Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Your message must
be between 20-3,000 characters!
Submit Requirement
Thank You!
Your requirement has been sent. we will contact you quickly!
{"title":"Compact Tractor Water Well Drilling Rig With Strong Power","imgUrl":"https:\/\/img.chinax.com\/nimg\/8b\/c6\/0212dedff5eaf5dfcc26eb71f2c2-200x200-1\/compact_tractor_water_well_drilling_rig_with_strong_power.jpg","attrs":{"Brand Name":"Shitan","Model Number":"Tractor self-propelled well drilling machine","Place of Origin":"Jinzhou ,Hebei Province","Minimum Order Quantity":"1 SET"}}
{"title":"Small Water Well Drill Rig Equipment Drilling Depth ST200","imgUrl":"https:\/\/img.chinax.com\/nimg\/0f\/47\/955a6578417f836b33d4afa79ad7-200x200-1\/small_water_well_drill_rig_equipment_drilling_depth_st200.jpg","attrs":{"Brand Name":"Shitan","Model Number":"ST200","Certification":"ISO9001","Place of Origin":"Hebei . China"}}
{"title":"Electric 150mm 150 Meter Water Well Drilling Rig Machine","imgUrl":"https:\/\/img.chinax.com\/nimg\/64\/a8\/78df3f6ed66094f3ac2d2b05be57-200x200-1\/electric_150mm_150_meter_water_well_drilling_rig_machine.jpg","attrs":{"Brand Name":"Shitan","Model Number":"XY-1A","Certification":"ISO","Place of Origin":"China"}}
{"title":"Diesel Power Water Well Drilling Rig For Engineering Exploration Two Hundred","imgUrl":"https:\/\/img.chinax.com\/nimg\/cf\/75\/b8ccff7f227201dfa372fa302fdd-200x200-1\/diesel_power_water_well_drilling_rig_for_engineering_exploration_two_hundred_depth_gk_200.jpg","attrs":{"Brand Name":"Shitan","Model Number":"GK-200","Place of Origin":"China","Minimum Order Quantity":"1 set"}}
{"title":"Trailer Mounted 22HP 160m Water Well Drilling Rig Machine","imgUrl":"https:\/\/img.chinax.com\/nimg\/9e\/cf\/40bcb937da22fb5849df3e368ea2-200x200-1\/trailer_mounted_22hp_160m_water_well_drilling_rig_machine.jpg","attrs":{"Brand Name":"Shitan","Model Number":"ST-200","Certification":"ISO9001","Place of Origin":"China"}}
{"title":"High Drilling Efficiency 75mm Core Geotechincal Water Well Drilling Rig Machine","imgUrl":"https:\/\/img.chinax.com\/nimg\/f6\/1e\/d0374854f7a757b4dec6c924717b-200x200-1\/high_drilling_efficiency_75mm_core_geotechincal_water_well_drilling_rig_machine_with_200_meters_depth.jpg","attrs":{"Brand Name":"ShiTan","Model Number":"GK200","Certification":"ISO9001","Place of Origin":"China"}}
{"title":"Diesel Engine Power Earth Drilling Equipment Geological Drilling","imgUrl":"https:\/\/img.chinax.com\/nimg\/f4\/3f\/35df8ec282502add0a4bf8275466-200x200-1\/diesel_engine_power_earth_drilling_equipment_geological_drilling.jpg","attrs":{"Brand Name":"SHITAN","Model Number":"ST-100","Certification":"ISO","Place of Origin":"China"}}
Brief Overview of Traction Water Well Drilling Machine
The drilling rig adopts a traction design, with a moving speed of 2.5 kilometers per hour and strong adaptability to the site. The equipment weighs only 2.8 tons and has an overall size of 4000 × 1600 × 2680 millimeters. The structure is compact and easy to transport and install. Its maximum clamping angle can reach 30 °, and it is firmly fixed during operation. It has the characteristics of high efficiency, easy operation, durability and reliability, and is a practical choice for engineering level water well drilling operations.
