| Payment Terms | T/T,Western Union |
| Supply Ability | 2000 sets/month |
| Delivery Time | 15-20 days |
| Packaging Details | Wooden box |
| Product Name | 200 type tire type water well drilling rig |
| Drilling method | Mud pump drilling and air compressor drilling |
| Drilling diameter | Φ105-Φ350mm |
| Max Rotary Speed | 30-120 r/min |
| Rod Diameter | 76-89mm |
| Drilling depth | 200m |
| Weight | 5.5T |
| Diesel engine power | Xidong 65 kW |
| Dimension | 4400x2150x2200mm |
| Working Condition | Loose layer and bedrock |
| Brand Name | Shitan |
| Model Number | ST-200 |
| Place of Origin | Hebei China |
View Detail Information
Explore similar products
High Speed Small Trailer Mounted Water Well Drilling Rig With 110 Meters Depth
BW160 200 Meter Rubber Trailer Mounted Drilling Rigs
Deep Underground 105-180mm Trailer Mounted Drill Rig For Farming ST 180
Shallow Water Borehole Trailer Mounted Drilling Rigs 150 Meters XY-1A
Product Specification
| Payment Terms | T/T,Western Union | Supply Ability | 2000 sets/month |
| Delivery Time | 15-20 days | Packaging Details | Wooden box |
| Product Name | 200 type tire type water well drilling rig | Drilling method | Mud pump drilling and air compressor drilling |
| Drilling diameter | Φ105-Φ350mm | Max Rotary Speed | 30-120 r/min |
| Rod Diameter | 76-89mm | Drilling depth | 200m |
| Weight | 5.5T | Diesel engine power | Xidong 65 kW |
| Dimension | 4400x2150x2200mm | Working Condition | Loose layer and bedrock |
| Brand Name | Shitan | Model Number | ST-200 |
| Place of Origin | Hebei China | ||
| High Light | High precision trailer mounted drilling rig ,200 type high power drilling rig ,Trailer mounted high power drill | ||
The 200 type water well drilling rig is a practical equipment suitable for medium and shallow hole drilling, with a drilling depth of about 200 meters, strong power, and stable drilling efficiency. The device has a compact structure, easy operation, and is compatible with various geological conditions such as soil, sand, and soft rock. It is suitable for rural drinking water, farmland irrigation, temporary water intake on construction sites, and emergency water supply scenarios. Some models are equipped with tire chassis, which is flexible and easy to transfer, without the need for complex installation. It is a cost-effective choice for small and medium-sized water well construction in towns, mountainous areas, and wilderness areas
| Parameter | Value |
|---|---|
| Model | Shitan ST 200 |
| Max Drilling Depth | 200m |
| Drilling Diameter | 105-350mm |
| Air Pressure | 1.2-3.5 Mpa |
| Rod Length | 3m |
| Rod Diameter | 76-89mm |
| Main Shaft Pressure | 4T |
| Lifting Force | 18T |
| Power Head Stroke | 40m |
| Max Rotary Torque | 5900 Nm |
| Max Rotary Speed | 30-120 r/min |
| Secondary Winch Lifting Force | 1T |
| Jacks Stroke | 1.35m |
| Moving Speed | 2.5 km/h |
| Uphill Angle | 21° |
| Weight | 5.5T |
| Engine | Xidong 65kw(Powerful) |
| Overall Dimensions | 4400*2150*2200mm |
| Working Condition | Loose layer and bedrock |
Daily maintenance precautions
Check key components before and after homework, including drill rods, drill bits, hydraulic systems, and braking devices, and replace worn or loose parts in a timely manner.
Keep the equipment clean, remove soil and drilling debris from the drilling tools, and prevent impurities from entering the transmission and hydraulic systems.
Regularly add lubricating oil to moving parts such as gears, bearings, and chains, and select the appropriate model according to the instructions to prevent dry wear and damage.
Long term maintenance precautions
After the homework is completed, park the equipment in a dry and ventilated place, and take measures to prevent rain, moisture, and dust to prevent metal parts from rusting.
When idle for a long time, it is necessary to empty the hydraulic oil, fuel, and coolant, start the equipment regularly, and maintain the flexibility of the components.
Regularly inspect circuits, oil pipes, and seals, promptly repair damaged areas, and prevent safety hazards such as oil leakage and electric leakage.
Precautions related to operation
Strictly follow the operating procedures to avoid overloading drilling and prevent equipment damage caused by overloading.
Regularly calibrate instruments and control systems to ensure accurate parameters and guarantee drilling efficiency and safety.
![]()
![]()
![]()
![]()
![]()
![]()
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!