| Connectiontype | Butt Weld or Threaded |
| Supply Ability | 10Ten/Month |
| Grade | 90/10 Copper Nickle (UNS 70600) |
| Pressurerating | Class 150 to Class 2500 |
| Technics | Casting |
| Delivery Time | 15-30 Workdays |
| Coppercontent | 70% Copper |
| Payment Terms | T/T, Western Union |
| Packing | Standard Packing |
| Material | Copper Nickel Alloy |
| Product Name | Copper Nickel Fittings |
| Compressive Strength | strong |
| Pressure | 300LBS |
| Packaging Details | Standard Shipping Package |
| Model Number | Copper Nickel Flange |
| Certification | ISQ/TUV/SGS |
| Brand Name | TOBO |
| Place of Origin | Shanghai, China |
View Detail Information
Explore similar products
UNS 70600 2" 3000# Copper Nickel Fittings Socket Weld 90 Degree Elbow
2"X 1" 3000# Sockolet Fitting UNS C70600 ASTM B151
1"X1/2" 2.5x2mm Copper Nickel Fittings UNS C70600 Pipe Reducing Coupling
3/4"X 1/2" 20 Bar UNS C70600 Socket Weld Reducing Tee
Product Specification
| Connectiontype | Butt Weld or Threaded | Supply Ability | 10Ten/Month |
| Grade | 90/10 Copper Nickle (UNS 70600) | Pressurerating | Class 150 to Class 2500 |
| Technics | Casting | Delivery Time | 15-30 Workdays |
| Coppercontent | 70% Copper | Payment Terms | T/T, Western Union |
| Packing | Standard Packing | Material | Copper Nickel Alloy |
| Product Name | Copper Nickel Fittings | Compressive Strength | strong |
| Pressure | 300LBS | Packaging Details | Standard Shipping Package |
| Model Number | Copper Nickel Flange | Certification | ISQ/TUV/SGS |
| Brand Name | TOBO | Place of Origin | Shanghai, China |
| High Light | CuNi 70/30 seamless pipe fittings ,ASME B16.9 forged fittings ,copper nickel pipe fittings | ||
Copper Nickel Fittings are manufactured from premium CuNi 70/30 (UNS C71500) raw material through hot forging or seamless forming process, featuring butt weld connection type. The products are manufactured in strict accordance with ASME B16.9 standard, covering a complete range of elbows, tees, reducers, end caps, stub ends and other pipe fittings. Due to their excellent seawater corrosion resistance and anti-biofouling properties, copper nickel alloy fittings are widely used in shipbuilding, seawater desalination, offshore oil platforms, chemical heat exchangers and other marine and industrial piping systems.
| Parameter | Specification |
|---|---|
| Material | CuNi 70/30 (UNS C71500) |
| Copper Content | 70% min |
| Nickel Content | 30% ± 1% |
| Iron Content | 0.4% - 1.0% |
| Manganese Content | 0.5% - 1.0% |
| Fitting Types | 45° Elbow, 90° Elbow, 180° Return Bend, Equal Tee, Reducing Tee, Concentric Reducer, Eccentric Reducer, End Cap, Stub End, Coupling |
| Connection Type | Butt Weld (BW) |
| Wall Thickness | SCH 5S, SCH 10S, SCH 20, SCH 40S, SCH 80S |
| Design Standard | ASME B16.9 |
| Manufacturing Process | Hot Forged / Seamless Forming |
| Size Range | 1/2" - 24" (DN15 - DN600) |
| Operating Temperature | -100°C to 300°C |
| Density | 8.94 g/cm³ |
| Tensile Strength | ≥ 310 MPa |
| Yield Strength | ≥ 105 MPa |
| Elongation | ≥ 30% |
| Hardness | ≤ 85 HRB |
| Fitting Type | 英文名称 | Size Range | Angles Available |
|---|---|---|---|
| 45°弯头 | 45° Elbow (LR/SR) | 1/2" - 24" | 45° |
| 90°弯头 | 90° Elbow (LR/SR) | 1/2" - 24" | 90° |
| 180°弯头 | 180° Return Bend | 1/2" - 24" | 180° |
| 等径三通 | Equal Tee | 1/2" - 24" | — |
| 异径三通 | Reducing Tee | 1/2" - 24" | — |
| 同心大小头 | Concentric Reducer | 1/2" - 24" | — |
| 偏心大小头 | Eccentric Reducer | 1/2" - 24" | — |
| 管帽 | End Cap | 1/2" - 24" | — |
| 翻边短节 | Stub End | 1/2" - 24" | — |
Marine seawater cooling pipeline systems
Offshore oil & gas platform firefighting and ballast water systems
Seawater desalination plant (MED/MSF process) piping connections
Coastal power plant condensers and heat exchangers
Chemical industry corrosive media transport pipelines
Offshore engineering subsea pipeline systems
Ship freshwater generator piping systems
Ship bilge and ballast piping systems
LNG terminal seawater vaporization systems
Marine aquaculture recirculating water systems
Excellent Seawater Corrosion Resistance: CuNi 70/30 alloy exhibits extremely low corrosion rates in both flowing and stagnant seawater, with a service life exceeding 20 years.
