Certifiion | OEM |
Payment Terms | T/T, Western Union,Paypal |
Supply Ability | 600 pieces per month |
Delivery Time | 2-5days |
Packaging Details | Wooden |
Part number | 1033000150 C0170-55076 |
Warranty | 6 Months |
Material | Steel |
Type | Excavator Spare Parts |
Part name | Contol valve assy |
Brand Name | Belparts |
Model Number | DH225-7 |
Place of Origin | China |
View Detail Information
Explore similar products
PC160LC-7 Control Valve PC160LC Main Valve PC160 Main Control Valve 723-57-16400
Hyundai Excavator Control Valve 31NB-10110 R455 R485 Main Control Valve
SY335 KMX32N Excavator Replacement Parts , Excavator Accessories Hydraulic Main
SANY 60242873 Excavator Spare Parts Valve SY485 KMX32NA Control Valve
Product Specification
Certifiion | OEM | Payment Terms | T/T, Western Union,Paypal |
Supply Ability | 600 pieces per month | Delivery Time | 2-5days |
Packaging Details | Wooden | Part number | 1033000150 C0170-55076 |
Warranty | 6 Months | Material | Steel |
Type | Excavator Spare Parts | Part name | Contol valve assy |
Brand Name | Belparts | Model Number | DH225-7 |
Place of Origin | China | ||
High Light | construction equipment parts ,excavator replacement parts |
Excavator spare parts hydraulic main valve 1033000150 C0170-55076 control valve for DH225-7 DH220-5 DH215-7
Product Description
1. Product name | Excavator spare parts hydraulic main valve 1033000150 C0170-55076 control valve for DH225-7 DH220-5 DH215-7
|
2. Place of Origin: | China(mainland)
|
3. Model: | DH225-7 DH220-5 DH215-7
|
4. Part number: | 1033000150 C0170-55076
|
5. MOQ: | 1 PCS
|
6. Payment term: | T/T & Western Union & Paypal
|
7. Delivery time: | Within 2 days after receiving the payment
|
8. Packing: | Standard exporting packing or as required
|
Detailed picture
Supply Ability
Supply Ability: 600 Piece/Pieces per Week
Packaging & Delivery
Packaging Details: Inner Packing: plastic film packing
Outer Packing: carton packing.
Port: Huangpu
Lead Time: Ship in 1-2 days after receiving the payment
Our Benefits
1.All Fuel Injectors are tested by ASNU;
2.Flow matched within 1%;
3.Data sheet is available(we are the only one on alibaba who has REAL data sheet);
4.Sample order accept;
5.12 months warrantly no miles limited;
6.Fast shipping.
FAQ
Q1: What is the parts packing?
A: All the packages are genuine original packing, we can also provide neutral packing or according to your requirements.
Q2: What is your payment Terms?
A: We accept T/T, Western Union, Alibaba Trade Assurance Payment Order, and Paypal. T/T and Alibaba Trade Assurance Order Payment always need 2-3 workdays to our accounts. Western Union and Paypal will be in time to our account.
Q3: What is your transport method?
A: Courier Express, By air, By sea, By truck.
Q4: What is your delivery time?
A: We ship goods AT ONCE after receiving your payment if we have products in stock.
If we need time to order products, we will inform the approximate time and ship ASAP.
Q5: When can we receive the goods?
A: It often takes 5-7 days by courier express after receiving your payment, but the actual time depends on the shipping method you choose.
Company Details
Business Type:
Manufacturer,Agent,Exporter,Trading Company
Year Established:
2013
Total Annual:
2000000-3000000
Employee Number:
>100
Ecer Certification:
Verified Supplier
GZ BELPARTS ENGINEERING MACHINERY LIMITED Belparts was established in September 2013 which is loed in Guangzhou. At present , we owns one shop, one warehouse and one office as well as a professional team for purchasing, selling, packing, shipping and after-sale service. To ... GZ BELPARTS ENGINEERING MACHINERY LIMITED Belparts was established in September 2013 which is loed in Guangzhou. At present , we owns one shop, one warehouse and one office as well as a professional team for purchasing, selling, packing, shipping and after-sale service. To ...
Get in touch with us
Leave a Message, we will call you back quickly!