Payment Terms | TT |
Supply Ability | 20 sets per month |
Delivery Time | 40-50 working days |
Packaging Details | iron frame /plate |
Voltage | 220V or 380V or Customized |
material | SUS304 |
Type | Germinating and kilning box |
Condition: | New |
Application: | Produce malt |
grain | barley ,corn ,wheat |
capacity | 100 kg-5tons |
Brand Name | Gongda |
Model Number | GD-ZMJ-1000 |
Certification | CE, UL,ISO |
Place of Origin | China |
View Detail Information
Explore similar products
3 Kw Beer Membrane Filtration System Candle Type Diatomite Filter Machine
SUS304 Candle Type Diatomite Filter Machine
Filter Press Proposal Packaging Production Line Equipment Glass Bottle Filling
Filter Press Proposal Packing Production Line Aerated Beverage Mixer
Product Specification
Payment Terms | TT | Supply Ability | 20 sets per month |
Delivery Time | 40-50 working days | Packaging Details | iron frame /plate |
Voltage | 220V or 380V or Customized | material | SUS304 |
Type | Germinating and kilning box | Condition: | New |
Application: | Produce malt | grain | barley ,corn ,wheat |
capacity | 100 kg-5tons | Brand Name | Gongda |
Model Number | GD-ZMJ-1000 | Certification | CE, UL,ISO |
Place of Origin | China | ||
High Light | keg washer filler ,monoblock filler and capper |
1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant
1 | Germinating and kilning box |
1. Capacity: 1T/Batch; Including Sieve Plate will be designed according to your plant area; Malt Turner Boosting Speed: |
set |
1 | SS304 |
NOTE:
1. The above price is based on EXW Qihe basis.
2. Payment Term: T/T (50% payment in advance, 50% before shipment)
3. The offer is valid in 30days.
4. This price doesn’t include the installation and testing costs in field fabrication.
5. If buyer asks seller to provide staffs to install and adjust equipments, buyer is responsible for these staffs’ tickets, visa, wages, accommodation.
Operation
1) Turn on master switch for power supply.
2) Turn on water valve to add water into all water tanks. Be sure to reach water level specified. Turn on compressed air valve.
3) Press temperature control buttons to preheat water in tanks.
4) Set sterilizing temperature and temperature alarm (upper limit temperature and lower limit temperature) in Temperature controller. In general, you just need to set sterilizing temperature.
5) Turn on steam valve manually to preheat water in water tank at cooling section. Water temperature is displayed on thermometer.
6) When water temperature reaches the set point (PV display area), start bottle input /output conveyors to transfer full bottles into this machine.
7) When you finish sterilizing operation, you shall turn off steam valves and water supply valves at first, then stop all spray pumps, at last, stop mesh belt conveyor and bottle input /output conveyors.
.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Seller
Year Established:
1997
Total Annual:
20000000-40000000
Employee Number:
200~500
Ecer Certification:
Site Member
dehui established in 1997,headquartered in Jinan,Shandong provide,registered capital 52,300,000,with more than 800 staff.The company is a High-tech enterprise on the fermentation field,and the productive modern service enterprise on the fermentation field.Provide the customers with the systemic solu... dehui established in 1997,headquartered in Jinan,Shandong provide,registered capital 52,300,000,with more than 800 staff.The company is a High-tech enterprise on the fermentation field,and the productive modern service enterprise on the fermentation field.Provide the customers with the systemic solu...
Get in touch with us
Leave a Message, we will call you back quickly!