China factories

Chat Now Send Email
China factory - HEFEI SHUYI DIGITAL POWER CO.,LTD

HEFEI SHUYI DIGITAL POWER CO.,LTD

  • China,Hefei
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China 24 Cabinet AI Ready Data Center Modular N+1 UPS In-Row Cooling 8400x3600x2000mm
China 24 Cabinet AI Ready Data Center Modular N+1 UPS In-Row Cooling 8400x3600x2000mm

  1. China 24 Cabinet AI Ready Data Center Modular N+1 UPS In-Row Cooling 8400x3600x2000mm

24 Cabinet AI Ready Data Center Modular N+1 UPS In-Row Cooling 8400x3600x2000mm

  1. MOQ: 1
  2. Price: To Be Negotiated
  3. Get Latest Price
IT Cabinets 24
Packaging Details Prefabricated modules, export packing
Cooling Capacity 40.9 kW x 4 (3+1 Redundancy)
Redundancy UPS N+1 / Cooling 3+1
Configuration Prefabricated AI Ready Modular Data Center
Deployment Prefabricated, Rapid Deployment within Days
Supply Ability 10 sets per month
Dimensions (L*W*H) 8400 x 3600 x 2000 mm
Customization ODM / OEM
Payment Terms D/A
Refrigeration Type In-Row AC
Delivery Time 5-10 Weeks
Aisle Containment Cold / Hot Aisle Containment
Application AI Training, HPC, Edge Computing
Power per Cabinet 5 kW
UPS System Modular N+1 (25kVA modules, 5+1)
Certification CE, ISO, UL
Brand Name Soeteck
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

IT Cabinets 24 Packaging Details Prefabricated modules, export packing
Cooling Capacity 40.9 kW x 4 (3+1 Redundancy) Redundancy UPS N+1 / Cooling 3+1
Configuration Prefabricated AI Ready Modular Data Center Deployment Prefabricated, Rapid Deployment within Days
Supply Ability 10 sets per month Dimensions (L*W*H) 8400 x 3600 x 2000 mm
Customization ODM / OEM Payment Terms D/A
Refrigeration Type In-Row AC Delivery Time 5-10 Weeks
Aisle Containment Cold / Hot Aisle Containment Application AI Training, HPC, Edge Computing
Power per Cabinet 5 kW UPS System Modular N+1 (25kVA modules, 5+1)
Certification CE, ISO, UL Brand Name Soeteck
Place of Origin China
High Light AI Ready Data Center UPS ,Modular N+1 UPS system ,In-Row Cooling Data Center

AI training clusters and high-performance computing (HPC) workloads push rack densities far beyond what conventional room cooling was ever designed for. The 24-Cabinet AI-Ready Modular Data Center answers that challenge as a single prefabricated, rapidly deployable module: twenty-four 42U cabinets housed in one 8400 x 3600 x 2000 mm enclosure, factory-integrated with power, cooling and containment so the hall can be commissioned within days rather than months.

Inside, a Modular N+1 UPS built from 25kVA hot-swappable modules (5+1) feeds the IT load, while four in-row air conditioners deliver 40.9 kW each on a 3+1 redundant scheme. Cold and hot aisle containment, overhead busway and pre-installed cable management keep every rack ready for GPU-class hardware, and the modular building-block design lets you add further modules as compute demand grows, making it a dependable foundation for large language model training and high-density computing.


Product Family

Configuration IT Cabinets Power / Cab UPS System Cooling Capacity Refrigeration Type Dimensions (L*W*H)
Plan 1 › 12 Cabinets 5 kW 90K Rack Modular
(15kVA modules, 4+1)
25.5kW x 4
(3+1 Redundancy)
In-Row AC 4800 x 3600 x 2000 mm
Plan 2 › 12 Cabinets 5 kW 120K Tower Modular
(30kVA modules, 3+1)
65.5kW x 2
(1+1 Redundant)
In-Row AC 4800 x 3600 x 2000 mm
Plan 3 › 14 Cabinets 5 kW 120K Tower Modular
(30kVA modules, 3+1)
71.1kW x 1
(N Redundancy)
Room-Level AC 4800 x 3600 x 2000 mm
Plan 4 › 14 Cabinets 5 kW 120K Tower Modular
(30kVA modules, 3+1)
Custom Capacity
(Tailored)
FAN WALL 4800 x 3600 x 2000 mm
Plan 5 › 18 Cabinets 5 kW Modular N+1
(25kVA modules, 4+1)
31.1kW x 4
(3+1 Redundancy)
In-Row AC 6000 x 3600 x 2000 mm
Plan 6 › 24 Cabinets 5 kW Modular N+1
(25kVA modules, 5+1)
40.9kW x 4
(3+1 Redundancy)
In-Row AC 8400 x 3600 x 2000 mm
Custom › ≤ 48 Cabinets ≤ 15 kW Max 500kVA
(2N/N+1 Redundancy)
Flexible Capacity
(Row or Room)
Air / Water / Chilled Length ≤ 15000 mm

Product Features

AI Ready Data Center Cold Aisle Containment

24-Cabinet AI-Ready High-Density Infrastructure

Powering Next-Gen Compute: A single module houses 24 x 42U cabinets on a reinforced frame rated for fully loaded GPU servers, with overhead busway, pre-installed cable management and space reserved for liquid-cooling manifolds, so the hall accepts the latest accelerator platforms the day it lands.
Seamless Scalability: Start with one module and add further modules as compute demand grows. Standardized power and cooling interfaces keep every expansion a matter of weeks rather than a facility rebuild, letting air-cooled storage and high-density compute share the same footprint.


