China factories

Chat Now Send Email
China factory - GZ Yuexiang Engineering Machinery Co., Ltd.

GZ Yuexiang Engineering Machinery Co., Ltd.

  • China,Guangzhou ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Hyundai Excavator R300 R300-9 travel reduction gear 39Q8-42100 Travel Gearbox
China Hyundai Excavator R300 R300-9 travel reduction gear 39Q8-42100 Travel Gearbox

  1. China Hyundai Excavator R300 R300-9 travel reduction gear 39Q8-42100 Travel Gearbox
  2. China Hyundai Excavator R300 R300-9 travel reduction gear 39Q8-42100 Travel Gearbox

Hyundai Excavator R300 R300-9 travel reduction gear 39Q8-42100 Travel Gearbox

  1. MOQ: 1PCS
  2. Price: Negotiated price
  3. Get Latest Price
Certifiion OEM
Payment Terms T/T, Western Union,Paypal
Supply Ability 600 pieces per month
Delivery Time 2-5days
Packaging Details Wooden
Warranty 6 Months
Product name Travel Gearbox
Type R300-9
Color Gray
Material Steel
Part number 39Q8-42100
Brand Hyundai
Quality Made in China
Brand Name Belparts
Model Number R300-9
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Certifiion OEM Payment Terms T/T, Western Union,Paypal
Supply Ability 600 pieces per month Delivery Time 2-5days
Packaging Details Wooden Warranty 6 Months
Product name Travel Gearbox Type R300-9
Color Gray Material Steel
Part number 39Q8-42100 Brand Hyundai
Quality Made in China Brand Name Belparts
Model Number R300-9 Place of Origin China
High Light 39Q8-42100R300-9 travel reduction gear

 

B

Hyundai Excavator R300 R300-9 travel reduction gear 39Q8-42100 Travel Gearbox

 

R300 R300-9 39Q8-42100 travel gearbox Description

 

Name or description of a commodity

Travel Gearbox

 

Production address

China

 

 

Part number 

39Q8-42100

Type

R300 R300-9

 

Minimum Order Quantity

1 pieces

 

Payment Method

T/T & Western Union & Paypal & Visa & MasterCard & e-Checking 

 

Shipping Time

Within 2 days after receiving The payment

 

Packaging

First layer is packed in plastic and the second in wooden s

 

 

 

R300 R300-9 39Q8-42100  travel gearbox Picture

 

 

 

Supply Ability

 

Supply Ability:       600 Piece/Pieces per Week

 

Packaging & Delivery

 

Packaging Details: First layer is packed in plastic and the second in wooden s

 

Port:                      Huangpu

 

Lead Time

Quantity(Pieces) 1 - 1 >1
Est. Time(days) 1 To be negotiated

 

 

 

 

The Exhibition 


 

Cautions of Swing Gearbox or Travel Gearbox Installation

 

1.Replace with new gear oil (the better gear oil, the longer the service life of the gearbox). Replace the gear oil after 7 days. (The operating time of the gear oil is changed every 1000 hours. Lubriing oil: operation time is changed every 1000 hours.


2.Before testing the machine, please confirm whether the gear oil has a sufficient amount according to the regulations, and please fill the hydraulic motor housing with power oil.


3.The load cannot be added quickly, and the operation should be fully operated under a light load.


4.Attention should be paid to the temperature of the housing during operation. The safe operating temperature is below atmospheric temperature + 60 °.


5.Check whether there is oil leakage at the connection between the motor and the reducer.


6.While installing and running, see if there is any abnormal noise.


7.Be sure to clean the tubing lines.

 

About us

 

1) We are experienced manufacturer of Travel Motor & Swing Motor Gears, gearboxes and gear accessories especially for excavator over 8 years.


2) Total more than 5000 kinds of products .


3) Professional technical team and production control system.


4) High quality products, fast delivery, good service and most competitive price.

 

 

FAQ

 

Q:Are you trading company or manufacturer?

A: We are factory.

 

Q: How long is your delivery time?

A: Generally it is 15-30 days if the goods are in stock. or it is over 30 days if the goods are not in stock, it is according to quantity.

 

Q: What is your terms of payment ?

A: 30% Advance payment by T/T after signing the contract.70% before delivery

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Year Established:

    2013

  • Total Annual:

    20000-3000000

  • Employee Number:

    50~93

  • Ecer Certification:

    Verified Supplier

GZ Yuexiang Engineering Machinery Co., Ltd.   GZ Yuexiang Engineering Machinery Co., Ltd, is a foreign trade company integrating development, sales, procurement, warehousing, transportation and service. Founded in September 2013, we have more than twelve years of experience in machinery t... GZ Yuexiang Engineering Machinery Co., Ltd.   GZ Yuexiang Engineering Machinery Co., Ltd, is a foreign trade company integrating development, sales, procurement, warehousing, transportation and service. Founded in September 2013, we have more than twelve years of experience in machinery t...

+ Read More

Get in touch with us

  • Reach Us
  • GZ Yuexiang Engineering Machinery Co., Ltd.
  • 429-432, No. 268 Zhongshan Avenue East, Huangpu District, Guangzhou,China
  • https://www.excavatorhydraulic-parts.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement