| Payment Terms | L/C,D/A,D/P,T/T,Western Union |
| Supply Ability | 100000pcs/week |
| Delivery Time | 10-15days |
| Packaging Details | 1000pcs/bag, carton package is possible |
| Name | Rebar Chair Spacer |
| Size | full sizes |
| Height | 20-35mm |
| Usage | Concrete slab |
| Brand Name | Duorui |
| Model Number | 30mm |
| Certification | ISO |
| Place of Origin | China |
View Detail Information
Explore similar products
Construction Rebar Clip Plastic Spacer Bar Chair Spacer for Concrete Rebar
Full Range High Strength PP Chair Spacer
Cheap Formwork Reinforced Plastic Rebar Clip Spacer 1000-5000pcs/bag
High Duty Plastic Wheel Spacer
Product Specification
| Payment Terms | L/C,D/A,D/P,T/T,Western Union | Supply Ability | 100000pcs/week |
| Delivery Time | 10-15days | Packaging Details | 1000pcs/bag, carton package is possible |
| Name | Rebar Chair Spacer | Size | full sizes |
| Height | 20-35mm | Usage | Concrete slab |
| Brand Name | Duorui | Model Number | 30mm |
| Certification | ISO | Place of Origin | China |
Plastic Spacers Slab Ground Chair PP Building Concrete Rebar Spacer
Our high quality rebar wheel spacers are designed to maintain the precise concrete cover for reinforcing steel from vertical and horizontal structures. The "clip-on" design makes it easy to install onto different rebar sizes, ensuring the steel remains centered within the formwork, preventing corrosion and structural weakness.
Universal rebar spacers are commonly applied in slabs, beams, columns, walls, roads, bridges, tunnels, and precast concrete parts.
Specification of Plastic Spacers Slab Ground Chair PP Building Concrete Rebar Spacer:
| Name | PP rebar chair spacers |
| Size | 20mm, 25mm, 30mm |
| Reabr size | 6-20mm diameter rebar |
| Material | High quality PP |
| Package | 1000pcs/bag |
| Sample | Free sample can be offered |
| OEM | We have rich experience for making customized products and different sizes |
Please feel free to contact us for more plastic construction products.
![]()
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2012
Total Annual:
5000000-8000000
Employee Number:
25~50
Ecer Certification:
Verified Supplier
Zhengzhou Duorui Enterprise Co., Ltd was established in 2012, after 12 years development, our products have evolved and expanded in reinforcement and formwork accessories, like tie rod, wing nut, water stopper, prop sleeve, pin, scaffolding coupler etc. and plastic building materials, such as d... Zhengzhou Duorui Enterprise Co., Ltd was established in 2012, after 12 years development, our products have evolved and expanded in reinforcement and formwork accessories, like tie rod, wing nut, water stopper, prop sleeve, pin, scaffolding coupler etc. and plastic building materials, such as d...
Get in touch with us
Leave a Message, we will call you back quickly!