| Power factor | 0.99 |
| Connector Standards | CCS1, CCS2, CHAdeMO, GB/T |
| Starting Methods | RFID card, mobile APP, QR code, VIN code |
| Safety Protection | Short circuit, overtemperature, overcurrent, earth leakage, overvoltage, undervoltage |
| Delivery Time | |
| Customization | OEM / ODM available |
| Power | 60kW / 120kW optional |
| Network | 4G / Ethernet / WiFi |
| Maximum Output current of a single gun | 125A (60kW) / 250A (120kW) |
| Cooling method | Forced air cooling |
| Communication Protocol | OCPP 1.6J |
| Supply Ability | |
| Display | 10 inch high brightness color touch screen |
| Input Voltage | 380V +/-15%, three phase |
| Payment Terms | T/T,L/C,D/P,D/A |
| Product Series | Bailu Series DC Fast Charger |
| Cable Length | 5M standard |
| Output Voltage | 200-750V DC |
| Packaging Details | Export wooden case with moisture barrier and shock absorbing base, accessory box for cables and documents |
| Application | Highway service areas, parking lots, commercial parks, fleet depots |
| Protection grade | IP54 |
| Working Frequency | 50Hz +/-10% |
| Gun Configuration | Dual gun, balanced power sharing |
| Peak efficiency | 96% |
| Operating Temperature | -40C to +60C |
| Model Number | CLF-DC-60-120KW |
| Certification | TUV, CE, FCC |
| Brand Name | Mckee Charging Cube |
| Place of Origin | Luoyang, China |
View Detail Information
Explore similar products
High Quality OEM Waterproof 120kW Dc Fast Charger With Lcd Screen IP54 OCPP1.6J
750*900*1820MM Dimensions DC EV Charger with Wooden Box Packing and Short
DC Charging Pile Intelligent Distribution For Electric Vehicles Of Various
DC Charging Pile 120kW High Power Compatible With CCS2/CHAdeMO/GB National
Product Specification
| Power factor | 0.99 | Connector Standards | CCS1, CCS2, CHAdeMO, GB/T |
| Starting Methods | RFID card, mobile APP, QR code, VIN code | Safety Protection | Short circuit, overtemperature, overcurrent, earth leakage, overvoltage, undervoltage |
| Delivery Time | Customization | OEM / ODM available | |
| Power | 60kW / 120kW optional | Network | 4G / Ethernet / WiFi |
| Maximum Output current of a single gun | 125A (60kW) / 250A (120kW) | Cooling method | Forced air cooling |
| Communication Protocol | OCPP 1.6J | Supply Ability | |
| Display | 10 inch high brightness color touch screen | Input Voltage | 380V +/-15%, three phase |
| Payment Terms | T/T,L/C,D/P,D/A | Product Series | Bailu Series DC Fast Charger |
| Cable Length | 5M standard | Output Voltage | 200-750V DC |
| Packaging Details | Export wooden case with moisture barrier and shock absorbing base, accessory box for cables and documents | Application | Highway service areas, parking lots, commercial parks, fleet depots |
| Protection grade | IP54 | Working Frequency | 50Hz +/-10% |
| Gun Configuration | Dual gun, balanced power sharing | Peak efficiency | 96% |
| Operating Temperature | -40C to +60C | Model Number | CLF-DC-60-120KW |
| Certification | TUV, CE, FCC | Brand Name | Mckee Charging Cube |
| Place of Origin | Luoyang, China | ||
| High Light | Dual Gun Balanced Power Sharing ,CCS1 CCS2 CHAdeMO GB/T Guns ,RFID APP QR VIN Start | ||
The Bailu series 60kW / 120kW DC fast charging station is built for sites that need dependable fast charging without a heavy grid upgrade. Two guns share the installed power through balanced power sharing, so a single cabinet serves two vehicles efficiently during peak hours and delivers full power to one gun when demand drops.
| Power | 60kW / 120kW optional |
|---|---|
| Input Voltage | 380V ±15%, three phase |
| Output Voltage | 200–750V DC |
| Max Output Current (single gun) | 125A (60kW) / 250A (120kW) |
| Working Frequency | 50Hz ±10% |
| Power Factor | 0.99 |
| Peak Efficiency | 96% |
| Cooling Method | Forced air cooling |
| Protection Grade | IP54 |
| Operating Temperature | -40°C to +60°C |
| Connector Standards | CCS1, CCS2, CHAdeMO, GB/T |
| Gun Configuration | Dual gun, balanced power sharing |
| Display | 10 inch high brightness color touch screen |
| Communication Protocol | OCPP 1.6J |
| Network | 4G / Ethernet / WiFi |
| Cable Length | 5M standard |
| Certification | TUV, CE, FCC |
| Place of Origin | Luoyang, China |
Gun type combinations, connector branding, language of the interface, cable length and payment integration can be configured per order. Standard lead time is 25–35 working days, packed in export wooden cases with accessories and commissioning documents.
Mckee has focused on electric vehicle charging systems since 2011, covering AC wall boxes, portable charging plugs, DC fast charging stations from 60kW to 360kW and split charging systems. Products are TUV, CE and FCC certified, and OEM/ODM projects are supported with customized branding, connector configuration and communication options.
Send us your site power capacity, required power level and connector standard, and our engineering team will reply within 24 hours with a configuration proposal and quotation.
Company Details
Business Type:
Manufacturer,Exporter
Total Annual:
10000000-50000000
Employee Number:
101~150
Ecer Certification:
Verified Supplier
Luoyang Mckee Intelligent Technology Co., LTD. is a subsidiary of Henan Topway Control Technology Co., Ltd, which is professional in manufacturing charger modules and assembling EV charging piles, and we could provide a turnkey project of charging station with optical storage, based on the research ... Luoyang Mckee Intelligent Technology Co., LTD. is a subsidiary of Henan Topway Control Technology Co., Ltd, which is professional in manufacturing charger modules and assembling EV charging piles, and we could provide a turnkey project of charging station with optical storage, based on the research ...
Get in touch with us
Leave a Message, we will call you back quickly!