Payment Terms | T/T |
Supply Ability | 10 Sets Per Month |
Delivery Time | 30 Days |
Packaging Details | Export packing |
Dust concentration | 2~4kg/m3 |
Product vacuum degree | ≤60KPa |
Airflow speed | Not more than 2m/s |
Air flow meter | Mechanical type |
Inner chamber dimensions | 3000*2000*3300mm (W*D*H) |
Outer chamber dimensions | 3200*2700*4500 mm(W*D*H) |
Effective volume | 19.8m³ |
Working humidity | ≤75%R.H |
Brand Name | Sinuo |
Model Number | SN441C-19.8F |
Certification | Calibration Certificate (Cost Additional) |
Place of Origin | China |
View Detail Information
Explore similar products
DIN 40050-9 High Pressure Water Ingress Testing Equipment IPX6K IPX9K Jet Nozzle
IPX1 IPX2 Water Ingress Testing Equipment Vertical Rain Drip Box IEC 60529
IPX1 IPX4 Water Ingress Testing Equipment Rain Spray IP Code Test Chamber IEC
IPX3 IPX6 Water Spray Test Chamber Jet Nozzle IP Code Testing Chamber
Product Specification
Payment Terms | T/T | Supply Ability | 10 Sets Per Month |
Delivery Time | 30 Days | Packaging Details | Export packing |
Dust concentration | 2~4kg/m3 | Product vacuum degree | ≤60KPa |
Airflow speed | Not more than 2m/s | Air flow meter | Mechanical type |
Inner chamber dimensions | 3000*2000*3300mm (W*D*H) | Outer chamber dimensions | 3200*2700*4500 mm(W*D*H) |
Effective volume | 19.8m³ | Working humidity | ≤75%R.H |
Brand Name | Sinuo | Model Number | SN441C-19.8F |
Certification | Calibration Certificate (Cost Additional) | Place of Origin | China |
Environmental Testing Walk-in Large Sand And Dust Test Chamber 19.8m³
Complied Standards & Clauses
IEC 60068-2-68: 2001 Environmental testing- Part 2: Tests- Test L Dust and sand.
Product Overview
1. The equipment is a walk in structure with spliced warehouse boards. There is a funnel in each of the four corners. The middle flat adopts a dust brush structure. The side-through dust brush structure brushes dust into the funnels on both sides.
2. There is a rotating sand and dust feeding device at the air inlet end of the working room to meet the needs of dust blowing.
3. The circulating air duct is equipped with a heating and dehumidification device.
4. There is an observation window on the door. The test box has double doors and is sealed with double layers of aging-resistant silicone rubber.
5. The outer wall material of the test room and whirlpool duct is made of high-strength double-sided galvanized steel plate with fine powder baking paint on the surface. The inner wall is processed and formed by SUS304 stainless steel plate. The frame is made of 10# square tube after anti-rust treatment and spraying.
6. Temperature and humidity control uses an intelligent controller (relative humidity uses a direct-reading sensor) (panel control uses a touch screen).
Technical Parameters
Working room temperature | RT+10℃~+70℃ |
Product vacuum degree | ≤60KPa |
Inner chamber dimensions | 3000*2000*3300mm (W*D*H) |
Outer chamber dimensions | About 3200*27000*4500 mm(W*D*H) |
Working humidity | ≤75%R.H |
Test sample specifications | Charging stations, electrical cabinets, energy storage cabinets The size range is not larger than 2000*1500*2500m (W*D*H) Weight 1000kg |
Dust composition | Talcum powder |
Dust concentration | 2~4kg/m3 |
Composition of dust particles | Dry talcum powder that can pass through a square hole sieve with a mesh size of 75µm and a wire mesh diameter of 50µm |
Sand and dust air circulation device | Circulation air ducts and high-power mixed-flow ventilators have an air extraction volume of 80 times the tested shell volume, and the air extraction speed does not exceed 60 times the shell volume per hour. And the speed of the airflow can make the dust evenly distributed in the test chamber. The airflow in the test chamber is mainly top-down vertical airflow rather than laminar flow. The pressure gauge has a calibration interface. |
Dust test device | a) Set up 1 funnel at each of the 4 corners of the test chamber and 2 funnels in the middle (a total of about 6 pieces, subject to actual use), and a metal dust filter is installed on the upper surface of the funnel. b) A set of rotating devices is designed between the lower part of the loading platform and the bottom plate of the warehouse, and the dust is swept into the funnels at the four corners through dust brushes. c) A high-power mixed-flow fan is installed at the bottom of the funnel to send the dust to the working room through the circulating air duct for settlement. |
Details
Company Details
Business Type:
Manufacturer
Year Established:
2019
Employee Number:
<100
Ecer Certification:
Verified Supplier
Sinuo Testing Equipment Co., Limited established in 2019, but Sinuo has rich experience in manufacturing test euipment, test system and offering overall laboratory construction of electronic and electrical products. Sinuo's main products include electrical vehicle te... Sinuo Testing Equipment Co., Limited established in 2019, but Sinuo has rich experience in manufacturing test euipment, test system and offering overall laboratory construction of electronic and electrical products. Sinuo's main products include electrical vehicle te...
Get in touch with us
Leave a Message, we will call you back quickly!