| Payment Terms | T/T |
| Delivery Time | 15 working days |
| Packaging Details | Each packed in a wooden case |
| Standard | IEC62196-1, IEC60112 |
| Display mode | Button type |
| Height of drops | 35mm |
| Electrode pressure | 1.0±0.05N |
| Test Voltage | 0-600V settable |
| Working Power | AC 220V 50HZ or can be customized |
| Warranty | 12 months |
| Usage | CTI and PTI test |
| Brand Name | Pego Group |
| Model Number | TI-1 |
| Certification | Third-lab Calibration Certificate |
| Place of Origin | China |
View Detail Information
Explore similar products
TMD3628-92 Tracking Index Tester Platinum Electrode Material For CTI And PTI
Withstand Voltage Electrical Safety Test Equipment 10KV Output 50Hz / 60Hz Wave
ZY-2 Needle Flame Test Apparatus Auto Controlled Apply To Ignition Hazard
IEC60598 Electrical Safety Test Equipment Black Rectangular Draught Proof
Product Specification
| Payment Terms | T/T | Delivery Time | 15 working days |
| Packaging Details | Each packed in a wooden case | Standard | IEC62196-1, IEC60112 |
| Display mode | Button type | Height of drops | 35mm |
| Electrode pressure | 1.0±0.05N | Test Voltage | 0-600V settable |
| Working Power | AC 220V 50HZ or can be customized | Warranty | 12 months |
| Usage | CTI and PTI test | Brand Name | Pego Group |
| Model Number | TI-1 | Certification | Third-lab Calibration Certificate |
| Place of Origin | China | ||
| High Light | Button Type Leakage Tracking Test Equipment ,IEC62916-1 Leakage Tracking Test Equipment ,Electric Vehicle Leakage Tracking Test Equipment | ||
1. Introduction of leakage tracking test equipment
The leakage tracking test equipment is strictly designed and manufactured according to the requirements of IEC60112 standard, the equipment is required by IEC62196-1 clause 28.4 and 29.6. The tracking test is to apply a certain voltage between the 2mm*5mm platinum electrodes on the surface of a solid insulating material, and drop a conductive liquid (0.1% NH 4CL)with a specified droplet volume at a fixed height (35mm) for 30s to evaluate the leakage resistance of the surface of solid insulating materials under the combined action of electric field and humid or polluted media, and determine its comparative tracking index (CTI) and resistance to tracking index (PTI).
2. Application of leakage tracking test equipment
The leakage tracking test equipment is applicable for research, production and quality inspection departments of lighting equipment, low-voltage electrical appliances, household appliances, machine tool appliances, motors, power tools, electronic instruments, electrical instruments, and etc.. It is also suitable for insulating materials and engineering plastics, electrical connectors and auxiliary parts industry.
3. The sturcture of the leakage tracking test equipment
The tracking index test equipment is controlled by single chip and push buttons. The interval time, drop quantity, leakage current and test voltage are all can be set on the control panel. On the working room, the drop height can be measured by a gauge block, and the device controlls the size of the drop by adjusting the switch of the solenoid valve clockwise or counterclockwise. The test apparatus is built-in air exhaust, the front panel is transparent for easy observation of the experimental process.
4. Parameters of leakage tracking test equipment
| Control Method | Button + meter |
| Station | 1 |
| Height of drops | 35mm±5mm |
| Interal of drops | 30s±5s, 50 drops: 24.5min±2min |
| Size of drops | 20 drops: 0.380g~0.480g, 50 drops: 0.997g~1.147g |
| Test solutions | Solution A: 0.1%NH4Cl, 3.95±0.05Ωm, solution B: 1.98±0.05Ωm |
| Number of drops | 0~9999 (presettable, record and display) |
| Test wind speed | 0.2m/s |
| Short circuit current drop | 1.0A±0.1A drop 10% |
| Leakage indicator | 0.50A±10% , 2.00s±10% |
| Material of electrodes | ≥99% platinum |
| Size of electrodes | 2mm±0.1mm)×(5mm±0.1mm)×(40mm±5mm), length≥12mm, Angle of chisel-edged: 30°±2° |
| Electrode distance | 4.0mm±0.1mm, angle: 60°±5° |
| Electrode pressure | 1.00±0.05N |
| Electrode voltage | 100~600V |
| Safe operation interface | automatically power off upon open the glass window |
5. Packing list of leakage tracking test equipment
| No. | Commodity | Unit | Qty |
| 1 | Tester | set | 1 |
| 2 | Block Gauge (4mm) | piece | 1 |
| 3 | Glassware | piece | 2 |
| 4 | Tray | piece | 1 |
| 5 | 35mm height gauge | piece | 1 |
| 6 | Micro electronic scale | piece | 1 |
| 7 | Power cord | piece | 1 |
| 8 | User Manual | Copy | 1 |
5. Test bench of leakage tracking test equipment
![]()
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company
Year Established:
2014
Ecer Certification:
Verified Supplier
Pego Electronics is founded by PEGO GROUP in 2011, a professional high-tech enterprise engaged in developing, marketing and service for electronic test equipment. Our business scope includes IP testing equipment, dust chamber, pendulum and vertical impact testing equipment, flame test apparatus,&nbs... Pego Electronics is founded by PEGO GROUP in 2011, a professional high-tech enterprise engaged in developing, marketing and service for electronic test equipment. Our business scope includes IP testing equipment, dust chamber, pendulum and vertical impact testing equipment, flame test apparatus,&nbs...
Get in touch with us
Leave a Message, we will call you back quickly!