Superior Anti-Biofouling Performance: Copper element naturally inhibits marine microorganism adhesion, reducing pipeline blockage risks and maintenance frequency.
High Erosion-Corrosion Resistance: Material maintains good corrosion resistance under high-velocity seawater scouring, with maximum allowable flow velocity up to 3.5-4.0 m/s.
Forging & Seamless Process Assurance: Hot forging and seamless forming processes ensure uniform and dense grain structure, eliminating casting defects and significantly better mechanical properties.
Complete Range of Fittings: Full range of elbows, tees, reducers, end caps and stub ends available to meet all piping system configuration requirements.
Good Weldability: Compatible with CuNi 70/30 pipes for butt welding, enabling convenient on-site installation with reliable weld joint strength. TIG and MIG welding processes recommended.
Low Maintenance Cost: Self-healing passive film forms on material surface, eliminating the need for additional coatings or cathodic protection, with low lifecycle costs.
High Dimensional Accuracy: ASME B16.9 standard strictly controls tolerances to ensure perfect fit with standard CuNi pipes and flanges.
Change direction of seawater flow in piping systems (Elbows 45°/90°/180°)
Branch or combine seawater flow streams (Equal Tee / Reducing Tee)
Transition between different pipe diameters (Concentric / Eccentric Reducers)
Close and seal pipe ends (End Caps)
Facilitate flanged connections with backing flanges (Stub Ends)
Provide reliable butt weld connections that maintain full pipe system integrity
Withstand rated working pressure to ensure safe operation of piping systems
Adapt to long-term stable operation in marine humid and salt spray environments
Pre-Installation Preparation:
Inspect each fitting appearance, confirm no cracks, deformation, surface defects or other imperfections.
Verify fitting type, size, wall thickness, and material grade against design drawings and material specifications.
Clean fitting weld ends, removing oil, grease, oxide scale and other impurities.
Ensure proper fit-up alignment between fitting and pipe ends, with uniform root gap for butt welding.
Installation Steps:
Align fitting and pipe ends with proper root gap as per welding procedure specification.
Tack weld at minimum 4 points evenly distributed around circumference.
Use TIG (GTAW) welding process for root pass with ERCuNi filler metal.
Complete fill and cap passes using TIG or MIG (GMAW) with compatible CuNi filler metal.
Control interpass temperature not exceeding 150°C to avoid alloy element burn-off.
Ensure full penetration and proper reinforcement at weld joints.
Remove welding slag and spatter after each pass.
Post-Installation Inspection:
Conduct visual inspection of all welds for surface defects.
Perform penetrant testing (PT) or radiographic testing (RT) as per project requirements.
System hydrostatic test pressure shall be 1.5 times design pressure, hold for minimum 30 minutes without leakage or pressure drop.
Avoid Direct Contact with Carbon Steel: Copper-nickel alloy fittings in contact with carbon steel may cause galvanic corrosion. Must be stored and transported separately. Use wooden pallets or non-metallic separators.
