Water Pump Power 0.75kw
Discharging Height 1100mm
3 Measurement System
Cement Weighing System Yes
Water Weighing System Yes
Additive Weighing System Yes
4 Pneumatic System
Air Compressor 0.36m³
5 Control System
Aotomatic Control Cabinet Yes
6 Screw Conveyor LSY219*6M*7.5kw
7 Cement Silo 50T*1


 
The main features of
JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant:
A: The overall layout
Modular design,easy to disassemble.
B:structure characteristics
Unique water supply lines, automatic water supply system, reduced water time and increased production efficiency by 20 %
C:Traction mode
Trailer traction, easy to move and walk.
D: Control System
One-button start mode, simple operation, stable and reliable performance.

a. Tires: Double tires, strong pressure bearing capacity, strong stability, non-slip.
b. Support leg: Quick disassemble and assembly, stabilize machine during work, protect tires, and extend service life.
c. Universal Steering wheel: can be dragged by a medium-sized forklift directly, ensure the direction changing stably.
d. Storage hopper base: moved from the middle to the front generating two advantages:
a). remaining space can be used for the generator, control cabinet, water tank, tool box, etc.;
b). shorten the length of the feeding belt and the feeding time, thereby shortening the single mixing cycle by 10s, and improving the working efficiency.
e. Support steel: Increase the bearing capacity of the chassis and extend the service life.
Compact structure: Movable completely, work on the supporting legs, No foundation needed.
 

Concrete Drum
1.Theory Capacity: 20 m³/h
2.Mixing Motor Power: 4.5kw*2
3.Water Pump Power: 0.75kw
4.Discharging Height: 1100mm(Adjustable)

Aggregate Batching Machine
1.Storage Volume: 4m³*2
2.Weighing Hopper: 800L
3.Motor Power: 4kw*2

Water, Cement and Additive Scales
1. Cement weighing accuracy: ±1%
2. Water weighing accuracy: ±1%
3. Additive weighing accuracy: ±1%

 

Certifications:

 

Since ZHENHENG has been established, we have paid the great attention to improvement our quality. In recent years, we have made breakthroughs in market access and qualification certification, provided equipment to consumers with excellent product quality.

 


Q: Can we visit your factory?
A: Yes. You can visit our factory at anytime you want.
Q: Can you put our logo on the machine?
A: Yes,it is available.LOGO and color are usually as per customer's requirement.
Q: What’s the warranty time?
A: From the date of shipment, 1 year or 1500working hours, whichever comes first.
Q: What’s your payment term?
A: We accept T/T(30% down payment and balance before shipping) and L/C mostly, but if you prefer other payment terms please contact us for further information.
Q: How long is your delivery time?
A: Usually, it is 7-10 workdays if the goods are in stock, or it is 15-20 working days if the goods are not in stock, it is according to quantity.
 
More photos of 
JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1982

  • Total Annual:

    10000000-30000000

  • Employee Number:

    300~500

  • Ecer Certification:

    Active Member

  Founded in 1982, Zhengzhou Zhenheng Construction Equipment Company Limited is a large high-tech enterprise, which integrates manufacturing, sales, service, research and development.Withthe continuous innovation, stable product quality and professional after-sales service, we have won the g...   Founded in 1982, Zhengzhou Zhenheng Construction Equipment Company Limited is a large high-tech enterprise, which integrates manufacturing, sales, service, research and development.Withthe continuous innovation, stable product quality and professional after-sales service, we have won the g...

+ Read More

Get in touch with us

  • Reach Us
  • Zhengzhou Zhenheng Construction Equipment Co., Ltd.
  • Chengguan Brick Field, Zhengshang Road, Xingyang of Zhengzhou City, Henan Province, CN
  • https://www.concrete-batchmixplant.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement