Certifiion | OEM |
Payment Terms | T/T, Western Union,Paypal |
Supply Ability | 500 pieces per month |
Delivery Time | 2-5days |
Packaging Details | Carton |
Name | Swing reduction housing |
Condition | Genuine new |
egory | Excavator Planetary Gear Parts |
Warranty | 3 months, 3 Months |
P/N | / |
Delivery | 2 days |
Brand Name | Belparts |
Model Number | DH370 |
Place of Origin | China |
View Detail Information
Explore similar products
ZX330 HPV145 Head 1022441 Cylinder Block Rotor 2022744 Valve Plate 9749142
A8VO55 A8V55 Excavator Handok Hydraulic Pump Parts, HD880-2 HD500 HD450
Rexroth A10VSO A10VSO45 Excavator Hydraulic Axial Piston Pump Parts Swash Plate
KOBELCO SK250-8 SK200-1 SK220-3 Parts Cylinder Block , Washer And Piston For
Product Specification
Certifiion | OEM | Payment Terms | T/T, Western Union,Paypal |
Supply Ability | 500 pieces per month | Delivery Time | 2-5days |
Packaging Details | Carton | Name | Swing reduction housing |
Condition | Genuine new | egory | Excavator Planetary Gear Parts |
Warranty | 3 months, 3 Months | P/N | / |
Delivery | 2 days | Brand Name | Belparts |
Model Number | DH370 | Place of Origin | China |
High Light | planetary gear unit ,construction equipment parts |
Daewoo DH370 Excavator Planetary Gear Parts Swing reduction housing slew gearbox holder
Product parameter of Daewoo DH370 Excavator Planetary Gear Parts Swing reduction housing
Name or description of a commodity | Daewoo DH370 Excavator Planetary Gear Parts Swing reduction housing |
Production address | China |
Type | DH370 |
Minimum Order Quantity | 1 pieces |
Payment Method | T/T & Western Union & Paypal & Visa & MasterCard & e-Checking & Boleto |
Shipping Time | Within 2 days after receiving The payment |
Packaging | First layer is packed in plastic and the second in wooden s |
Packaging & Delivery
Selling Units: Single item
Single package size: 38X38X45 cm
Single gross weight: 70.0 kg
Package Type: Plywood box
Lead Time :
Quantity(Unit) | 1 - 10 | >10 |
Est. Time(days) | 2 | To be negotiated |
Pictures of Daewoo DH370 Excavator Planetary Gear Parts Swing reduction housing
DOOSAN | DH50-7, DH55D, DH60-7, DH80, DH130, DH150, DH150W-9, DH215-5, DH200-5, DH150LC-7, DH215-7, DH220-5, DH220-7, DH220-9, DH220-10, DH225-9, DH258, DH258LC-7, DH280, DH290B, DH300-5, DH300-7, DH320, DH360, DH370, DH500, DX300 | ||
HYUNDAI | R60-7, R80, R130, R140, R150-7, R150-9, R1107-7, R160-7, R210, R220, R220-7, R215-7, R220-5, R225-7, R225-9T, R225lc-7, R290, R350-7,R110-9, R215-9, R275LC-9, R305, R305-7, R320, R335-7,R360, R370, R375, R375-7H, R455, R460, R485-7 | ||
| EC130, EC140B, EC210B, EC210C, EC235C, EC240B, EC290, EC290B, EC290C, EC360B, EC460B, EC460C, EC480D | ||
| E305, E320, E325C, E315C, E330C, E315D, E320D, E325D, E330D, E360D, E70B, E120B, E200B, E320B, E330B | ||
KOMATSU | PC35,PC40,PC45, PC50, PC55, PC60,PC60-6, PC70, PC75, PC78, PC80, PC90, PC100, PC110, PC120, PC120-7, PC130, PC150, PC160, PC180, PC200,PC200-6, PC200-7,PC200-8, PC210-8, PC220-6,PC220-7,PC210, PC220, PC230, PC240,PC240-8, PC270, PC300, PC360,PC360-7, PC350, PC400, PC450, PC650, PC750, PC1250 D31, D50, D65, D85, D155, D275, D375, D475 | ||
HITACHI | EX200-2, EX220-2, EX120-5, EX200-5, EX220-5, EX400-5, ZAXIS200-3, ZAXIS210-3, ZAXIS240-3, ZAXIS 270-3, ZAXIS330-3, ZAXIS360-3, ZAXIS110, ZAXIS120, ZX200-6 | ||
KOBELCO | SK200-3, SK200-5, SK135rs, SK70rs,SK60,SK120-5, SK200-8, SK250-8, SK260-8, SK130-8, SK200-6e, SK210-6e, SK160 | ||
KATO | HD80R, HD820-5, HD1023, HD1430, HD700-7,HD1430-7, HD1250-7, HD450-7 | ||
SUMITOMO | SH120A2/A3,SH130, SH200A2/A3, SH210A5, SH240A3, SH360A5 | ||
KUBOTA | KX155, KX135, KX161-3 |
A). TT transfer, Western Union, Paypal, Moneygram are acceptable.
B). Light goods inner box is neutral white with an strong outer box.Heavy goods wooden with standard packing.If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
C). Delivery time: depends on items you buy, most electric parts can shiped within 1-3 working days.
D). DHL /Fedex /UPS /TNT/ARMEX/SF Express ,etc. normal express shipping way for small cargo.Russia,Kazakhstan, Ukraine Russia Special Line,Bangladesh,Myanmar,Vietnam ect, competitive shipping way no need you do customs clearance.Door to Door.
Our Services
1. Professional technology support
2. After-sale service
3. 24 hours on-line service
4. Help you to solve your excavator problems
FAQ
Q: What is your delivery time?
A: Delivery time is always within 3 days after receiving the payment if in stock.
If no stock,need to wait for about 10 days.
Q: What is the product warranty?
A: Products warranry are different among different types.
For example,the water pump for engine,our warranty is 1 year.
And for Genuine new products,the warranty is always 6 months.
Company Details
Year Established:
2013
Total Annual:
20000-3000000
Employee Number:
50~93
Ecer Certification:
Verified Supplier
GZ Yuexiang Engineering Machinery Co., Ltd. GZ Yuexiang Engineering Machinery Co., Ltd, is a foreign trade company integrating development, sales, procurement, warehousing, transportation and service. Founded in September 2013, we have more than twelve years of experience in machinery t... GZ Yuexiang Engineering Machinery Co., Ltd. GZ Yuexiang Engineering Machinery Co., Ltd, is a foreign trade company integrating development, sales, procurement, warehousing, transportation and service. Founded in September 2013, we have more than twelve years of experience in machinery t...
Get in touch with us
Leave a Message, we will call you back quickly!