| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 100000M |
| Delivery Time | 20-25 Work days |
| Packaging Details | Pallet |
| Material | Q235 Steel,Q345 Steel |
| Size | Customized,Modu;lar Size |
| feature | Multi-level platform,Safe and efficient |
| Color | Customer Requirements,Silver |
| Surface | Hot Dipped Galvanized,Galvanizing |
| Brand Name | ForPro |
| Model Number | Modular Scaffolding |
| Certification | ISO and CE |
| Place of Origin | Shanghai |
View Detail Information
Explore similar products
High Building Projects Stair Scaffolding System
Forpro Shoring Tower Scaffolding For Highway Bridge
High Bearing Capacity Scaffolding In Building Construction Q235 Steel Material
Safety Scaffold Tag Ringlock Construction Scaffolding Hot Dipped Galvanized
Product Specification
| Payment Terms | L/C, T/T, Western Union | Supply Ability | 100000M |
| Delivery Time | 20-25 Work days | Packaging Details | Pallet |
| Material | Q235 Steel,Q345 Steel | Size | Customized,Modu;lar Size |
| feature | Multi-level platform,Safe and efficient | Color | Customer Requirements,Silver |
| Surface | Hot Dipped Galvanized,Galvanizing | Brand Name | ForPro |
| Model Number | Modular Scaffolding | Certification | ISO and CE |
| Place of Origin | Shanghai | ||
| High Light | frame type scaffolding ,ringlock scaffolding system | ||
Reinforcement Installation Platform With Ring Lock Scaffolding for Housing Projects construction
Product description
Forpro reinforcement scaffolding platform is designed for daily works on jobsite, With mudular ring lock scaffodling tubes integrity with alumi-board and, the platform can be assembled with any height and width. The ring lock scaffolding tube is available with a basic height of 1m and 2m, the horizontal connecting tube is available with a basic width 2m,2.5m and 3m. The reinforcement scaffolding platform unit can be moved to new position with crane or special trolley. Thanks for this modular reinforcement platform, Site performance can be more quick and safe.
Component
• Basic ring-lock scaffolding tube
• Horizontal connecting tube
• Side guarding rail
• Adjustable foot jack
• Punched Alumi board
![]()
Technical parameter
• Standard height of ring-lock scaffolding tube is 1m, 2m
• Standard width of horizontal connecting tube is 2m,2.5m,3.0m
• Level of platform 3 level
• Load capacity 20kN/m2/per level
• Surface treatment: hot galvanize
Applied Field
• Site reinforcement installation
• Site formwork erection and dismantle
• Concrete surface reparing
• Other site operation at a height of approx.6m
![]()
Company Details
Business Type:
Manufacturer,Trading Company,Seller,Other
Year Established:
2015
Total Annual:
11000000USD-15000000
Employee Number:
85~100
Ecer Certification:
Active Member
ForPro Formwork Technology (Shanghai) Co., Ltd. is a professional formwork technology company focusing on formwork system research and development, design and production. Our own brand "ForPro", derived from Formwork • Profession, represents the our development philosophy: f... ForPro Formwork Technology (Shanghai) Co., Ltd. is a professional formwork technology company focusing on formwork system research and development, design and production. Our own brand "ForPro", derived from Formwork • Profession, represents the our development philosophy: f...
Get in touch with us
Leave a Message, we will call you back quickly!