| Packaging Details | In bulk,pallet,bundle or according the customer demand |
| Delivery Time | After deposit 15-20 days |
| Payment Terms | T/T L/C (bank transfer) |
| Supply Ability | 100sets/day |
| Place of Origin | Beijing, China (Mainland) |
| Brand Name | ZULIN |
| Certification | ISO9001-2008 |
| Model Number | Shifting trolley |
View Detail Information
Explore similar products
Lifting fork used with bearing load 1 - 1.5T for Table Formwork units
High stability Lifting fork used for lifting table formwork units
Beam clamp with High efficiency for supporting beam Table Formwork
High efficiency Beam clamp with plywood as the panel
Product Specification
| Packaging Details | In bulk,pallet,bundle or according the customer demand | Delivery Time | After deposit 15-20 days |
| Payment Terms | T/T L/C (bank transfer) | Supply Ability | 100sets/day |
| Place of Origin | Beijing, China (Mainland) | Brand Name | ZULIN |
| Certification | ISO9001-2008 | Model Number | Shifting trolley |
| High Light | plastic formwork , table formwork system | ||
Adjustable Height Table Formwork Shifting Trolley with Attached Frame Construction Equipment
Descrition:
Shifting trolley is used for transporting the table formwork unit on the same floor. It mainly consists of two parts,
the standard device and attached frame(if needed). During transporting, push the shifting trolley to the place just
below the center of table formwork unit, adjust the height of the trolley manually by a handle, and lift the formwork
unit.Then move the trolley (with the formwork unit on it) to the designated position, lower the trolley manually, leave
the table formwork unit on the ground and finally remove the trolley.
Height:
※ Standard device
Hmin = 1750mm Hmax = 3250mm
※ Standard device with an attached frame
Hmin = 2500mm Hmax = 3900mm
Bearing load:
※ Standard device:1100kg(11kN)
※ Standard device with an attached frame:1000kg(10kN)
Move the table formwork on the same floor
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller
Year Established:
2003
Total Annual:
>50 Million
Employee Number:
500~1000
Ecer Certification:
Verified Supplier
As a professional formwork company, Beijing Zulin Formwork & Scaffolding Co., Ltd., dedicates to the design, manufacture and supply of formwork and scaffolding in fields of Civil Engineering, Bridge-Road Projects,Hydroelectricity & Dam projects. We have advanced productio... As a professional formwork company, Beijing Zulin Formwork & Scaffolding Co., Ltd., dedicates to the design, manufacture and supply of formwork and scaffolding in fields of Civil Engineering, Bridge-Road Projects,Hydroelectricity & Dam projects. We have advanced productio...
Get in touch with us
Leave a Message, we will call you back quickly!