| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 30 Sets per Month |
| Delivery Time | 60 days |
| Packaging Details | Plastic Film |
| Type | Thin Blade Slitter Scorer Machine |
| Key Selling Points | Thin Blade Slitter Scorer Cutting Creasing Machine |
| Application | Machinery & Hardware |
| QTY of blade/scorer | 5/6/7 |
| Keywords | Thin Blade Slitter Scorer Machine |
| Core Components | Gearbox, Gear, Bearing, Engine, Motor, PLC |
| Packaging type | Corrugated Paperboard Making |
| After-sales Service Provided | Engineer Service Overseas |
| Brand Name | YIKE GROUP |
| Model Number | YK-2750 |
| Certification | CE, ISO |
| Place of Origin | China |
View Detail Information
Explore similar products
Corrugated Paperboard Cutting Slitting Knife Tungsten Carbide Thin Blade
Hot Sale PLC Automatic Max.slitting width 2850mm Thin Blade Machine Corrugated
YK-2000 PLC Control Automatic Slitting Machine / Slitting Cutting Machine ISO
Manual Type YK-2000 Thin Blade Slitter Scorer Machine For Corrugated Board
Product Specification
| Payment Terms | L/C, T/T, Western Union | Supply Ability | 30 Sets per Month |
| Delivery Time | 60 days | Packaging Details | Plastic Film |
| Type | Thin Blade Slitter Scorer Machine | Key Selling Points | Thin Blade Slitter Scorer Cutting Creasing Machine |
| Application | Machinery & Hardware | QTY of blade/scorer | 5/6/7 |
| Keywords | Thin Blade Slitter Scorer Machine | Core Components | Gearbox, Gear, Bearing, Engine, Motor, PLC |
| Packaging type | Corrugated Paperboard Making | After-sales Service Provided | Engineer Service Overseas |
| Brand Name | YIKE GROUP | Model Number | YK-2750 |
| Certification | CE, ISO | Place of Origin | China |
YIKE GROUP 2750MM CNC Servo Motor PLC Control Thin Blade Slitter Scorer
Machine With Auto Change Order
PRODUCT SPECIFICATIONS
Human machine interface —PLC control,The system for robot operating system more humanized, simple structure, easy to maintain.
1.Manual/auto feeder is available
2. Pre pressing roller,slitting blade and scorer holder are auto adjusted
3.Grinding knife is auto/manual
4.Cardboard thickness and press power are auto adjusted(customer required)
5.Jog for fine-adjusted
6.Auto counter
7.Slitting and press line precision ±0.5mm
Auto slitter scorer :
8.Human machine interface —PLC control,cutter paper thin blade change order use stand alone stepper motor control,auto change order speed 1-20S,error precision±0.5 mm.
9. Operation humanized.,no technical content,worker use operation use easy.
10 Slitting part:Adopt high quality tungsten steel thin blade,sharp and long work life,slice more tidy,non-pressing and non-burr.
11.The two sides of thin blade are cut separately by rubber wheel press board,surmount not scorer,separate plate,off tracking ,to prevent the bad effect of straight line.
12.This machine can memory 999 group order,don’t need stop machine can change order and manual change order.
13.QR code change orders
![]()
![]()
![]()
![]()
![]()
YIKE GROUP Other type carton box making machine
![]()
![]()
![]()
![]()
![]()
![]()
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Seller
Year Established:
2002
Employee Number:
100~300
Ecer Certification:
Site Member
CHINA YIKE GROUP CO.,LTD was established in January of 2002, which is a high-tech enterprise, manufacture and sales of high level automatic corrugated cardboard production line, flexo printer slotter die cutter machine, Casemaker. Our Group implement the ISO 9001-2008, in s... CHINA YIKE GROUP CO.,LTD was established in January of 2002, which is a high-tech enterprise, manufacture and sales of high level automatic corrugated cardboard production line, flexo printer slotter die cutter machine, Casemaker. Our Group implement the ISO 9001-2008, in s...
Get in touch with us
Leave a Message, we will call you back quickly!