Avoid Ammonia-Containing Media: Copper alloys are prone to stress corrosion cracking in ammonia environments. Strictly prohibited for ammonia or amine-containing systems.
Welding Shielding Gas Requirement: Pure argon or argon-helium mixture must be used as shielding gas during TIG welding to prevent weld oxidation and porosity. Ensure adequate back purging for root pass protection.
Avoid Excessive Seawater Flow Velocity: Although CuNi 70/30 has excellent erosion-corrosion resistance, continuous flow velocity is recommended not to exceed 3.5m/s, especially at elbows and tee branches where turbulence intensifies.
Avoid Dissimilar Metal Mixing in Same System: Piping systems should maintain material uniformity to avoid galvanic corrosion risks. If dissimilar metal connection is required, insulating joints or dielectric couplings must be installed.
No Post-Weld Heat Treatment Required: CuNi alloy generally does not require post-weld heat treatment. However, all welding spatter, slag and surface oxides must be thoroughly removed after welding.
Proper Storage Requirements: Store in dry and ventilated indoor warehouse area. Avoid outdoor exposure, rain and direct sunlight. Ambient humidity should be ≤ 60%. Keep away from carbon steel and other dissimilar metals.
Handle with Care: Copper nickel fittings are relatively soft compared to steel. Avoid dropping, dragging or impacting during handling to prevent surface damage and deformation.
Shipping Origin: Direct shipment from China factory
Delivery Time:
Standard sizes and types: 3-7 working days (ex-stock)
Custom sizes or non-standard types: 15-30 days (subject to quantity and specifications)
Shipping Methods:
Small orders / Samples: International Express (DHL, FedEx, UPS, TNT), 3-7 days delivery
Bulk orders: Sea freight FCL (Full Container Load) or LCL (Less than Container Load), 15-45 days delivery
Urgent orders: Air freight, 5-10 days delivery
Documents Provided:
Commercial Invoice
Packing List with detailed itemized contents
Certificate of Origin (CO)
Material Test Certificate (MTC per EN 10204 3.1 or 3.2)
Mill Test Reports including chemical composition and mechanical properties
Bill of Lading (B/L) or Air Waybill (AWB)
NDT reports (if required by purchase order)
Trade Terms: FOB, CIF, CFR, EXW available
Logistics Tracking: Tracking number provided immediately upon dispatch, full shipment traceability
Standard Payment Methods:
T/T (Telegraphic Transfer): 30% advance payment upon order confirmation, 70% balance payment before shipment
L/C at Sight: Irrevocable Letter of Credit at sight accepted (issued by reputable international bank)
Western Union: Applicable for sample orders and small amount payments
Credit Customers:
Long-term and repeat customers may apply for O/A (Open Account) credit terms, subject to credit review and approval
Monthly or quarterly settlement terms available for customers with established 1+ year cooperation history
Settlement Currency:
USD (US Dollar) - preferred
EUR (Euro)
CNY (Chinese Yuan)
Other currencies negotiable
Bank Information: Official company bank account details provided upon formal contract signing
Payment Notes:
Order becomes effective and production commences upon receipt of advance payment
Flexible installment payment plans negotiable for large volume orders
All payments must clearly reference Proforma Invoice number or Sales Contract number
Bank charges are to be borne by remitter (payer)
Standard Packaging Options:
Small fittings (≤2" NB): Individual polybag or bubble wrap protection + sturdy export-grade carton box
Medium fittings (2-1/2" - 8" NB): Individual bubble wrap / EPE foam wrap + plywood case or wooden crate
Large fittings (≥10" NB): Individual wrapping + palletized packing with fumigated wooden crate
Moisture & Corrosion Prevention Measures:
Anti-rust / anti-tarnish protective coating applied on all surfaces (easily removable before welding)
Silica gel desiccant packets placed inside sealed packaging
VCI (Vapor Corrosion Inhibitor) packaging materials used when specified
Vacuum-sealed aluminum foil packaging available upon request for long-term storage or tropical destinations
Marking & Labeling:
Each fitting permanently marked with: Material Grade, Size, Wall Thickness, Heat Number, Manufacturer Logo
Outer packaging clearly marked with: Product Description, Specification, Quantity, Net/Gross Weight, Dimensions
Standard international handling labels applied: Fragile, Keep Dry, This Side Up, Handle with Care
Custom Packaging Options:
Customer-specified shipping marks / logos on outer packaging
