Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Delivery Time | 30 work days |
Packaging Details | Wooden case packaging |
Prophylactic | Temperature protection |
Charging Time | 20-40 mins (10-80%) |
Rated Power | DC 120kW |
Input voltage | 480 VAC |
Output voltage | 220-1000V DC Constant |
Output power | 120KW |
Charging interface | CCS2/CCS1/CHAdeMO |
Protection level | IP54 |
Warranty | 24 months |
Certifed | CE/UL/CHAdeMO |
RFID System | OCPP1.6,WIFI,3/4G,pose |
Charging Cable Length | 5m |
Brand Name | Mckee Charging Cube |
Model Number | CLF-DC-120KW |
Certification | CE/UL/CHAdeMO |
Place of Origin | Luoyang, China |
View Detail Information
Explore similar products
Household Convenience Movable New Energy DC 7kw 15kw 20kw 30kw 40kw 60kw Smart
DC EV Charging Station GBT CCS2 CCS1 CHADeMo 60kw 120kw 180kw 240kw Home
60KW/80KW/120KW/160KW Integrated Dual-gun DC Charging Pile / Electric Vehicle
Mckee 240KW/320KW/360KW Integrated Dual-gun DC Charging Pile / Electric Vehicle
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Delivery Time | 30 work days |
Packaging Details | Wooden case packaging | Prophylactic | Temperature protection |
Charging Time | 20-40 mins (10-80%) | Rated Power | DC 120kW |
Input voltage | 480 VAC | Output voltage | 220-1000V DC Constant |
Output power | 120KW | Charging interface | CCS2/CCS1/CHAdeMO |
Protection level | IP54 | Warranty | 24 months |
Certifed | CE/UL/CHAdeMO | RFID System | OCPP1.6,WIFI,3/4G,pose |
Charging Cable Length | 5m | Brand Name | Mckee Charging Cube |
Model Number | CLF-DC-120KW | Certification | CE/UL/CHAdeMO |
Place of Origin | Luoyang, China | ||
High Light | Commercial Use Electric Charging Pile ,4g Electric Charging Pile ,RFID Electric Charging Pile |
DC fast charging station electric charging pile electric charging station with RFID 4g commercial use
✔ Fast Charging Speed – Suitable for most EVs, delivers ~80% charge in 20-40 mins (varies by battery size).
✔ Dual-Port Flexibility – Often supports CCS + CHAdeMO or dual CCS connectors.
✔ Cost-Effective – Lower installation and operational costs vs. ultra-rapid chargers.
✔ Wide Compatibility – Works with most EVs (except some high-voltage models).
Parameter | Specification |
---|---|
Power Output | 120kW (max) |
Voltage Range | 200-1000V DC |
Current Output | Up to 300A |
Connector Types | CCS1/CCS2, CHAdeMO (optional) |
Efficiency | ≥93% |
Cooling System | Liquid-cooled cables (optional) |
Grid Compatibility | 3-phase AC, 380-480V |
Dimensions | ~800x600x1800mm (varies by model) |
Weight | 300-500kg |
Type | Power Range | Charging Time (Example) | Use Case |
---|---|---|---|
120kW | DC Fast | 30–40 mins (80%) | Public fast-charging |
7kW–22kW | AC Slow | 6–10 hours (100%) | Home/workplace |
350kW+ | Ultra-Fast | 15–20 mins (80%) | Premium charging hubs |
Best For:
Highway rest stops
Urban fast-charging hubs
Fleet operators
Company Details
Business Type:
Manufacturer,Exporter
Total Annual:
10000000-50000000
Employee Number:
101~150
Ecer Certification:
Verified Supplier
Luoyang Mckee Intelligent Technology Co., LTD. is a subsidiary of Henan Topway Control Technology Co., Ltd, which is professional in manufacturing charger modules and assembling EV charging piles, and we could provide a turnkey project of charging station with optical storage, based on the research ... Luoyang Mckee Intelligent Technology Co., LTD. is a subsidiary of Henan Topway Control Technology Co., Ltd, which is professional in manufacturing charger modules and assembling EV charging piles, and we could provide a turnkey project of charging station with optical storage, based on the research ...
Get in touch with us
Leave a Message, we will call you back quickly!