China factories

Chat Now Send Email
China factory - Weifang East Pipe Industry Technical Co., Ltd.

Weifang East Pipe Industry Technical Co., Ltd.

  • China,Weifang ,Shandong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Jacking Steel Pipe Spiral Steel Pipe For Water Gas And Oil Transport
China Jacking Steel Pipe Spiral Steel Pipe For Water Gas And Oil Transport

  1. China Jacking Steel Pipe Spiral Steel Pipe For Water Gas And Oil Transport
  2. China Jacking Steel Pipe Spiral Steel Pipe For Water Gas And Oil Transport

Jacking Steel Pipe Spiral Steel Pipe For Water Gas And Oil Transport

  1. MOQ: 1pce
  2. Price:
  3. Get Latest Price
Supply Ability 500 tons per day
Packaging Details bulk cargo
Brand Name EAST
Model Number DN200-DN3500
Certification ISO 9001, ISO 14001, ISO 45001,API 5L

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 500 tons per day Packaging Details bulk cargo
Brand Name EAST Model Number DN200-DN3500
Certification ISO 9001, ISO 14001, ISO 45001,API 5L
High Light water gas spiral steel pipewater gas jacking steel pipeoil transport spiral steel pipe

Jacked Pipe Spiral Steel Pipe

 

Pipe jacking is a trenchless method of installing pipes, conduits, and utility corridors by applying a force which pushes the pipe through the ground while controlled excavation takes place at the face.

The pipe jacking process begins with excavating relatively small entry and exit pits at the beginning and end of the pipe installation (usually at manhole locations). These pits are just large enough to accommodate the tunneling equipment and construction personnel. Once the pits are excavated, the hydraulic jacking rig and microtunneling machine are put into position.

The hydraulic jacking rig then applies a force that "pushes’" the tunneling machine through the wall of the entrance pit and into the ground. Once the machine reaches a predetermined position in the soil, a segment of pipe is lowered into the entrance pit behind the jacking rig and the microtunneling machine. An adaptor ring is typically used to link the pipe segment and the tunneling machine.

Next, the jacking rig, once again, applies a force that forces both the pipe and machine forward on their way to the exit pit. This process continues, with several pipe segments being jacked in sequence until the cutter head reaches the exit pit.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1979

  • Total Annual:

    90000000-100000000

  • Employee Number:

    700~750

  • Ecer Certification:

    Verified Supplier

WEIFANG EAST PIPE TECHNOLOGY, a large-scale enterprise integrating production, scientific research, sales, import and export trade and world-class steel anti-corrosion overall solution provider, specializes in manufacturing anti-corrosion construction steel. The company mainly manufactures long-d... WEIFANG EAST PIPE TECHNOLOGY, a large-scale enterprise integrating production, scientific research, sales, import and export trade and world-class steel anti-corrosion overall solution provider, specializes in manufacturing anti-corrosion construction steel. The company mainly manufactures long-d...

+ Read More

Get in touch with us

  • Reach Us
  • Weifang East Pipe Industry Technical Co., Ltd.
  • No. 3, 13996 Minzhu Street, Economic Development Zone, Weifang City, Shandong Province, China
  • https://www.east-steelpipes.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement