Payment Terms | T/T, Western Union |
Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days |
Packaging Details | Standard Export Package |
Product Name | Geological Drilling Rig Prospecting 300mm Diameter GK 200 Hydraulic Borewell Machine |
Condition | New |
Type | Hydraulic Drilling Rig |
Power Type | Diesel |
Usage | Water Well,geological exploration |
Voltage | 380V |
Power(W) | 16.2kw |
Dimension(L*W*H) | 1730*860*1360mm |
Weight | 585kg |
Drilling Depth | 300m |
Drilling Diameter | 75-200mm |
Engine | Diesel Power |
Brand Name | JINZHOU SHITAN |
Model Number | GK 200 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
150 Meters Depth 380v Hydraulic Borewell Machine Diesel Engine Xy-1a
Borehole 100m Mobile Xy 1a Core Drilling Rig Machine
Hard Rock 600m XY-2B Hydraulic Core Drilling Rig
Red XY - 100 Soil Test Drilling Machine Full Hydraulic Water Well Drilling Rig
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days | Packaging Details | Standard Export Package |
Product Name | Geological Drilling Rig Prospecting 300mm Diameter GK 200 Hydraulic Borewell Machine | Condition | New |
Type | Hydraulic Drilling Rig | Power Type | Diesel |
Usage | Water Well,geological exploration | Voltage | 380V |
Power(W) | 16.2kw | Dimension(L*W*H) | 1730*860*1360mm |
Weight | 585kg | Drilling Depth | 300m |
Drilling Diameter | 75-200mm | Engine | Diesel Power |
Brand Name | JINZHOU SHITAN | Model Number | GK 200 |
Certification | ISO9001 | Place of Origin | China |
High Light | geological drilling bore well machine ,prospecting bore well machine ,300mm diameter hydraulic borewell machine |
Geological Drilling Rig Prospecting 300mm Diameter GK 200 Hydraulic Borewell Machine
GK 200 Geological Drilling Rig Introduction:
GK-200 Drilling Rig is a light multifunctional engineering project prospecting drilling rig
With the hydraulic feeding mechanism,improve the drilling efficiency,reducing the labor intensity of workers.
The rig is equipped with a ball on a cassette holding mechanism and a six side rod, the rod can be replaced without shutdown, high work efficiency, safe and reliableFurnished with hole bottom pressure gauge pressure indicator,and easy to master the status inside the hole
The handle centered, convenient operation.
GK 200 Geological Drilling Rig Technical Information:
Drilling depth | 60 225 295m |
Drilling diameter | 300 76 46mm |
Drill pipe diameter | 50 42mm |
Spindle Turnable Angle | 0-360degree |
Net weight(excluding the power machine) | 670kg |
Dimension(length*width*height) | 1820*980*1400mm |
Revolving Plate | |
Spindle speed | 900 475 388 205 157 68 r/min |
Maximum torque | 2000N*m |
Driving travel | 400mm |
Maximum Cylinder driving force | 2,9000N |
Maximum Cylinder lifting force | 3,9000N |
Lifter | |
Lifting capacity | 3,0000N |
Bobbin line speed (2 layers) | 0.27 0.64 0.83 1.58 1.64 m/s |
Bobbin diameter | 135mm |
GK 200 Geological Drilling Rig Advantage:
Wide range if P.R.M and well-set gears
Great torque in low P.R.M, fit for coring drilling and piling hole works.
Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.
Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.
Optimized structure, small volume, and lightweight.
1. The drill pipes/casing pipe will be packed into bundles as 3x3, 3x4, 4x4 etc, and loading into containers after black painting and thread protectors installation.
2. For 20’ container, the max loading weight is 21 metric tons
3. For 40’ container, the max loading weight is 27 metric tons.
4. Usual loading port is XINGANG port in Tianjin, main port in north of China.
The specific steps of soil sampling method are as follows
1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.
2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!