China factories

Chat Now Send Email
China factory - FUJIAN BOBIG ELECTRIC MACHINERY CO.,LTD

FUJIAN BOBIG ELECTRIC MACHINERY CO.,LTD

  • China,Ningde ,Fujian
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China 520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Constructio
China 520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Constructio

  1. China 520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Constructio
  2. China 520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Constructio
  3. China 520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Constructio
  4. China 520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Constructio
  5. China 520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Constructio

520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Constructio

  1. MOQ:
  2. Price:
  3. Get Latest Price
Product Name Diesel Genertor, Generator 650KVA , Powered By SDEC Diesel Generator, Standby Use Power Diesel Generator 520kW
Delivery Time 30 working days
Controller Deepsea/Smartgen/etc
Application Indursty Bank Etc
Supply Ability 500pcs per month
Warranty 12 Months/1000 Hours
Alternator Marathon, Stamford, SLG/Stamford/Marathon/Meccatle/Leroy-somer, Stamford Or Newtec, Engga
Packaging Details Bubble wrap
Output Type AC Single/Three Phase
Rated Voltage 400/230V, 110-480V, 220V / 380V, 110V / 240V, 380V
Canopy Customized
Control Panel LCD Digital Display, Deepsea, ComAp, Deepsea / ComAp / Harsen / Smartgen 6110, Smartgen
Cooling Method Water-cooling System
Engine Original SDEC
Rated Power 520kW
Type Silent(super Silent)or Open, Silent, Etc, In-line/6-Cylinder/4-Stroke/4-Valve/19L, Soundproof Canopy(Silent)
Frequency 50/60HZ
Color Customers' Requirement
Model Number 6KTAA25-G39
Certification CE
Place of Origin China
Brand Name SDEC

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Product Name Diesel Genertor, Generator 650KVA , Powered By SDEC Diesel Generator, Standby Use Power Diesel Generator 520kW Delivery Time 30 working days
Controller Deepsea/Smartgen/etc Application Indursty Bank Etc
Supply Ability 500pcs per month Warranty 12 Months/1000 Hours
Alternator Marathon, Stamford, SLG/Stamford/Marathon/Meccatle/Leroy-somer, Stamford Or Newtec, Engga Packaging Details Bubble wrap
Output Type AC Single/Three Phase Rated Voltage 400/230V, 110-480V, 220V / 380V, 110V / 240V, 380V
Canopy Customized Control Panel LCD Digital Display, Deepsea, ComAp, Deepsea / ComAp / Harsen / Smartgen 6110, Smartgen
Cooling Method Water-cooling System Engine Original SDEC
Rated Power 520kW Type Silent(super Silent)or Open, Silent, Etc, In-line/6-Cylinder/4-Stroke/4-Valve/19L, Soundproof Canopy(Silent)
Frequency 50/60HZ Color Customers' Requirement
Model Number 6KTAA25-G39 Certification CE
Place of Origin China Brand Name SDEC
High Light 520kW SDEC silent diesel generator ,650KVA mining diesel generator set ,auto-start data center generator
520kW 650KVA SDEC Silent Diesel Generator Set
Our 520kW 650KVA BOBIG SDEC diesel generator (Model: 6KTAA25-G39) provides reliable power for mining, data centers, construction, and other demanding applications. Featuring auto-start capability and custom build options at factory pricing.
Power Performance Specifications
Specification Prime Power Standby Power
Rated Power (kVA) 650 715
Power Rating (kW) 520 572
Frequency (Hz) 50
Engine Model 6KTAA25-G39
Engine Speed (RPM) 1500
Phase 3
PF 0.8
Control System Digital
Rated Voltage (V) 400/230
Fuel Tank Capacity Operating Time ≥ 8h @ 75% load
Engine Specifications
Engine Model & Manufacturer 6KTAA25-G39 (SDEC)
Engine Type In-line, 4 strokes, water-cooled; 4 valves, Turbo charged with aftercooler
Combustion Type Direct injection
Cylinder Type Wet cylinder liner
Number of Cylinders 6
Bore × Stroke 170 × 185 mm
Displacement 25.2 lit.
Compression Ratio 16 : 1
Firing Order 1-5-3-6-2-4
Fuel Injection Advance Angle Electronic control
Dry Weight 2760 kg
Dimension 2348×1181×1659mm
Alternator Specifications
Alternator Brand BOBIG
Alternator Manufacturer FUJIAN BOBIG ELECTRIC MACHINERY CO.,LTD
Alternator Model BW-354F
Alternator Rated Power 520kw/650kva
Rated Voltage 230v/400v
Rated Frequency 50hz
Connecting Type 3 Phase and 4 W
Number of Bearing 1
Protection Grade IP23
Altitude ≤1000m
Exciter Type Brushless, Self-exciting, AVR automatic voltage regulating, 100% Copper
Insulation Class H class
Dimensions and Weight
Model BSD715 (Open type) BSD715S (Silent type)
Length (L) mm 3900 5400
Width (W) mm 1610 2000
Height (H) mm 2500 2500
Tank Capacity (L) 1196 1196
Key Features
  • Rated power of 520kW (650KVA) for various industrial applications
  • Powered by reliable 6KTAA25-G39 SDEC engine
  • Operates at standard 50Hz frequency
  • 1500 RPM engine speed for smooth power supply
  • Complies with ISO 8528-5:2018, GB/T2820.5-2009, and CE standards
  • Operates in ambient temperature range of +5°C to +40°C
  • Suitable for altitudes up to 1000m
  • Digital control system with standard DSE 6120 controller
Applications
  • Industrial Use: Backup power for factories and manufacturing facilities
  • Commercial Buildings: Office buildings, shopping malls, and hotels
  • Residential Areas: Reliable power for communities with unstable grids
  • Specialized Applications: Mining operations, data centers, construction sites
Customization & Services
We support complete customization and OEM services with design drawings. All units feature original power supplies with optional engine, generator, and controller configurations.
Standard equipped with DSE 6120 controller. Engine, generator, and controller options available.
Warranty & Support
BOBIG products include a one-year or 1000-hour warranty (whichever comes first) from ex-factory date. During warranty, we provide free replacement of easy-damageable spare parts caused by production or material quality issues.
Product Image
520kW 650KVA SDEC Diesel Generator Set

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2003

  • Total Annual:

    8000000-10000000

  • Employee Number:

    120~150

  • Ecer Certification:

    Verified Supplier

Our Catalogue:   BOBIG CATALOGUE 2024-1.pdf   BOBIG POWER Introduction: BOBIG POWER is a leading company in the production and supply of diesel generator sets. With a history spanning over 20 years, we have established ourselves as a trusted provider of reliable power s... Our Catalogue:   BOBIG CATALOGUE 2024-1.pdf   BOBIG POWER Introduction: BOBIG POWER is a leading company in the production and supply of diesel generator sets. With a history spanning over 20 years, we have established ourselves as a trusted provider of reliable power s...

+ Read More

Get in touch with us

  • Reach Us
  • FUJIAN BOBIG ELECTRIC MACHINERY CO.,LTD
  • NO.8 Jinye Road,Tiehu Village ,Chengyang Town,Fuan City,Ningde City,Fujian Province.CHINA
  • https://www.bobigpower.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement