| Payment Terms | L/C,T/T |
| Supply Ability | Supply According to Customer Needs |
| Delivery Time | According to Order Confirmation |
| Packaging Details | Packing According to Customer Requirements |
| Hoist Speed | 120m/min |
| Maximum Lifting Capacity | 300 tons |
| Max. Luffing Jib Length | 84m |
| Max. Boom Length | 96m |
| Boom Length | 91.4 m |
| Model | XGC300 |
| Fuel Tank Capacity | 1,500 liters |
| Counterweight | 100 tons |
| Crawler Length | 10.5 m |
| Max. Travel Speed | 1.5km/h |
| Brand Name | XCMG |
| Model Number | XGC 300t |
| Place of Origin | China |
View Detail Information
Explore similar products
Used XGC 300t Crawler Crane 300 Ton Lifting Capacity
Used XGC 300t Crawler Crane 300 Ton Capacity 96m Radius
XGC300 300t Crawler Crane 132m Max Lifting Height
XGC 300t Crawler Crane 300 Tons Lifting Capacity 100m Radius
Product Specification
| Payment Terms | L/C,T/T | Supply Ability | Supply According to Customer Needs |
| Delivery Time | According to Order Confirmation | Packaging Details | Packing According to Customer Requirements |
| Hoist Speed | 120m/min | Maximum Lifting Capacity | 300 tons |
| Max. Luffing Jib Length | 84m | Max. Boom Length | 96m |
| Boom Length | 91.4 m | Model | XGC300 |
| Fuel Tank Capacity | 1,500 liters | Counterweight | 100 tons |
| Crawler Length | 10.5 m | Max. Travel Speed | 1.5km/h |
| Brand Name | XCMG | Model Number | XGC 300t |
| Place of Origin | China | ||
| High Light | lightweight boom crawler crane ,300t hydraulic crawler crane | ||
Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m
Light main boom working condition
A.Lightweight main boom section assembly without arm end pulley
|
Name and quantity Lightweight main boom assembly |
Main boom bottom section 10.5m |
Main boom Intermediate section3m |
Main boom Intermediate section 6m |
Main boom Intermediate section 12mA |
Main boom transition section7m |
Tower arm middle section6mA |
Tower arm middle section 6mB |
Tower arm middle section 12m |
Tower boom top section 9m |
|
LB65.5 |
1 |
1[3] |
1[0] |
1 |
1 |
1 |
0 |
1 |
1 |
|
LB68.5 |
1 |
0[2] |
0[1] |
2[1] |
1 |
1 |
0 |
1 |
1 |
|
LB71.5 |
1 |
1[3] |
0[1] |
2[1] |
1 |
1 |
0 |
1 |
1 |
|
*LB74.5 |
1 |
0[2] |
1[0] |
2 |
1 |
1 |
0 |
1 |
1 |
|
*LB77.5 |
1 |
1[3] |
1[0] |
2 |
1 |
1 |
0 |
1 |
1 |
|
*LB80.5 |
1 |
0[2] |
0[1] |
3[2] |
1 |
1 |
0 |
1 |
1 |
|
**LB83.5 |
1 |
1[3] |
1[0] |
2 |
1 |
1 |
1 |
1 |
1 |
|
**LB86.5 |
1 |
0[2] |
0[1] |
3[2] |
1 |
1 |
1 |
1 |
1 |
|
**LB89.5 |
1 |
1[3] |
0[1] |
3[2] |
1 |
1 |
1 |
1 |
1 |
|
**LB92.5 |
1 |
0[2] |
1[0] |
3 |
1 |
1 |
1 |
1 |
1 |
|
**LB95.5 |
1 |
1[3] |
1[0] |
3 |
1 |
1 |
1 |
1 |
1 |
|
**LB98.5 |
1 |
0[2] |
0[1] |
3[2] |
1 |
1 |
1 |
2 |
1 |
|
**LB101.5 |
1 |
1[3] |
0[1] |
3[2] |
1 |
1 |
1 |
2 |
1 |
|
**LB104.5 |
1 |
0[2] |
1[0] |
3 |
1 |
1 |
1 |
2 |
1 |
B.Lightweight main boom section assembly with boom end pulley
|
Name and quantity Lightweight main boom assembly |
Main boom bottom section 10.5m |
Main boom middle section3m |
Main boom middle section 6m |
Main boom middle section 12mA |
Main boom transition section 7m |
Tower arm middle section 6mA |
Tower arm middle section 6mB |
Tower arm middle section12m |
Tower boom top section 9m |
Tower arm single pulleyS |
|
LBS65.5 |
1 |
1[3] |
1[0] |
1 |
1 |
1 |
0 |
1 |
1 |
1 |
|
LBS68.5 |
1 |
0[2] |
0[1] |
2[1] |
1 |
1 |
0 |
1 |
1 |
1 |
|
LBS71.5 |
1 |
1[3] |
0[1] |
2[1] |
1 |
1 |
0 |
1 |
1 |
1 |
|
*LBS74.5 |
1 |
0[2] |
1[0] |
2 |
1 |
1 |
0 |
1 |
1 |
1 |
|
*LBS77.5 |
1 |
1[3] |
1[0] |
2 |
1 |
1 |
0 |
1 |
1 |
1 |
|
*LBS80.5 |
1 |
0[2] |
0[1] |
3[2] |
1 |
1 |
0 |
1 |
1 |
1 |
|
**LBS83.5 |
1 |
1[3] |
1[0] |
2 |
1 |
1 |
1 |
1 |
1 |
1 |
|
**LBS86.5 |
1 |
0[2] |
0[1] |
3[2] |
1 |
1 |
1 |
1 |
1 |
1 |
|
**LBS89.5 |
1 |
1[3] |
0[1] |
3[2] |
1 |
1 |
1 |
1 |
1 |
1 |
|
**LBS92.5 |
1 |
0[2] |
1[0] |
3 |
1 |
1 |
1 |
1 |
1 |
1 |
|
**LBS95.5 |
1 |
1[3] |
1[0] |
3 |
1 |
1 |
1 |
1 |
1 |
1 |
|
**LBS98.5 |
1 |
0[2] |
0[1] |
3[2] |
1 |
1 |
1 |
2 |
1 |
1 |
|
**LBS101.5 |
1 |
1[3] |
0[1] |
3[2] |
1 |
1 |
1 |
2 |
1 |
1 |
|
**LBS104.5 |
1 |
0[2] |
1[0] |
3 |
1 |
1 |
1 |
2 |
1 |
1 |
Notes: 1. “*” Lightweight boom combination requires 1.25m waist rope. “**” Lightweight boom combination requires 1.25m and 2.62m waist rope
2. Each boom section used needs to remove the tower boom and the main boom outer pull plate for fixing the auxiliary boom, and the main boom reducer needs to install the tower boom guide pulley.
3. 2 main boom intermediate sections 3m can be used to replace 1 main boom intermediate section 6m, or 2 main boom intermediate sections 3m and 1 main boom intermediate section 6m can be used to replace 1 main boom intermediate section 12mA. When replacing, you must pay attention to the matching of the number of pull plates and pins.
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Trading Company,Seller,Other
Year Established:
2015
Total Annual:
1000-5000
Ecer Certification:
Active Member
Shandong Tengfei Hoisting Engineering Co., Ltd. is a Chinese company that sells second-hand crane equipment for self-use, with more than ten years of sales experience. All our crane equipment is from our own projects, the equipment is in good condition, there are no middlemen, and the price is bet... Shandong Tengfei Hoisting Engineering Co., Ltd. is a Chinese company that sells second-hand crane equipment for self-use, with more than ten years of sales experience. All our crane equipment is from our own projects, the equipment is in good condition, there are no middlemen, and the price is bet...
Get in touch with us
Leave a Message, we will call you back quickly!