Certifiion | OEM |
Payment Terms | T/T, Western Union,Paypal |
Supply Ability | 500 pieces per month |
Delivery Time | 2-5days |
Packaging Details | Wooden |
Appliion | Excavator |
Warranty | 6 Months |
Part Name | hydraulic spare part |
Material | Steel |
Part number | HPV050 |
Brand Name | Belparts |
Model Number | EX100-5 |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
ZX330 HPV145 Head 1022441 Cylinder Block Rotor 2022744 Valve Plate 9749142
A8VO55 A8V55 Excavator Handok Hydraulic Pump Parts, HD880-2 HD500 HD450
Rexroth A10VSO A10VSO45 Excavator Hydraulic Axial Piston Pump Parts Swash Plate
KOBELCO SK250-8 SK200-1 SK220-3 Parts Cylinder Block , Washer And Piston For
Product Specification
Certifiion | OEM | Payment Terms | T/T, Western Union,Paypal |
Supply Ability | 500 pieces per month | Delivery Time | 2-5days |
Packaging Details | Wooden | Appliion | Excavator |
Warranty | 6 Months | Part Name | hydraulic spare part |
Material | Steel | Part number | HPV050 |
Brand Name | Belparts | Model Number | EX100-5 |
Place of Origin | Guangdong, China | ||
High Light | hydraulic pump spare parts ,hydraulic pump excavator parts |
Belparts excavator main pump repair kit Hitachi EX100-5 HPV050 hydraulic part
HPV050 Piston is the part of hydraulic pump and applies for EX100-5 Excavator , HPV050 hydraulic pump has 18 pcs pistons in it , and the crawler excavator has a high price-performance ratio, which is always favored by the customers and our products are all favorable products.
Product description
1. Appliion: Excavator
2. Part name: Hydraulic pump part
3. Material: Steel
4. Pump Model: A8VO160
5. MOQ: 1PCS
6. Warranty: 6 months
7. Payment term: T/T, Western union, paypal, trade assurance or as required
8. Delivery: 2 days after the payment received
9. Shipment: by sea, by air, by express or as required
List of spare parts
# | Part No | Part Name | Qty. | Price request |
---|---|---|---|---|
|
| PUMP; UNIT | 1 |
|
01 | 1020513 | . CASING; PUMP |
|
|
03 | 2036963 | . DISC; DRIVING |
|
|
04 | 2036965 | . DISC; DRIVING |
|
|
06 | 4339254 | . BRG.; ROL. |
|
|
07 | 4348299 | . RING |
|
|
08 | 4338325 | . BRG.; ROL. |
|
|
09 | 4180790 | . NUT; BRG. |
|
|
10 | 4331993 | . RING; THRUST | 1 |
|
12 | 4340358 | . SEAL; OIL |
|
|
13 | 4086775 | . RING; RETAINING |
|
|
15 | 4233165 | . PLUG |
|
|
16 | 957366 | . O-RING | 2 |
|
18 | 9742464 | . PISTON | 14 |
|
21 | 4339296 | . SHAFT; CENTER | 2 |
|
22 | 4198956 | . PIN | 2 |
|
23 | 4180786 | . SPRING; COMPRES. | 2 |
|
25 | 2036958 | . ROTOR | 2 |
|
27 | 2036441 | . VALVE | 1 |
|
28 | 2037013 | . VALVE | 1 |
|
29 | 4179179 | . PIN |
|
|
31 | 3075855 | . LINK | 2 |
|
32 | 9724756 | . LEVER |
|
|
33 | 4179177 | . PIN | 4 |
|
34 | 4179176 | . PIN | 2 |
|
35 | 4146370 | . RING; RETAINING | 12 |
|
36 | 4200227 | . PIN | 2 |
|
41 | 1020401 | . HEAD | 1 |
|
42 | 3068226 | . PISTON; SERVO | 2 |
|
43 | 4330909 | . PIN | 2 |
|
44 | 4179838 | . SCREW; SET | 2 |
|
46 | 4355081 | . O-RING | 2 |
|
47 | 4330951 | . STOPPER | 2 |
|
50 | 4355080 | . O-RING | 2 |
|
51 | 4330950 | . STOPPER | 2 |
|
54 | 4180349 | . O-RING | 20 |
|
55 | M340825 | . BOLT; SOCKET | 16 |
|
56 | 4514388 | . WASHER; SPRING | 16 |
|
57 | 3071500 | . RING; BACK-UP | 1 |
|
58 | 4099290 | . PIN; SPRING | 2 |
|
59 | 4345061 | . O-RING | 1 |
|
60 | M341245 | . BOLT; SOCKET | 10 |
|
61 | M341290 | . BOLT; SOCKET | 2 |
|
64 | 4355012 | . SENSOR; PRES. | 2 |
|
64A | 4365826 | .. O-RING | 1 |
|
67 | 9134110 | . PLUG | 2 |
|
67A | 957366 | .. O-RING | 1 |
|
69 | 9151410 | . REGULATOR | 2 |
|
69 | (9152594) | . REGULATOR |
|
|
72 | 4515041 | . PIN; SPRING | 4 |
|
73 | 4343074 | . O-RING | 4 |
|
74 | 4348665 | . O-RING | 2 |
|
80 | 9134111 | . PLUG | 2 |
|
80A | 4509180 | .. O-RING | 1 |
|
No matter you need whole the hydraulic part for one pump or some spare part of the pump, pls feel free to contact us. If you are interested in, pls give us the machine number, pump number or part number, the better if you have old picture of the spare parts.
Supply Ability
Supply Ability: 500 Piece / Pieces per Month
Packaging & Delivery
Packaging Details: Standrad shipping package
Port: Guanggzhou
Lead Time:
Quantity(Pieces) | 1 - 1 | >1 |
Est. Time(days) | 2 | To be negotiated |
Our advantage
Ø Strong part number database.
If you can provide the right model and part number, we can supply the right product.
Ø Professional and experienced salesperson.
Our founder has been into this field for more than 7 years, with rich experiences.
Ø Strict and complete company rules.
We will try our best to meet customer’s delivery time. Before delivery, we must verify the part number or pictures of products one by one, to make sure that customers can receive high-quality and right-quantity goods.
Ø Good management system.
No matter how big or small order, as long as customers place the order, we will provide exporting service free for charge.
Ø Good service attitude.
If the customer has any questions about the product, In our receiving and knowing the situation, we will help the customer to solve the problem in the first place.As long as customers’ requirements are reasonable, we will endeavour to make them satisfied.
FAQ
1. Where's your company?
Our head office is in Guangzhou
2. Where is your sea port?
Huangpu
3. Where is your warrant time?
Nomally 3 months
4. Where will my order ship out ?
Orders have a processing time of 1-2 days business days,Once dispatched,an email will be sent containing the tracking information for the parcel
5. How can i pay?
You can pay for T/T, Western union ,etc
Company Details
Year Established:
2013
Total Annual:
20000-3000000
Employee Number:
50~93
Ecer Certification:
Verified Supplier
GZ Yuexiang Engineering Machinery Co., Ltd. GZ Yuexiang Engineering Machinery Co., Ltd, is a foreign trade company integrating development, sales, procurement, warehousing, transportation and service. Founded in September 2013, we have more than twelve years of experience in machinery t... GZ Yuexiang Engineering Machinery Co., Ltd. GZ Yuexiang Engineering Machinery Co., Ltd, is a foreign trade company integrating development, sales, procurement, warehousing, transportation and service. Founded in September 2013, we have more than twelve years of experience in machinery t...
Get in touch with us
Leave a Message, we will call you back quickly!