Technical Specifications
Parameter
Value
Drilling Depth
100 Meters
Weight
2.8T
Rod Hole Diameter
60mm
Drilling Diameter
150 - 500mm
Power Source
Electricity, Diesel
Movement Speed
2.5Km/h
Overall Size
4000*1600*2680
Tractor Power
36 HP
Torque
260 N.m
Electric Motor
11W
Clamping Capacity
30° MAX
Generator
30 kw
1, Precautions for preparation before operation Equipment inspection: Conduct a comprehensive inspection of the status of all components of the drilling rig before operation, with a focus on checking the oil (engine oil, diesel), circuit connections, and oil pipe sealing of the engine, electric motor, and generator to ensure no leakage or looseness; Check the flexibility of the clamping device's opening and closing, confirm that the maximum 30 ° clamping angle adjustment function is normal, and that the drill bit and drill rod are not worn or deformed. Site adaptation: Choose a solid and flat work site, avoid construction on soft and sloping (slopes exceeding the equipment adaptation range) ground, and prevent the machine from tipping over; Clear the obstacles within the site, reserve sufficient operating space, and ensure unobstructed towing and drilling operations. Personnel qualifications: Operators must undergo professional training, be familiar with equipment structure, operating procedures, and safety regulations, and are strictly prohibited from working without certification; Wear protective equipment (safety helmet, anti slip shoes, protective gloves, etc.) during homework to avoid physical contact with moving parts. Power debugging: Before starting the equipment, confirm that the power matching of the tractor, electric motor, and generator is normal. Run it for 5-10 minutes without load, check whether the speed and torque output are stable, and monitor the equipment for any abnormal noise. 2, Precautions for homework process Parameter compliance operation: Strictly follow the rated parameters of the equipment for construction, with a drilling diameter not exceeding 500 millimeters and a drilling depth not exceeding 150 meters, to avoid component damage caused by overloaded operations; Reasonably adjust the drilling speed according to the geological conditions (soil and rock hardness), and prohibit violent drilling. Clamping and fixing specifications: During the installation of the drill pipe, ensure that the clamping device is clamped and the clamping angle is controlled within 30 °. During operation, observe the clamping status in real time and immediately stop the machine for adjustment if any looseness is found to prevent the drill pipe from falling off and causing safety accidents. Real time monitoring status: Continuously monitor the operating temperature (engine, motor), oil pressure, and circuit stability of the equipment during operation. If there are any abnormalities such as overheating, abnormal noise, or leakage, immediately stop the machine to troubleshoot. It is strictly prohibited to work with problems. Safety distance control: During drilling operations, non operators should stay away from the equipment rotation area and below the drill pipe, and set up safety warning signs to avoid accidental injuries caused by gravel splashing and drill pipe shaking. 3, Mobile and transportation precautions Traction and movement specifications: Ensure that the traction device is firmly connected during traction, strictly control the movement speed within 2.5 kilometers per hour, and avoid sudden acceleration and braking; Slow down on turning and downhill sections, and arrange personnel to assist and guide if necessary. Size adaptation reminder: The overall size of the equipment is 4000 × 1600 × 2680 millimeters. Before transportation, confirm the width, height, and load-bearing capacity of the roads, bridges, and tunnels (equipment weight 2.8 tons) to avoid transportation accidents caused by excessive height, width, or weight. Loading and unloading protection: During the loading and unloading process, use suitable lifting equipment to ensure even force distribution and avoid tilting or collision of the aircraft; Secure detachable components such as drill rods and bits during transportation to prevent damage caused by rough terrain. 4, Maintenance and storage precautions Daily maintenance: Clean the surface soil and debris of the equipment in a timely manner after homework, check the wear and tear of drill rods and bits, and polish or replace them if necessary; Regularly replace the oil and filter element, tighten loose parts, and keep maintenance records. Long term storage: Store in a dry and ventilated area, avoiding exposure to rain and sun; Disassemble the drill rod and drill bit, store them properly, and apply rust proof oil; Turn off the power supply and oil valves of the equipment to ensure safety during storage. Fault handling: In case of equipment failure, it is necessary to cut off power and oil before conducting maintenance. It is strictly prohibited to disassemble components while the equipment is in operation; Complex faults require contacting professional maintenance personnel for handling, and unauthorized modification of equipment core components is not allowed.
Product Images
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and
processing company for core drilling rigs, crawler drilling rigs, various track chassis, various
types of mud pumps, various track transport vehicles, etc. It is one of the outstanding
manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and
processing company for core drilling rigs, crawler drilling rigs, various track chassis, various
types of mud pumps, various track transport vehicles, etc. It is one of the outstanding
manufacturers of si...