Custom labeling and barcoding for warehouse management
Split / partial shipment packaging arrangements
Consolidated packaging for mixed orders (fittings + flanges + pipes)
Packaging Cost:
Standard export packaging included in product quotation
Special / custom packaging requirements charged at actual cost
Vacuum packaging and VCI materials priced upon request
Purchase Process:
Customer sends inquiry with required fitting types, sizes, wall thickness, quantities and material specifications
Sales team provides detailed quotation including unit prices, total amount, delivery terms and estimated lead time
Both parties confirm all technical parameters, delivery schedule, payment terms and sign formal Sales Contract / Proforma Invoice
Customer arranges advance payment (30% T/T or as agreed)
Factory schedules production upon receipt of advance payment
Production completed, quality inspection and testing conducted internally
Customer inspection or third-party inspection arranged (optional, prior notice required)
Customer arranges balance payment
Shipment arranged upon receipt of full payment
Full set of original shipping and quality documents dispatched to customer
Return & Exchange Policy:
Quality-Related Returns:
If products are found with material non-conformance, manufacturing defects, or dimensional deviations exceeding standard tolerances, customer must notify in writing within 30 days of receipt of goods
Upon mutual confirmation and verification of the quality issue, supplier shall provide:
Free replacement of defective products, OR
Full refund of the affected product value
Supplier shall bear all round-trip freight costs for quality-related returns/replacements
Photos, test reports or inspection data required for claim processing
Non-Quality Returns:
Returns due to customer order errors (incorrect size, type or quantity ordered) accepted within 15 days of receipt
Products must be in original, unopened and undamaged packaging condition
Products must not have been welded, installed, modified or used
Customer bears all round-trip freight costs
Restocking fee of 15-20% may apply depending on product type
Non-Returnable Situations:
Products that have been welded, installed, heat-treated or modified in any way
Non-standard or custom-made sizes/types specifically manufactured for the order
Products damaged due to improper storage, handling, installation or usage by customer
Returns requested beyond the applicable return period (15 days non-quality, 30 days quality)
After-Sales Service:
Warranty: 12 months from date of shipment against manufacturing defects and material non-conformance under normal usage conditions
Technical Consultation: Professional technical support team available 24/7 via email, phone, WhatsApp, WeChat and other instant messaging platforms
On-Site Service: Experienced engineers available for on-site installation guidance, welding procedure support and troubleshooting for major projects (service fees and travel expenses negotiable)
Documentation Support:
EN 10204 3.1 Material Test Certificates (standard with every shipment)
EN 10204 3.2 Material Test Certificates (available upon request with third-party inspection)
NDT reports: Radiographic Testing (RT), Ultrasonic Testing (UT), Penetrant Testing (PT)
PMI (Positive Material Identification) reports
Third-party inspection reports from BV, SGS, TÜV, DNV, Lloyds etc.
Complaint Response Commitment:
Initial response to any complaint within 24 hours (working days)
Investigation report and proposed solution within 72 hours
Resolution implementation initiated within 5 working days of mutual agreement
Long-Term Support:
Repeat order discounts for established customers
Priority production scheduling for urgent requirements
Regular updates on new products and technical developments in copper-nickel alloys
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer
Total Annual:
>1000000
Employee Number:
>100
Ecer Certification:
Verified Supplier
TOBO INDUSTRIAL (SHANGHAI) Co., Ltd. is a professional supplier of pipeline products, located in Shanghai, with convenient transportation and beautiful environment. Dedicated to strict quality control and customer service. Our experienced staff can readily discuss your requirements to ensu... TOBO INDUSTRIAL (SHANGHAI) Co., Ltd. is a professional supplier of pipeline products, located in Shanghai, with convenient transportation and beautiful environment. Dedicated to strict quality control and customer service. Our experienced staff can readily discuss your requirements to ensu...
Get in touch with us
Leave a Message, we will call you back quickly!