Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Your message must
be between 20-3,000 characters!
Submit Requirement
Thank You!
Your requirement has been sent. we will contact you quickly!
{"title":"EX210 Track Roller 9181373, Bottom Roller With Integral Forging For Hitachi","imgUrl":"https:\/\/img.chinax.com\/nimg\/d7\/9b\/33739b848c8361d175958908ade2-200x200-1\/ex210_track_roller_9181373_2c_bottom_roller_with_integral_forging_for_hitachi.jpg","attrs":{"Model Number":"EX210\/EX200-5\/ZX210\/ZX240","Brand Name":"ZTMC","Minimum Order Quantity":"1PCS","Delivery Time":"7-15Days"}}
{"title":"EC210 Idler Wheel 14520150, Track Idler with solid structure for consistent","imgUrl":"https:\/\/img.chinax.com\/nimg\/64\/82\/e218070621defcee83b6d646ae29-200x200-1\/ec210_idler_wheel_14520150_2c_track_idler_with_solid_structure_for_consistent_performance_in_daily_excavation_work.jpg","attrs":{"Warranty":"12 months","Model Number":"EC210D\/EC220D\/EC250","Supply Ability":"10000PCS\/Months","Quality":"Heat Treatment HRC 48-55"}}
{"title":"EC210 Lower Roller 14526131, Track Roller With HRC53-59 Hardness Matching","imgUrl":"https:\/\/img.chinax.com\/nimg\/07\/a4\/4b9aee7d75cea9a7cd1193756a3a-200x200-1\/ec210_lower_roller_14526131_2c_track_roller_with_hrc53_59_hardness_matching_original_ec210_undercarriage_size_standard.jpg","attrs":{"Model Number":"EC210D\/EC220D\/EC250","Featurse":"Durable","Brand Name":"ZTMC","Minimum Order Quantity":"1PCS"}}
{"title":"EC360 Front Idler 14520609, idler wheel with integral forging for EC360","imgUrl":"https:\/\/img.chinax.com\/nimg\/5f\/91\/91e2af519b1392abdd1b5053022e-200x200-1\/ec360_front_idler_14520609_2c_idler_wheel_with_integral_forging_for_ec360_excavator_undercarriage_daily_replacement.jpg","attrs":{"Payment Terms":"T\/T,L\/C","Price":"US$102-220","Packaging Details":"Standard Export Packaging","Certification":"ISO9001"}}
{"title":"R305 Front Idler 81N8-13010, Idler Wheel With Anti-deformation Structure For","imgUrl":"https:\/\/img.chinax.com\/nimg\/a9\/66\/7b2ab1dc7fc13bb34ab259d902b7-200x200-1\/r305_front_idler_81n8_13010_2c_idler_wheel_with_anti_deformation_structure_for_hyundai_r305_heavy_load_excavation_work.jpg","attrs":{"Surface Treatment":"Heat treated and coated for wear resistance","Payment Terms":"T\/T,L\/C","Place of Origin":"CHINA","Productname":"Excavator Front Idler"}}
{"title":"DH360LC Excavator Front Idler Air Tightness Tested Track Idler Wheel for Routine","imgUrl":"https:\/\/img.chinax.com\/nimg\/06\/ae\/c4685fb1f78f8951ef237fd2a200-200x200-1\/dh360lc_excavator_front_idler_air_tightness_tested_track_idler_wheel_for_routine_equipment_overhaul_and_part_replacement.jpg","attrs":{"Model Number":"DH360LC\u3001DH370LC\u3001DH380LC\u3001DH400LC","Delivery Time":"7-15Days","Minimum Order Quantity":"1PCS","Part Name":"Idler assay"}}
{"title":"Forged DX380 Front Track Idler, 35MnB Alloy Steel Undercarriage Idler for DX380","imgUrl":"https:\/\/img.chinax.com\/nimg\/45\/2f\/6eabd1d4466a51f6588ac687084b-200x200-1\/forged_dx380_front_track_idler_2c_35mnb_alloy_steel_undercarriage_idler_for_dx380_excavator_track_system_maintenance.jpg","attrs":{"Payment Terms":"T\/T,L\/C","Packaging Details":"Standard Export Packaging","Delivery Time":"7-15Days","Appliion":"Construction works"}}
EX210 Track Roller 9181373, Bottom Roller With Integral Forging For Hitachi EX210 Excavator Undercarriage Load Bearing Replacement
EX210 Track Roller 9181373, Bottom Roller With Integral Forging For EX210 Excavator Undercarriage Load Bearing Replacement
Product Overview
This 9181373 EX210 bottom track roller is a high-load undercarriage load-bearing component designed for EX210 series excavator track system replacement and daily construction maintenance. Different from common spliced, welded or cast track rollers circulating in the aftermarket, this lower roller adopts professional one-piece integral forging process. The integrated roller body features denser internal metal structure, better overall toughness and stronger anti-pressure capacity, perfectly coping with continuous track load, ground impact and long-hour vibration during daily excavation work. As a direct undercarriage manufacturer, we implement full-process forging inspection to eliminate internal structural defects and guarantee stable long-term load-bearing performance.
Seamless body, no welding joints, high compression resistance
Working Scenarios
Earthwork excavation, road construction, general muddy and uneven sites
Differentiated Integral Forging Quality Control
Most low-cost bottom rollers adopt split welding or ordinary casting craft, which leave inherent welding seams and internal pores. These hidden defects will expand gradually under long-term chassis load and vibration, causing roller cracking, oil leakage and premature failure. Our 9181373 track roller adopts complete integral forging forming without any splicing or welding. Every finished roller passes ultrasonic nondestructive testing to check internal compactness, ensuring no hidden structural flaws inside the roller body. This forging-focused quality control solves the core durability problem of assembled cast rollers for daily construction load-bearing work.
Core Product Advantages
Seamless Integral Forged Structure: One-piece forming removes welding seam weakness points, effectively resisting heavy pressure and vibration impact without roller cracking or deformation.
Higher Internal Structural Density: Forged material owns tighter metal texture than cast parts, improving overall fatigue resistance for long-time continuous operation.
Stable Sealing Performance: Integrated roller body fits internal oil seal structure better, reducing oil leakage risk and extending service life of internal rotating parts.
Full Standard Size Compliance: Strictly produced per 9181373 official dimension standards, supporting direct bolt-on replacement without field modification.
Packaging & Factory Service
This integral forged bottom roller is perfectly matched for EX210 series excavator undercarriage load-bearing replacement and routine equipment overhaul. Each roller is protected with anti-rust oil and waterproof film, then packed with thickened wooden boxes to avoid collision damage during long-distance sea transportation. We support forging process inspection records, sample testing and bulk customized orders, providing high-structure-durability undercarriage spare parts for global equipment wholesalers and repair workshops.
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer,Exporter
Year Established:
2015
Total Annual:
5000000-8000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Nanan Zhongte Construction Machinery Factory is located in Quanzhou, Fujian Province, China — a city recognized by UNESCO as the starting point of the ancient Maritime Silk Road and also a vibrant metropolis with an economic output exceeding one trillion yuan. As a large enterprise specializin... Nanan Zhongte Construction Machinery Factory is located in Quanzhou, Fujian Province, China — a city recognized by UNESCO as the starting point of the ancient Maritime Silk Road and also a vibrant metropolis with an economic output exceeding one trillion yuan. As a large enterprise specializin...