| Payment Terms | L/C,T/T,D/P,D/A |
| Supply Ability | 99 |
| Delivery Time | 3-7 work days |
| Packaging Details | Neutral Package |
| Compatible Brands | Kobelco |
| Compatible Equipment | SK200-8 |
| Packing | Carton |
| Corrosionresistance | Yes |
| Condition | New |
| Quality Control | Professional Inspection |
| Payment | TT.Money Gram.Western Union. Paypal |
| Delivery time | 3-7 Days |
| Shipment | DHL FEDEX TNT EMS UPS |
| Brand Name | Kobelco |
| Model Number | SK200-8 |
| Place of Origin | China |
View Detail Information
Explore similar products
DX530-7 Complete Swing Motor Assembly High Torque Doosan Swing Motor
PC120 Travel Motor Gearbox Low Noise Final Drive Gearbox For Komatsu PC120
228-3238 20R6810 Excavator Hydraulic Motor 374D 325D 329D Cat Excavator Final
E330D Excavator Travel Device Heavy Duty Travel Motor Assembly For CAT E330D
Product Specification
| Payment Terms | L/C,T/T,D/P,D/A | Supply Ability | 99 |
| Delivery Time | 3-7 work days | Packaging Details | Neutral Package |
| Compatible Brands | Kobelco | Compatible Equipment | SK200-8 |
| Packing | Carton | Corrosionresistance | Yes |
| Condition | New | Quality Control | Professional Inspection |
| Payment | TT.Money Gram.Western Union. Paypal | Delivery time | 3-7 Days |
| Shipment | DHL FEDEX TNT EMS UPS | Brand Name | Kobelco |
| Model Number | SK200-8 | Place of Origin | China |
| High Light | 1st Planet Carrier Assembly ,2nd Planet Carrier Assembly ,SK200-8 Gearbox Carrier | ||
Excavator Hydraulic Motor 1st & 2nd Stage for SK200-8 Swing Reduction Gearbox
Restore smooth and powerful swing operation to your Kobelco excavator with this premium 1st and 2nd stage swing carrier assembly, engineered as a direct OEM replacement for the Kobelco SK200-8 swing reduction gearbox. As the core load-bearing component of the swing drive system, this assembly transmits torque from the swing motor to the excavator superstructure, enabling precise 360° rotation. Manufactured to exact factory specifications, it resolves common swing system issues including weak rotation, abnormal noise, and gear slippage. Each assembly comes fully pre-assembled with all planetary gears and bearings, eliminating the need for separate component sourcing and reducing installation time by up to 60%.
| Parameter | Specification |
|---|---|
| Product Name | Swing Gearbox Stage 1 & Stage 2 Planetary Carrier Assembly |
| Compatible Excavator | SK200-8 (also fits SK210-8, SK200-6E) |
| Reduction Stage | Stage 1 (First Stage) + Stage 2 (Second Stage) Planetary Gear Set |
| Gear Type | Planetary Gear (Sun Gear, Planet Gears, Ring Gear, Carrier) |
| Gear Material | High-strength alloy steel (20CrMnTi or equivalent) |
| Heat Treatment | Carburizing and quenching for high surface hardness (HRC 58-62) |
| Number of Planet Gears | Stage 1: 3 planet gears / Stage 2: 3 planet gears |
| Spline Profile | Inner spline matches swing motor output shaft (standard SK200-8 spec) |
| Bearing Type | High-precision tapered roller bearings (compatible with OEM) |
| Application | Swing reduction gearbox assembly, reduces motor speed to provide high torque for excavator upper structure rotation |
| Condition | New aftermarket replacement, 100% interchangeable with OEM parts |
| Key Features | High torque capacity, low backlash, wear-resistant, direct bolt-on fit, no modification needed |
![]()
![]()
![]()
![]()
![]()
![]()
Company Details
Business Type:
Distributor/Wholesaler,Trading Company
Year Established:
2008
Total Annual:
10000000¥-100000000¥
Employee Number:
50~150
Ecer Certification:
Verified Supplier
Guangzhou Lanxin Machinery Equipment Co., Ltd., established in 2008, is a professional supplier of excavator parts and mining equipment parts located in Guangzhou, Guangdong Province, China. Focusing on engineering components, and leveraging 18 years of professional experience in the construction ma... Guangzhou Lanxin Machinery Equipment Co., Ltd., established in 2008, is a professional supplier of excavator parts and mining equipment parts located in Guangzhou, Guangdong Province, China. Focusing on engineering components, and leveraging 18 years of professional experience in the construction ma...
Get in touch with us
Leave a Message, we will call you back quickly!