| Certifiion | ISO9001 |
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 500-Sets/month |
| Delivery Time | 3-5 days |
| Packaging Details | Wooden Case Packing |
| Part Number | 227-6035 296-6299 |
| Video outgoing-inspection | Provided |
| Product name | 320C E320D E323D Travel Reduction Gearbox |
| Delivery time | 1-3 days |
| Warranty | 6 Months |
| Packing | Wooden box |
| Product class | Excavator Travel Reduction Gearbox |
| Quality | High Quaity |
| Condition | New |
| Place Of Origin | Guangdong |
| Brand Name | |
| Model Number | 320C E320D E323D |
| Place of Origin | China |
View Detail Information
Explore similar products
Travel Final Drive Gearbox 099-4141 E120B Excavator Travel Parts
XKAH-00367 Excavator Travel Reduction Gearbox R140LC-7 R130-5 R150-7
9096483 9066008 9080070 Final Travel Drive Gear Box EX200-1 EX220-1
OEM Travel Reduction Gearbox SH200 SH200A3 XKAH-00367 Excavator Parts
Product Specification
| Certifiion | ISO9001 | Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 500-Sets/month | Delivery Time | 3-5 days |
| Packaging Details | Wooden Case Packing | Part Number | 227-6035 296-6299 |
| Video outgoing-inspection | Provided | Product name | 320C E320D E323D Travel Reduction Gearbox |
| Delivery time | 1-3 days | Warranty | 6 Months |
| Packing | Wooden box | Product class | Excavator Travel Reduction Gearbox |
| Quality | High Quaity | Condition | New |
| Place Of Origin | Guangdong | Brand Name | |
| Model Number | 320C E320D E323D | Place of Origin | China |
| High Light | E320C Travel Reduction Gearbox ,E320D Travel Reduction Gearbox ,227-6035 | ||
Product Descriptio
| Pos. | Part No | Qty | Parts name |
| 1 | 6I-6583 | [1] | GEAR-SUN (13-TEETH) |
| 2 | 6I-6585 | [3] | GEAR-PLANETARY (44-TEETH) |
| 3 | 7Y-0223 | [3] | SHAFT-PLANETARY |
| 4 | 7Y-0225 | [3] | SHAFT-PLANETARY |
| 5 | 7Y-1426 | [1] | COVER |
| 6 | 7Y-1430 | [1] | GEAR-SUN (17-TEETH) |
| 7 | 7Y-1431 | [3] | GEAR-PLANETARY (30-TEETH) |
| 8 | 7Y-1432 | [1] | CARRIER |
| 9 | 7Y-1433 | [1] | CARRIER |
| 10 | 7Y-1558 | [1] | SPACER (90X119.6X7.5-MM THK) |
| 11 | 094-0580 | [1] | PLATE (10-MM THK) |
| 12 | 094-0611 | [6] | WASHER (47.3X76X1-MM THK) |
| 13 | 094-1528 | [6] | WASHER (53X84X1-MM THK) |
| 14 | 095-0891 | [6] | PIN-SPRING |
| 15 | 096-1773 B | [1] | SHIM (0.15-MM THK) |
| 096-1774 B | [1] | SHIM (0.3-MM THK) | |
| 096-1775 B | [1] | SHIM (0.4-MM THK) | |
| 096-1776 B | [1] | SHIM (0.5-MM THK) | |
| 096-1777 B | [1] | SHIM (0.6-MM THK) | |
| 096-1778 B | [1] | SHIM (0.7-MM THK) | |
| 096-1779 B | [1] | SHIM (0.8-MM THK) | |
| 096-1780 B | [1] | SHIM (1-MM THK) | |
| 096-1781 B | [1] | SHIM (1.6-MM THK) | |
| 24 | 114-1539 | [6] | PIN-DOWEL |
| 25 | 148-4715 | [1] | GEAR-COUPLING (55-TEETH) |
| 26 | 174-4874 | [1] | SEAL GP-DUO-CONE |
| 27 | 191-3235 | [1] | HOUSING |
| 28 | 227-6034 M | [14] | BOLT-FLANGE HEAD (M16X2X60-MM) |
| 29 | 296-6220 | [2] | BALL BEARING |
| 30 | 296-6268 | [3] | BEARING AS-ROLLER |
| 31 | 296-6269 | [6] | BEARING-ROLLER |
| 32 | 296-6300 Y | [1] | GEAR GP-TRANSFER |
| 33 | 353-0612 | [1] | HOUSING-MOTOR |
| 34 | 095-1270 M | [2] | SETSCREW-SOCKET (M12X1.75X30-MM) |
| 35 | 3E-2338 | [2] | PLUG-PIPE |
| 36 | 6D-0692 | [1] | SEAL-O-RING |
| 37 | 7M-8485 | [2] | SEAL-O-RING |
| 38 | 453-4137 | [16] | BOLT (M20X2.5X180-MM) |
| 39 | 7Y-1434 | [1] | SPACER (40X69.5X6-MM THK) |
| 40 | 451-2176 | [16] | WASHER-HARD (22X35X3.5-MM THK) |
| 1U-8846 BF | SEALANT-GASKET | ||
| B | USE AS REQUIRED | ||
| F | NOT SHOWN | ||
| M | METRIC PART | ||
| Y | SEPARATE ILLUSTRATION |
![]()
![]()
About Xinfeng Machinery (XF) parts:
![]()
![]()
Advantages
![]()
Warehouse Display
![]()
Packaging and Delivery
![]()
![]()
FAQ
1.How to quickly and accurately buy products what lneeded?
A:Provide the original parts number to us to check.
2.How long have you been in the excavator
A:We are engaged in excavator parts since 1998
3.lfI don't know the part number,what shouldI do?
A:Please send us size and pictures of old products.
4.What is the warranty of the products?
A:The warranty is 6/12 Months based on the specific product.
5.How long is your delivery time?
A:The normal delivery time is 3-5 days for stock sproductsafter getting payment. lf not in stock, we will inform you thetime requlred.
6.Which shipping term you can supply?
7.What is your MOQ?
A:Small order and sample order are acceptable
8.Do you have any After-Sales service?
A:Yes!Our
Company Details
Business Type:
Manufacturer,Agent,Trading Company,Seller
Year Established:
1998
Total Annual:
500000-1000000
Employee Number:
50~80
Ecer Certification:
Verified Supplier
About Xinfeng Machinery (XF) parts: Xinfeng Machinery Parts Company was established in 1998. It is a professional team composed of high-quality technical personnel integrating production, maintenance, sales, and service. It is committed to providing customers with high-quality and effic... About Xinfeng Machinery (XF) parts: Xinfeng Machinery Parts Company was established in 1998. It is a professional team composed of high-quality technical personnel integrating production, maintenance, sales, and service. It is committed to providing customers with high-quality and effic...
Get in touch with us
Leave a Message, we will call you back quickly!