Payment Terms | L/C, T/T |
Supply Ability | 200pcs/month |
Delivery Time | 3days |
Packaging Details | Export standards |
Adapted models | pump truck |
Factory code | 1040500218 |
Weight | 0.006kg |
Brand Name | OEM |
Model Number | GB119.1-2000 8*16 |
Place of Origin | Chang sha China |
View Detail Information
Explore similar products
Outrigger Block 500*500*50MM 600*600*60MM Zoomlion Concrete Pump Parts
Steel Zoomlion Removing Wrench For Removing Replacing Concrete Pistons
S-Valve Wrench Zoomlion Concrete Pump Parts
Copper Clad Laminate PTO Module Zoomlion Concrete Pump Parts
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 200pcs/month |
Delivery Time | 3days | Packaging Details | Export standards |
Adapted models | pump truck | Factory code | 1040500218 |
Weight | 0.006kg | Brand Name | OEM |
Model Number | GB119.1-2000 8*16 | Place of Origin | Chang sha China |
High Light | Zoomlion Concrete Pump Key ,Zoomlion Concrete Pump Half Shaft ,Zoomlion Concrete Pump Parts 1040500218 |
The locating pin on the mixing half-shaft of a Zoomlion concrete pump truck serves specific functions and plays a crucial role in the mixing process. Here is a description of its functionality:
Shaft Alignment: The primary function of the locating pin is to ensure proper alignment of the mixing half-shaft. It serves as a guide that positions the mixing half-shaft accurately within the mixer assembly. This alignment is crucial for maintaining the integrity and effectiveness of the mixing process.
Prevents Shaft Rotation: The locating pin helps prevent rotational movement of the mixing half-shaft. It acts as a fixed point that keeps the shaft in place, preventing it from rotating or shifting during the mixing operation. This stability ensures that the mixing half-shaft remains securely positioned, allowing for consistent and reliable mixing performance.
Load Distribution: The locating pin assists in distributing the load and forces exerted on the mixing half-shaft. By providing a fixed reference point, it helps evenly distribute the applied forces across the shaft and associated components. This load distribution minimizes the risk of localized stress concentrations, reducing wear and ensuring the longevity of the mixing system.
Easy Assembly and Disassembly: The locating pin facilitates the easy assembly and disassembly of the mixing half-shaft. It serves as a guide that aids in aligning and inserting the shaft into the appropriate position within the mixer assembly. During disassembly, the locating pin allows for quick and efficient removal of the mixing half-shaft for maintenance or replacement purposes.
Enhanced Safety: The locating pin enhances the safety of the mixing process by ensuring that the mixing half-shaft remains securely positioned. It prevents the shaft from becoming dislodged or misaligned, reducing the risk of equipment malfunctions or accidents during operation. The presence of the locating pin contributes to a safer working environment for operators and maintenance personnel.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2020
Total Annual:
200-500
Employee Number:
55~100
Ecer Certification:
Verified Supplier
Changsha Tongchuang Mechanical Co., Ltd. is located in Changsha, Hunan, the capital of China's construction machinery. It is a service-oriented company integrating production, whole machine maintenance and remanufacturing, second-hand equipment, spare parts sales, new material application and ex... Changsha Tongchuang Mechanical Co., Ltd. is located in Changsha, Hunan, the capital of China's construction machinery. It is a service-oriented company integrating production, whole machine maintenance and remanufacturing, second-hand equipment, spare parts sales, new material application and ex...
Get in touch with us
Leave a Message, we will call you back quickly!