Payment Terms | L/C,T/T |
Supply Ability | Supply According to Customer Needs |
Delivery Time | According to Order Confirmation |
Packaging Details | Packing According to Customer Requirements |
Max. Lifting Capacity | 220 tons |
Heavy Boom Length | 24-84m |
Rammer Hoisting Height | 20m |
Total Mass | 530t |
Main Boom Length | 19-28m |
Max Hoisting Torque | 1300(t.m) |
Rated Hammer Weight | 20t |
Gross Weight | 254t |
Brand Name | XCMG |
Model Number | XLC220 |
Place of Origin | China |
View Detail Information
Explore similar products
XCMG 130T Hydro Crawler Crane Convenient And Fast Choice
New Generation Hydraulic Crawler Crane Energy Saving 400Tons Crawler Crane
400T Hydraulic Crawler Crane 1.0km/H Propel Speed ACC4000A
1.3km/h 400T Crawler Crane Combined With Automated Construction
Product Specification
Payment Terms | L/C,T/T | Supply Ability | Supply According to Customer Needs |
Delivery Time | According to Order Confirmation | Packaging Details | Packing According to Customer Requirements |
Max. Lifting Capacity | 220 tons | Heavy Boom Length | 24-84m |
Rammer Hoisting Height | 20m | Total Mass | 530t |
Main Boom Length | 19-28m | Max Hoisting Torque | 1300(t.m) |
Rated Hammer Weight | 20t | Gross Weight | 254t |
Brand Name | XCMG | Model Number | XLC220 |
Place of Origin | China | ||
High Light | 220T crawler crane second hand ,Well maintained crawler crane ,220T hydraulic crawler |
Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m
Typical working conditions
Main boom working condition_No arm end pulley HB/1_65t+21t main boom main hook performance
Operating radius(m)
|
Main boom length(m) |
||||||||||
53 |
56 |
59 |
62 |
65 |
68 |
71* |
74* |
77* |
80* |
83* |
|
10 |
89.4 |
81.5 |
81.5 |
68.5 |
|
|
|
|
|
|
|
12 |
73.5 |
72.1 |
70.7 |
68.5 |
68 |
62.6 |
60.2 |
55 |
|
|
|
14 |
62 |
60.9 |
59.9 |
58.8 |
57.7 |
56.8 |
55.7 |
53.5 |
48.8 |
44.6 |
40.8 |
16 |
53.4 |
52.5 |
51.6 |
50.7 |
49.8 |
49.1 |
48.1 |
47.5 |
46.6 |
43.3 |
39.7 |
18 |
45.5 |
45.4 |
45.1 |
44.4 |
43.6 |
43 |
42.2 |
41.6 |
40.9 |
40.3 |
38.5 |
20 |
39.2 |
39.1 |
38.9 |
38.7 |
38.5 |
38 |
37.3 |
36.8 |
36.2 |
35.6 |
35 |
22 |
34.3 |
34.1 |
33.9 |
33.7 |
33.5 |
33.4 |
33.2 |
32.9 |
32.3 |
31.8 |
31.2 |
24 |
30.2 |
30.1 |
29.9 |
29.7 |
29.5 |
29.4 |
29.1 |
29.1 |
28.9 |
28.5 |
28 |
26 |
26.9 |
26.8 |
26.6 |
26.4 |
26.2 |
26.1 |
25.8 |
25.8 |
25.6 |
25.4 |
25.2 |
28 |
24.1 |
24 |
23.8 |
23.6 |
23.4 |
23.3 |
23 |
23 |
22.8 |
22.6 |
22.4 |
30 |
21.8 |
21.6 |
21.4 |
21.2 |
21 |
20.9 |
20.6 |
20.6 |
20.4 |
20.2 |
20 |
32 |
19.7 |
19.5 |
19.4 |
19.2 |
18.9 |
18.8 |
18.6 |
18.6 |
18.3 |
18.2 |
18 |
34 |
17.9 |
17.8 |
17.6 |
17.4 |
17.1 |
17.1 |
16.8 |
16.8 |
16.5 |
16.4 |
16.2 |
36 |
16.4 |
16.2 |
16 |
15.8 |
15.6 |
15.5 |
15.2 |
15.2 |
15 |
14.8 |
14.6 |
38 |
15 |
14.8 |
14.6 |
14.4 |
14.2 |
14.1 |
13.8 |
13.8 |
13.6 |
13.4 |
13.2 |
40 |
13.7 |
13.5 |
13.4 |
13.2 |
12.9 |
12.8 |
12.6 |
12.6 |
12.3 |
12.2 |
11.9 |
42 |
12.6 |
12.4 |
12.2 |
12 |
11.8 |
11.7 |
11.5 |
11.4 |
11.2 |
11.1 |
10.8 |
44 |
11.6 |
11.4 |
11.2 |
11 |
10.8 |
10.7 |
10.4 |
10.4 |
10.2 |
10.1 |
9.8 |
46 |
10.6 |
10.5 |
10.3 |
10.1 |
9.9 |
9.8 |
9.5 |
9.5 |
9.3 |
9.1 |
8.9 |
48 |
|
9.6 |
9.5 |
9.3 |
9 |
9 |
8.7 |
8.7 |
8.4 |
8.3 |
8.1 |
50 |
|
8.8 |
8.7 |
8.5 |
8.3 |
8.2 |
7.9 |
7.9 |
7.7 |
7.5 |
7.3 |
52 |
|
|
8 |
7.8 |
7.6 |
7.5 |
7.2 |
7.2 |
7 |
6.8 |
6.6 |
54 |
|
|
|
7.1 |
6.9 |
6.8 |
6.6 |
6.6 |
6.3 |
6.2 |
5.9 |
56 |
|
|
|
|
6.3 |
6.2 |
6 |
6 |
5.7 |
5.6 |
5.3 |
58 |
|
|
|
|
5.7 |
5.7 |
5.4 |
5.4 |
5.2 |
5 |
4.8 |
60 |
|
|
|
|
|
5.1 |
4.9 |
4.9 |
4.6 |
4.5 |
4.3 |
62 |
|
|
|
|
|
|
4.4 |
4.4 |
4.1 |
4 |
3.8 |
64 |
|
|
|
|
|
|
|
3.9 |
3.7 |
3.6 |
3.3 |
66 |
|
|
|
|
|
|
|
3.5 |
3.2 |
3.1 |
2.9 |
68 |
|
|
|
|
|
|
|
|
2.8 |
2.7 |
2.5 |
70 |
|
|
|
|
|
|
|
|
|
2.3 |
2.1 |
Magnification |
7 |
6 |
6 |
6 |
6 |
5 |
5 |
4 |
4 |
4 |
4 |
Notes:
1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.
Main boom working condition_No arm end pulley HB/1_55t+21t main boom main hook performance
Operating radius(m) |
Main boom length(m) |
|||||||||||
17 |
20 |
23 |
26 |
29 |
32 |
35 |
38 |
41 |
44 |
47 |
50 |
|
5 |
200 |
|
|
|
|
|
|
|
|
|
|
|
6 |
196 |
192 |
193.5 |
179 |
|
|
|
|
|
|
|
|
7 |
170 |
167 |
161 |
155 |
150 |
145 |
140 |
|
|
|
|
|
8 |
139 |
139 |
134 |
131 |
127 |
123 |
120 |
116 |
113 |
103 |
|
|
9 |
114 |
115 |
115 |
112 |
109 |
107 |
104 |
101 |
99.4 |
97 |
94.7 |
|
10 |
96.8 |
97.2 |
97.4 |
97.6 |
96.6 |
94.4 |
92.3 |
90.2 |
88.2 |
86.2 |
84.3 |
82.4 |
12 |
73.2 |
73.6 |
73.9 |
74 |
74.1 |
74.1 |
74.1 |
73 |
71.5 |
70.1 |
68.7 |
67.4 |
14 |
58.3 |
58.8 |
59 |
59.1 |
59.2 |
59.2 |
59.2 |
59.1 |
59 |
58.8 |
57.7 |
56.6 |
16 |
47.9 |
48.5 |
48.8 |
48.9 |
49 |
48.9 |
48.9 |
48.8 |
48.7 |
48.6 |
48.5 |
48.4 |
18 |
|
40.9 |
41.3 |
41.4 |
41.5 |
41.4 |
41.4 |
41.3 |
41.2 |
41.1 |
41 |
40.8 |
20 |
|
|
35.5 |
35.6 |
35.7 |
35.7 |
35.7 |
35.6 |
35.5 |
35.3 |
35.2 |
35.1 |
22 |
|
|
|
31.1 |
31.2 |
31.2 |
31.1 |
31 |
31 |
30.8 |
30.7 |
30.5 |
24 |
|
|
|
27.3 |
27.5 |
27.5 |
27.5 |
27.4 |
27.3 |
27.2 |
27 |
26.8 |
26 |
|
|
|
|
24.4 |
24.5 |
24.4 |
24.3 |
24.3 |
24.1 |
24 |
23.8 |
28 |
|
|
|
|
|
21.9 |
21.9 |
21.8 |
21.7 |
21.6 |
21.4 |
21.3 |
30 |
|
|
|
|
|
|
19.7 |
19.6 |
19.5 |
19.4 |
19.3 |
19.1 |
32 |
|
|
|
|
|
|
17.8 |
17.7 |
17.7 |
17.5 |
17.4 |
17.2 |
34 |
|
|
|
|
|
|
|
16.1 |
16 |
15.9 |
15.8 |
15.6 |
36 |
|
|
|
|
|
|
|
|
14.5 |
14.4 |
14.3 |
14.1 |
38 |
|
|
|
|
|
|
|
|
|
13.1 |
13 |
12.9 |
40 |
|
|
|
|
|
|
|
|
|
12 |
11.9 |
11.7 |
42 |
|
|
|
|
|
|
|
|
|
|
10.8 |
10.7 |
44 |
|
|
|
|
|
|
|
|
|
|
|
9.7 |
Magnification |
18 |
18 |
16 |
14 |
13 |
12 |
11 |
10 |
9 |
9 |
8 |
8 |
Notes:
1.When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Trading Company,Seller,Other
Year Established:
2015
Total Annual:
1000-5000
Ecer Certification:
Verified Supplier
Shandong Tengfei Hoisting Engineering Co., Ltd. is a Chinese company that sells second-hand crane equipment for self-use, with more than ten years of sales experience. All our crane equipment is from our own projects, the equipment is in good condition, there are no middlemen, and the price is bet... Shandong Tengfei Hoisting Engineering Co., Ltd. is a Chinese company that sells second-hand crane equipment for self-use, with more than ten years of sales experience. All our crane equipment is from our own projects, the equipment is in good condition, there are no middlemen, and the price is bet...
Get in touch with us
Leave a Message, we will call you back quickly!