
Suzhou Huajing Air-Condition Purification Engineering Installation Co., Ltd.
| Applicable Industries | Manufacturing Plant, Food & Beverage Factory, Cosmetics, Electronics, Laboratories, Clean Room, Dust-free Workshop, Hospitals |
| Material | Rock wool sandwich panel or hollow glass magnesium sandwich Panel |
| Work Scope | Construction, HVAC, Electric, Process piping |
| Payment Terms | L/C,T/T |
| Cleanliness | Class 100 to Class 100,000 |
| HEPA Filter | 99.995%@0.3um or as required |
| Packaging Details | Wooden Case, Galvanized Steel Pallet, Plastic Film |
| Delivery Time | 30 days |
| Supply Ability | ≥1 set |
| Warranty of core components | 1 Year |
| Key Words | Turnkey Solution Clean Room |
| Certificate | CE ISO |
| Item Name | GMP Clean Room |
| Machinery Test Report | Provided |
| Brand Name | SHP |
| Model Number | Customized |
| Certification | CE、ISO |
| Place of Origin | China |
View Detail Information
Explore similar products
Modular Designs for Laboratory Clean Room Operation Theatre in Hospital Workshop
Electronics Industry Cleanroom Project with Hollow Glass Magnesium Sandwich
Industrial ESD-Safe Modular Clean Room Suite with Conductive Flooring for Micro
Premier Unitary Modular Cleanroom Engineering with Seamless Interior for
Product Specification
| Applicable Industries | Manufacturing Plant, Food & Beverage Factory, Cosmetics, Electronics, Laboratories, Clean Room, Dust-free Workshop, Hospitals | Material | Rock wool sandwich panel or hollow glass magnesium sandwich Panel |
| Work Scope | Construction, HVAC, Electric, Process piping | Payment Terms | L/C,T/T |
| Cleanliness | Class 100 to Class 100,000 | HEPA Filter | 99.995%@0.3um or as required |
| Packaging Details | Wooden Case, Galvanized Steel Pallet, Plastic Film | Delivery Time | 30 days |
| Supply Ability | ≥1 set | Warranty of core components | 1 Year |
| Key Words | Turnkey Solution Clean Room | Certificate | CE ISO |
| Item Name | GMP Clean Room | Machinery Test Report | Provided |
| Brand Name | SHP | Model Number | Customized |
| Certification | CE、ISO | Place of Origin | China |
| High Light | CE cleanroom supplies ,ISO cleanroom supplies ,prefab clean rooms anti static | ||
![]()
According to ISO 14644-1, a cleanroom is "a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner to minimize the introduction, generation, and retention of particles inside the room, and in which other relevant parameters (e.g., temperature, humidity, pressure) are controlled as necessary."
| Application | Pharmaceutical | Lab | Electronics |
| Cleanliness | China class 100 to 100000 | ISO 5 to 8 | EU B to D |
| Scope |
Structure part; Partition and ceiling panel; door and window,epoxy. |
HVAC part; AHU and chiller; Ducting and piping. |
Electrical part; Lamp,switch and socket; Distribution cabinet. |
| Service | Design and production | Construction and test | Validation and training |
| Wall/ceiling panel | Machine-made or Hand-made sandwich board |
| Clean room equipment | Air shower,FFU,Pass box,Laminar flow cabinet,hepa box |
| Cleanliness | Class 100-100000 |
| Purification system | HVAC, or AC conditioner+FFU |
| Floor | PVC anti-static floor or epoxy-based coating |
| Other addessores | stalinite window,LED panel light,Door,Hand wash sink,storage/shoe cabinet etc |
| Service | Design,manufacturing,construction |
Tier 1: Environmental Parameter Control
Function: Establish and maintain baseline physical constants
Air Purity Management: HEPA/ULPA filtration with real-time particulate monitoring
Thermodynamic Stability: Precision HVAC systems maintaining ±0.5°C temperature and ±5% RH humidity control
Pressure Differential Enforcement: Automated pressure cascades (15-30 Pa gradients between zones)
Tier 2: Contaminant Vector Management
Function: Intercept contamination at all transmission pathways
Aerodynamic Contamination Control: Unidirectional airflow at 0.45 m/s ±20% (ISO Class 5)
Surface-Borne Contaminant Mitigation: Non-shedding materials with cleanroom-grade surface finishes
Procedural Contamination Prevention: Gowning protocols with particle shedding limits (<10,000 particles/min for full suit)
Tier 3: Operational Process Control
Function: Standardize all interactions with the controlled environment
Material Flow Engineering: Three-stage airlock systems with interlocked doors
Personnel Contamination Control: Class-specific garment systems with validated donning procedures
Process Isolation: Modular cleanroom designs allowing separation of incompatible operations
Tier 4: Performance Verification Systems
Continuous Monitoring: Networked particle counters with 0.3μm and 0.5μm channels
Validation Protocols: ISO 14644-3 compliant testing (airflow uniformity, recovery testing)
Data Integrity Management: 21 CFR Part 11 compliant data logging and audit trails
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2003
Total Annual:
4000000-5000000
Employee Number:
20~50
Ecer Certification:
Verified Supplier
Established in 2003 20+ years cleanroom experience 10000+SQ.M workshop Main products:Cleanroom,HVAC,Air Shower, FFU,Pass Box,HEPA Box,Clean Bench,LAF,Cleanroom Door, Cleanroom Window,Sandwich Panel Established in 2003 20+ years cleanroom experience 10000+SQ.M workshop Main products:Cleanroom,HVAC,Air Shower, FFU,Pass Box,HEPA Box,Clean Bench,LAF,Cleanroom Door, Cleanroom Window,Sandwich Panel
Get in touch with us
Leave a Message, we will call you back quickly!