Modular N+1 Power & In-Row Cooling

Modular N+1 Power: The integrated UPS is built from 25kVA hot-swappable power modules in a 5+1 configuration, so a single module can be replaced on load without dropping the IT bus, protection that matches the step-load behaviour of AI training workloads.
In-Row Cooling: Four in-row air conditioners deliver 40.9 kW each on a 3+1 redundant scheme, removing heat close to its source and holding a stable supply-air temperature even as rack density climbs.

CDUs AI Ready Data Center Cold Aisle Containment System

AI Ready Data Center Cold Aisle Containment


Focus on the core cooling demands of high-density data center deployments, where our full range of premium products leverages advanced technological advantages to reliably safeguard continuous, efficient, and stable operation.

5-30 kW per Cabinet

Cold Aisle Data Center

Airtight cold aisle enclosure, 90%+ cold air utilization rate, PUE ≤ 1.2, fast deployment and flexible expansion for medium-density IT loads.

10-80 kW Total Power

20ft Container DC

Prefabricated all-in-one design, anti-vibration & dust-proof, plug-and-play, ideal for edge computing and temporary computing demand scenarios.

30-100 kW per Cabinet

40ft Cold Plate Container DC

Hybrid air-liquid cooling, direct heat dissipation from GPU/CPU, AI-ready design, high power density with low energy consumption.

50-200 kW per Cabinet

40ft Immersion Container DC

Immersion cooling with dielectric fluid, 100x higher heat dissipation efficiency than air cooling, PUE ≤ 1.1, perfect for ultra-high density AI clusters.

APPLICATIONS


Empowering next-generation infrastructure with superior thermal management for high-wattage computing demands.

AI Training and HPC Clusters
AI Training & HPC Clusters
High-Density Data Centers
High-Density Data Centers
Modular & Container Solutions
Modular & Container Solutions
Blockchain & Crypto Mining
Blockchain & Crypto Mining

FAQ


1. What defines a data center as "AI-Ready"?
An AI-Ready data center is engineered for extreme power density and thermal management. It features reinforced floor loading for heavy GPU clusters, high-voltage power distribution (such as 415V or 480V) to the rack, and a flexible cooling architecture capable of supporting 40kW to 100kW+ per cabinet.
2. How does the infrastructure support high-performance networking (RDMA)?
Our AI-Ready modules are designed with specialized overhead cable management systems to handle the high-density fiber counts required for InfiniBand and RoCE networks. We ensure optimized cable path lengths to minimize latency and maintain the strict bend radii necessary for 400G and 800G optical interconnects.
3. Can your AI-Ready racks support liquid cooling for NVIDIA Blackwell or H100 systems?
Yes. Our racks are pre-configured for liquid-to-chip cooling. They feature integrated manifolds and space for Coolant Distribution Units (CDUs), making them fully compatible with the high thermal design power (TDP) requirements of the latest NVIDIA Blackwell and Hopper architectures.
4. How do you handle the massive power surges associated with AI training loads?
AI workloads create highly variable power demands. Our solutions utilize intelligent PDUs and UPS systems with high-discharge batteries or flywheels that can handle rapid "step-loads," ensuring electrical stability even when thousands of GPUs ramp up to full power simultaneously.
5. Are these modules scalable for rapid "Day 2" expansions?
Absolutely. We use a modular "building block" design. You can start with a few high-density AI pods and add more as your compute needs grow. The cooling and power hookups are standardized for rapid deployment, reducing the "Ready-for-Service" time by up to 30% compared to traditional builds.
6. What is the maximum rack weight capacity for fully loaded AI servers?
Our AI-specific cabinets are built with heavy-gauge reinforced steel, supporting a static load rating of up to 2,200kg (approx. 4,850 lbs). This safely accommodates full-stack AI configurations, including internal bus bars, liquid manifolds, and multi-node GPU systems.
7. How does AI-readiness impact the sustainability (PUE) of the facility?
AI-Ready centers actually improve efficiency by moving cooling closer to the heat source. By utilizing Rear Door Heat Exchangers (RDHx) or Direct Liquid Cooling (DLC), we can remove heat more efficiently than traditional air-only methods, targeting a PUE of 1.12 or lower even at 100kW per rack densities.
8. What is the standard configuration of the 24-cabinet AI-ready module?
The reference configuration houses 24 x 42U cabinets at 5 kW each inside an 8400 x 3600 x 2000 mm enclosure, fed by a Modular N+1 UPS built from 25kVA modules (5+1) and cooled by four in-row air conditioners rated 40.9 kW each on a 3+1 redundant scheme. Aisle width, height and length can be tailored to the room, and the same platform scales from a 12-cabinet module up to 48 racks or more.
9. How is the module shipped and how long does deployment take?
Because power, cooling, containment and monitoring are factory-integrated, a module normally ships in 5 to 10 weeks and is commissioned on site within days of arrival. Modules are delivered as export-packed prefabricated sections rather than standard ISO containers, which allows the larger 8400 mm footprint to be assembled quickly at the project site.

Have more questions about our AI Ready Data Center Solutions?

Contact Us Now

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2016

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

SOETECK, also known as SHUYI in Chinese, is a professional manufacturer of critical infrastructure solutions in China, specializing in critical power and precision cooling systems for data centers and Telecom. We excel in designing and supplying integrated data center solutions, covering ... SOETECK, also known as SHUYI in Chinese, is a professional manufacturer of critical infrastructure solutions in China, specializing in critical power and precision cooling systems for data centers and Telecom. We excel in designing and supplying integrated data center solutions, covering ...

+ Read More

Get in touch with us

  • Reach Us
  • HEFEI SHUYI DIGITAL POWER CO.,LTD
  • Floor 21, Building 8, China Sound Valley, No. 3333, Xiyou Road, Hefei, China
  • https://www.datacenteridc.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement