| Payment Terms | L/C, T/T |
| Supply Ability | 150 units per month |
| Delivery Time | 25 days |
| Power Supply | 380V~480V 50/60Hz, Three Phase |
| Loder Weight | 2000kg |
| Motor Control | VFC (Variable Frequency Control) |
| Mast Finish | Galvanised |
| Surface Treatment | Sand Blasting And Paint Or Galvanized |
| Voltage | 380V |
| Safety Features | Emergency Stop Button, Overload Protection |
| Description | SC200BZ construction site hoist |
| Standard | EU regulations |
| Mast Type | Square Column with bolted rack |
| Motor | Frequency Control (FC) |
| Lifting Speed | 0-60m/min |
| Cage Size | Customized |
| Applying Location | Construction site, plants, etc. |
| Design | According to European regulation |
| Brand Name | KANGBO |
| Model Number | SC200 FIC-12 |
| Certification | TUV |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
Rack Pinion Type VFD Single Cage Modular Material Hoist Construction
VFD One Cage Material Rack & Pinion Hoist
Rack And Pinion Heavy Payload SC250BG KP-B19 Construction Site Hoist
Twin Cage VFD SC100/100(BZ) KP-B02 Rack Pinion Hoist
Product Specification
| Payment Terms | L/C, T/T | Supply Ability | 150 units per month |
| Delivery Time | 25 days | Power Supply | 380V~480V 50/60Hz, Three Phase |
| Loder Weight | 2000kg | Motor Control | VFC (Variable Frequency Control) |
| Mast Finish | Galvanised | Surface Treatment | Sand Blasting And Paint Or Galvanized |
| Voltage | 380V | Safety Features | Emergency Stop Button, Overload Protection |
| Description | SC200BZ construction site hoist | Standard | EU regulations |
| Mast Type | Square Column with bolted rack | Motor | Frequency Control (FC) |
| Lifting Speed | 0-60m/min | Cage Size | Customized |
| Applying Location | Construction site, plants, etc. | Design | According to European regulation |
| Brand Name | KANGBO | Model Number | SC200 FIC-12 |
| Certification | TUV | Place of Origin | CHINA |
| High Light | Rack and Pinion Construction Hoist ,SC200/200 Construction Hoist ,Material Construction Hoist | ||
Construction Hoist SC200/200 FIC-12 Fully Intelligent Control passenger and material Rack and Pinion Lift
| Item & Article No. | SC200/200 FIC-12 |
| Number of Cages | 2 Cages |
| Payload Capacity | 2,000 KG each Cage |
| Lifting Speed | 0–60 meter/minute, fully loaded |
| Max. Lifting Height | 250 m / 450 m * |
| Cage Size (internal) | 3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage |
| Cage Doors | Modularized Entrance Door and Discharge Door, and Third Door at the long side of cage |
| Engine Power | 3*15 KW each Cage; 2*3*15 KW Totally. |
| Motor Control | Frequency Control (FC) |
| Invertor Power (KW) | 1*55 KW each Cage; 2*55 KW Totally. |
| Gearbox | Helical Gearbox |
| Safety Device Type | Centrifugal Brake |
| Power Supply Range | 380–500 V, 50 or 60 Hz, 3 Phase |
| Mast Section | Square Column 650*650*1508 mm with Bolted Rack |
| Rack Module | 8 |
| * Increased lifting height on request. 250 m with step-up transformer only. 400 m with step-up/step-down transformer. | |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1997
Total Annual:
55,000,000-65,000,000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
Xiamen KANGBO Machinery Group Co., Ltd., has been specializing in manufacturing Construction Hoists and Hoist Spare Parts for more than 20 years. Products: Construction Hoists and Spare Parts Capacity: Annual sales quantity is more than 3500 units Construction Hoist. With experianced me... Xiamen KANGBO Machinery Group Co., Ltd., has been specializing in manufacturing Construction Hoists and Hoist Spare Parts for more than 20 years. Products: Construction Hoists and Spare Parts Capacity: Annual sales quantity is more than 3500 units Construction Hoist. With experianced me...
Get in touch with us
Leave a Message, we will call you back quickly!