Payment Terms | L/C, D/A, D/P, T/T |
Supply Ability | 100 PCS/MONTH |
Delivery Time | 20 DAYS |
Packaging Details | WOODEN BOX |
Material | A234 |
Connection | butt weld |
Size | 1/2-24 INCH |
Application | Connect Pipes |
Packaging | Pallet/ wooden box |
Standard of carbon steel pipe fittings: | ASME |
Head Code | Round |
style | equal tee |
name | ANSI B16.9 A234 Wpb Sch40 Carbon Steel Equal Pipe Fitting Tee |
Brand Name | HUAWEI |
Model Number | 1/2-120 INCH |
Certification | CE |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Seamless Pipe Fittings 1/2-60 Inch A234 WPB 1D 1.5D Carbon Steel elbow
butt welded Seamless pipe fitting seamless carbon steel tee
Tee Equal Malleable Iron Pipe Fittings with threads Seamless Pipe Fittings
Carbon Steel ASME B16.9 Pipe Fitting Seamless Tee SCH40 DN50 ASTM A234 WPB Butt
Product Specification
Payment Terms | L/C, D/A, D/P, T/T | Supply Ability | 100 PCS/MONTH |
Delivery Time | 20 DAYS | Packaging Details | WOODEN BOX |
Material | A234 | Connection | butt weld |
Size | 1/2-24 INCH | Application | Connect Pipes |
Packaging | Pallet/ wooden box | Standard of carbon steel pipe fittings: | ASME |
Head Code | Round | style | equal tee |
name | ANSI B16.9 A234 Wpb Sch40 Carbon Steel Equal Pipe Fitting Tee | Brand Name | HUAWEI |
Model Number | 1/2-120 INCH | Certification | CE |
Place of Origin | CHINA | ||
High Light | 24inch carbon steel equal tee ,ansi b16.9 standard tee carbon steel ,schedule 40 tee carbon steel |
ANSI B16.9 A234 Wpb Sch40 Carbon Steel Equal Pipe Fitting Tee
Product Description:
Type | seamless/erw/semi-seamless 1D-D |
Thickness | sch10,sch20,sch30,std,sch40,sch60,xs,sch80, sch100,sch120,sch140,sch160,xxs |
Standard | ASME B16.9 ASTM JIS DIN |
Size | 1/2”-24” |
Surface treatment | bevelling,shot blasting,marking,painting according to customer requirement |
Packaging | fabric bag & wooden box & pallet |
Delivery | 10-15days |
1. Hydraulic bulging
The hydraulic bulging of the tee is a forming process of compensating the bulging of branch pipe by the axial direction of metal material.The process is to use special hydraulic press, with three links within the tube billet diameter equal injection liquid, through the two horizontal side of the hydraulic cylinder synchronization of the motion of tube billet, billet after squeezed smaller volume, smaller volume of liquid with the tube billet inside the tube billet and pressure, when pressure tee branch pipe bulge out to the metal material in the liquid in the cylinder and the pipe pressure under the dual role of flow along the mold cavity and the branch pipe.
The hydraulic bulging process of the tee can be formed in one time with high production efficiency.The head and shoulder wall thickness of the tee are increased.
2. Forging forming
Because of the limitation of equipment and processing conditions, forging tee is generally of small caliber.Processing costs are relatively high.
Product Show Pipe Fitting Tee
Contact me:
Darcy Dong
Whatsapp/ Wechat: 008615630731167
Guozhong International Limited
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2014
Total Annual:
100000000-200000000
Employee Number:
100~150
Ecer Certification:
Verified Supplier
Our company produce and export all kinds of carbon steel pipe fittings, Our city Cang Zhou city is the hometown of carbon steel pipe fittings. We have exported to many countries, such as, Russia, Egypt Malaysia, India, Turkey, Indonesia, Jordan etc. Now every month, we export more than 50 contain... Our company produce and export all kinds of carbon steel pipe fittings, Our city Cang Zhou city is the hometown of carbon steel pipe fittings. We have exported to many countries, such as, Russia, Egypt Malaysia, India, Turkey, Indonesia, Jordan etc. Now every month, we export more than 50 contain...
Get in touch with us
Leave a Message, we will call you back quickly!