China factories

China factory - Shandong Tengfei Hoisting Engineering Co., Ltd.

Shandong Tengfei Hoisting Engineering Co., Ltd.

  • China,Zibo ,Shandong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Lightweight Main Boom Assembly Hydraulic Crawler Crane Intermediate Sections Of
China Lightweight Main Boom Assembly Hydraulic Crawler Crane Intermediate Sections Of

  1. China Lightweight Main Boom Assembly Hydraulic Crawler Crane Intermediate Sections Of

Lightweight Main Boom Assembly Hydraulic Crawler Crane Intermediate Sections Of

  1. MOQ: One Crane
  2. Price: Negotiable Price
  3. Get Latest Price
Payment Terms L/C,T/T
Supply Ability Supply According to Customer Needs
Delivery Time According to Order Confirmation
Packaging Details Packing According to Customer Requirements
Hoist Speed 120m/min
Maximum Lifting Capacity 300 tons
Max. Luffing Jib Length 84m
Max. Boom Length 96m
Boom Length 91.4 m
Model XGC300
Fuel Tank Capacity 1,500 liters
Counterweight 100 tons
Crawler Length 10.5 m
Max. Travel Speed 1.5km/h
Brand Name XCMG
Model Number XGC 300t
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C,T/T Supply Ability Supply According to Customer Needs
Delivery Time According to Order Confirmation Packaging Details Packing According to Customer Requirements
Hoist Speed 120m/min Maximum Lifting Capacity 300 tons
Max. Luffing Jib Length 84m Max. Boom Length 96m
Boom Length 91.4 m Model XGC300
Fuel Tank Capacity 1,500 liters Counterweight 100 tons
Crawler Length 10.5 m Max. Travel Speed 1.5km/h
Brand Name XCMG Model Number XGC 300t
Place of Origin China
High Light lightweight boom crawler crane ,300t hydraulic crawler crane

XGC 300t(-I)Crawler Crane Technical Specifications


Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m

 

Light main boom working condition

 

A.Lightweight main boom section assembly without arm end pulley

 

Name and quantity

Lightweight main boom assembly

Main boom bottom section 10.5m

Main boom Intermediate section3m

Main boom Intermediate section

6m

Main boom Intermediate section

12mA

Main boom transition section7m

Tower arm middle section6mA

Tower arm middle section

6mB

Tower arm middle section

12m

Tower boom top section 9m

LB65.5

1

1[3]

1[0]

1

1

1

0

1

1

LB68.5

1

0[2]

0[1]

2[1]

1

1

0

1

1

LB71.5

1

1[3]

0[1]

2[1]

1

1

0

1

1

*LB74.5

1

0[2]

1[0]

2

1

1

0

1

1

*LB77.5

1

1[3]

1[0]

2

1

1

0

1

1

*LB80.5

1

0[2]

0[1]

3[2]

1

1

0

1

1

**LB83.5

1

1[3]

1[0]

2

1

1

1

1

1

**LB86.5

1

0[2]

0[1]

3[2]

1

1

1

1

1

**LB89.5

1

1[3]

0[1]

3[2]

1

1

1

1

1

**LB92.5

1

0[2]

1[0]

3

1

1

1

1

1

**LB95.5

1

1[3]

1[0]

3

1

1

1

1

1

**LB98.5

1

0[2]

0[1]

3[2]

1

1

1

2

1

**LB101.5

1

1[3]

0[1]

3[2]

1

1

1

2

1

**LB104.5

1

0[2]

1[0]

3

1

1

1

2

1

 

B.Lightweight main boom section assembly with boom end pulley

 

Name and quantity

Lightweight main boom assembly

Main boom bottom section 10.5m

Main boom middle section3m

Main boom middle section

6m

Main boom middle section 12mA

Main boom transition section

7m

Tower arm middle section 6mA

Tower arm middle section 6mB

Tower arm middle section12m

Tower boom top section 9m

Tower arm single pulleyS

LBS65.5

1

1[3]

1[0]

1

1

1

0

1

1

1

LBS68.5

1

0[2]

0[1]

2[1]

1

1

0

1

1

1

LBS71.5

1

1[3]

0[1]

2[1]

1

1

0

1

1

1

*LBS74.5

1

0[2]

1[0]

2

1

1

0

1

1

1

*LBS77.5

1

1[3]

1[0]

2

1

1

0

1

1

1

*LBS80.5

1

0[2]

0[1]

3[2]

1

1

0

1

1

1

**LBS83.5

1

1[3]

1[0]

2

1

1

1

1

1

1

**LBS86.5

1

0[2]

0[1]

3[2]

1

1

1

1

1

1

**LBS89.5

1

1[3]

0[1]

3[2]

1

1

1

1

1

1

**LBS92.5

1

0[2]

1[0]

3

1

1

1

1

1

1

**LBS95.5

1

1[3]

1[0]

3

1

1

1

1

1

1

**LBS98.5

1

0[2]

0[1]

3[2]

1

1

1

2

1

1

**LBS101.5

1

1[3]

0[1]

3[2]

1

1

1

2

1

1

**LBS104.5

1

0[2]

1[0]

3

1

1

1

2

1

1

 

Notes: 1. “*” Lightweight boom combination requires 1.25m waist rope. “**” Lightweight boom combination requires 1.25m and 2.62m waist rope

2. Each boom section used needs to remove the tower boom and the main boom outer pull plate for fixing the auxiliary boom, and the main boom reducer needs to install the tower boom guide pulley.

3. 2 main boom intermediate sections 3m can be used to replace 1 main boom intermediate section 6m, or 2 main boom intermediate sections 3m and 1 main boom intermediate section 6m can be used to replace 1 main boom intermediate section 12mA. When replacing, you must pay attention to the matching of the number of pull plates and pins.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Distributor/Wholesaler,Exporter,Trading Company,Seller,Other

  • Year Established:

    2015

  • Total Annual:

    1000-5000

  • Ecer Certification:

    Active Member

Shandong Tengfei Hoisting Engineering Co., Ltd. is a Chinese company that sells second-hand crane equipment for self-use, with more than ten years of sales experience. All our crane equipment is from our own projects, the equipment is in good condition, there are no middlemen, and the price is bet... Shandong Tengfei Hoisting Engineering Co., Ltd. is a Chinese company that sells second-hand crane equipment for self-use, with more than ten years of sales experience. All our crane equipment is from our own projects, the equipment is in good condition, there are no middlemen, and the price is bet...

+ Read More

Get in touch with us

  • Reach Us
  • Shandong Tengfei Hoisting Engineering Co., Ltd.
  • Steel Market in Huantai County, Zibo City, Shandong Province, China
  • https://www.crawlers-crane.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement