Payment Terms | Western Union, MoneyGram, L/C, T/T |
Supply Ability | 1000000 Piece/Pieces per Month |
Delivery Time | 3-5 weeks according to detail product or as per PO demand quantity |
Packaging Details | All the goods of custom made aluminum spinning parts are well packed in cartons and then in wooden crate outside |
Material | Aluminium |
Color | Silver |
Surface Treatment | Matt Finish, Sand Blasting Etc |
MOQ | 100 Pieces |
Thickness | 0.5mm-2.5mm |
Size | As Your Drawings |
Tolerance | ±0.02mm |
Standard | ASTM/ANSI/GOST/EN/GB |
Brand Name | HIGHV |
Model Number | CUSTOM MADE |
Certification | ISO/SGS |
Place of Origin | CHINA MAINLAND |
View Detail Information
Explore similar products
Thin Wall Spun Metal Parts , High Material Utilization Metal Spinning Parts
Metal Spinning Spare Parts 3mm Thickness Brass Home Decoration Applied
Metal Spinning Spare Parts 2mm Thickness Customized Color High Capacity
Bronze Plating Brushing Spare Parts For Machinery , Die Casting Spinning Spares
Product Specification
Payment Terms | Western Union, MoneyGram, L/C, T/T | Supply Ability | 1000000 Piece/Pieces per Month |
Delivery Time | 3-5 weeks according to detail product or as per PO demand quantity | Packaging Details | All the goods of custom made aluminum spinning parts are well packed in cartons and then in wooden crate outside |
Material | Aluminium | Color | Silver |
Surface Treatment | Matt Finish, Sand Blasting Etc | MOQ | 100 Pieces |
Thickness | 0.5mm-2.5mm | Size | As Your Drawings |
Tolerance | ±0.02mm | Standard | ASTM/ANSI/GOST/EN/GB |
Brand Name | HIGHV | Model Number | CUSTOM MADE |
Certification | ISO/SGS | Place of Origin | CHINA MAINLAND |
High Light | spun metal parts ,metal spinning parts |
OEM CNC Aluminium Spinning Part For Automotive And Mechanical Industry
Metal Spinning is the production process of manufacturing sheet metal into circular hollow components.
On a spinning lathe, a circular blank is clamped against a spinning die and with a series of sweeping motions the blank is formed around the die into the needed shape.
Product Description:
Dimension | According to customer's drawing. |
Materials Available | 1.Stainless Steel: SS201, SS304, SS316L, SS420 |
2 Steel: C45(K1045), C46(K1046), C20 | |
3.Brass: C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40) | |
4.Bronze: C51000, C52100, C54400, etc | |
5.Iron: 1213, 12L14,1215 | |
6.Aluminum: Al6061, Al6063, Al7075, Al5052, Al2017 or customize | |
7 OEM according to your request | |
Products Available | Lamps and lanterns, Auto parts, Machinery parts and kitchenware and so on |
Surface Finish | annealing, natural anodization, heat treatment, polishing, nickel plating, chrome plating, yellow passivation, gold passivation, galvanizing, satin, etc |
Processing Method | Deep draw, spinning, bending, stamping, cnc machining, turning, milling, drilling, grinding, broaching, welding and assembly |
Advantages | 1. Competitive price with good quality |
2. Low MOQ (100pcs is even acceptable in some special conditions) | |
3. Short lead time (7-20 working days according to order quantity) | |
4. Customized size and specification /OEM available | |
Package | Suitable for sea and air transportation or as your required |
Certificate | ISO9001:2008, SGS |
Lead Time | 10 days to 30 days according to order quantity. |
Advantages:
Our service:
1. Payment term: T/T 30% deposit after order confirmed, 70% balance paid before shipment.
2. Accepted delivery terms: Ex-factory price; FOB; CIF; CFR etc.
3. Delivery time : Normally in 15-30 days after deposit received.
4. Sample policy : Samples are always available for each model . Samples can be ready within 15 days once payment received .
5. Shipping port: Shanghai, Ningbo of China.
We can according to your requirements of the design, material, specifications, packing to manage the product and welcome your drawing to us.
We guarantee that the products are high quality and delivery on time.
Packing Details:
The aluminium spinning parts packing can be done by wooden case and cartons.
1). Wooden Packing:
Wooden packing suitable for heavy weight parts. For export, Fumigation Certificate will be necessary when case is made of solid wood.
Fumigation Mark
Fumigation requirements:
1.No bark allowed on wooden package.
2.Ship fumigated wooden package as soon as possible, ensure separate storage and segregation with non-fumigated wooden materials.
3.Validity of the certificate of fumigation is 21 days.
Notes:
Inquire local ship agency whether fumigation is necessary every time after learning the lot package material, booking with a certain answer. Method of wood case fumigation include chemical preparation method and heat treatment.
2). Carton Packing:
Carton Packing always light weight and convenient for moving by hands. Its suitable for light weight aluminium spinnng parts.
Welcome to inquiry and detailed drawings here! Then the good quotation document will be sent soon.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
1993
Total Annual:
600 million-800 million
Employee Number:
520~600
Ecer Certification:
Active Member
About Us: YANGZHOU HIGHV MECHANICAL AND ELECTRICAL EQUIPMENT CO.,LTD. plant was established in 1993, located at the center of the economically developed Yangtze Delta, near to the biggest shipping port in China is called Shanghai Port. And Yangzhou is a beautiful city with convenie... About Us: YANGZHOU HIGHV MECHANICAL AND ELECTRICAL EQUIPMENT CO.,LTD. plant was established in 1993, located at the center of the economically developed Yangtze Delta, near to the biggest shipping port in China is called Shanghai Port. And Yangzhou is a beautiful city with convenie...
Get in touch with us
Leave a Message, we will call you back quickly!