China factories

Chat Now Send Email
China factory - Jinzhou City Shitan Machinery Equipment  CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

  • China,Jinzhou ,Hebei
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Truck Mounted 400m Deep Borehole Water Well Drilling Rig Machine
China Truck Mounted 400m Deep Borehole Water Well Drilling Rig Machine

  1. China Truck Mounted 400m Deep Borehole Water Well Drilling Rig Machine
  2. China Truck Mounted 400m Deep Borehole Water Well Drilling Rig Machine

Truck Mounted 400m Deep Borehole Water Well Drilling Rig Machine

  1. MOQ: 1 set
  2. Price: Workable
  3. Get Latest Price
Payment Terms T/T, Western Union
Supply Ability 2000 sets per year
Delivery Time 10-15 days
Packaging Details customized packed or normal packing
Drilling Rig Name ST 350 Drilling Machine 92 kw Diesel Engine Pneumatic Borewell Machine
Hole Diameters 105-350mm
Place Of Origin China (Mainland)
Model Numbe(m) ST-350
Drilling Depths 350 meters
Color Yellow,Red
OEM Customized
Crawler Steel Crawler
Truck Mounted Optional
Tech Support Video Support
Brand Name ShiTan
Model Number ST-350
Certification ISO
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union Supply Ability 2000 sets per year
Delivery Time 10-15 days Packaging Details customized packed or normal packing
Drilling Rig Name ST 350 Drilling Machine 92 kw Diesel Engine Pneumatic Borewell Machine Hole Diameters 105-350mm
Place Of Origin China (Mainland) Model Numbe(m) ST-350
Drilling Depths 350 meters Color Yellow,Red
OEM Customized Crawler Steel Crawler
Truck Mounted Optional Tech Support Video Support
Brand Name ShiTan Model Number ST-350
Certification ISO Place of Origin China
High Light pneumatic borehole water well drilling rig machine400m borehole water well drilling rig machine400m deep pneumatic borewell machine

400m Truck Mounted Deep Borehole Water Well Drilling Rig Machine

 

 

ST 350 Pneumatic Borewell Machine Descrption

 

The machine can do both air drilling (with air compressor) and water drilling (with mud pump).
The mutifunctional drill rig of geothemal well is an improved device. Equipped with the good brand diesel engine, the drill rig meets national standards for emissions and environment. Meanwhile, the hydraulic system, supporting configuration and appearance, etc. have been optimized, thus improving the performance and working efficiency. The double rotation motor increased the rotaty torque and revolving speed.

 

ST 350 Pneumatic Borewell Machine Technical Information

 

Drilling Rig Model
ST 350 Pneumatic Drilling Rig Machine
Drilling depth
350m
Dia.hole
φ140 - 325mm
Advance Length one time
6.6m
Working pressure
1.7-3.3MPa
Air consumption
17-35m³/min
Length of rod
1.5m,2m,3m, 6m
Dia. Of rod
φ89,φ102,φ114
Lifting power
24T
Rotation torque
6200-85000N.m
Rotation Speed
55-115r/min
Diesel Engine
Yuchai
Engine Power
92Kw/2200rpm
Travelling speed
0-2.5 Km/h
Climb capacity
30°
Weight
9000kgs
Dimension
5900x2000x2850mm
Application
Complicated geological conditions: Rock, Mud, Sand etc.
 
Core drilling skills
 
Core drilling rig is widely used in geological survey and geophysical exploration; Road and bridge construction survey; Structural quality inspection of geotechnical blasting holes, grouting holes and concrete works, drilling construction of agricultural water wells, etc. The core drilling rig is mainly composed of power, reducer, water pump, clutch and gearbox, vertical shaft box, winch and drilling tower. The most important thing to operate the core drill is experience and skills. During the construction process, when the drill pipe bit is lowered into the hole, the operation control is completely judged by the experience of the manipulator. How to cut the drilling tools of the core drill during construction is invisible, but the stress of the drilling tools in the hole will be fed back to the equipment outside the hole. For example: load and vibration, so the operator can judge the situation in the hole by observing the changes of equipment outside the hole, so as to change the operation control. The two most commonly used methods for operating core drilling rig are listening to the sound and watching the drilling rate

 

Pre drilling inspection


1. Check whether the oil level, coolant and hydraulic oil of the drilling rig are sufficient.
2. Check whether the connecting screws of each part of the drilling machine are fastened.
3. The oil mist shall be added in time according to the use condition (it is forbidden to use the secondary polluted oil).
4. Check whether the left and right chains work hard at the same time and adjust them consistently

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    8000000-15000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...

+ Read More

Get in touch with us

  • Reach Us
  • Jinzhou City Shitan Machinery Equipment CO. LTD.
  • Xiaoshang Village,Jinzhou City,Hebei province,China
  • https://www.drillingrigmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement