| Payment Terms | T/T |
| Supply Ability | 5 Piece/Pieces per Month |
| Delivery Time | 20-30 work day |
| Packaging Details | Bubble bag packaging |
| Application | Excavator |
| Part name | Boom/Arm/Bucket Cylinder |
| Material | Q355D/Q690D |
| Color | as customer requires |
| Warranty | 6 Months |
| Condition | 100%new |
| Quality | High-Quality |
| MOQ | 1 PCS |
| Packing | Standard Packing |
| After-sales service provided | Online Video support |
| Brand Name | Zhonghe |
| Certification | CE |
| Place of Origin | Guangdong, China |
| Model Number | CLB001 |
View Detail Information
Explore similar products
Excavator Extension Demolition Long Reach Boom and Arm for 40T Class Excavators
Excavator 16m Demolition Boom High Reach Arm and Boom Demolition Arm for 20-25T
Excavator Demolition Boom High Reach Arm and Boom 23-24m Long Attachment for
High Reach Demolition Boom for Excavator with Shear
Product Specification
| Payment Terms | T/T | Supply Ability | 5 Piece/Pieces per Month |
| Delivery Time | 20-30 work day | Packaging Details | Bubble bag packaging |
| Application | Excavator | Part name | Boom/Arm/Bucket Cylinder |
| Material | Q355D/Q690D | Color | as customer requires |
| Warranty | 6 Months | Condition | 100%new |
| Quality | High-Quality | MOQ | 1 PCS |
| Packing | Standard Packing | After-sales service provided | Online Video support |
| Brand Name | Zhonghe | Certification | CE |
| Place of Origin | Guangdong, China | Model Number | CLB001 |
| High Light | 16-20 meters demolition long boom ,three-section excavator boom ZX250 ,demolition boom for construction machine | ||
![]()
16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine![]()
![]()
![]()
![]()
![]()
Specification
![]()
| 1. Boom, arm and middle arm | ||
| 2. Linkage assembly*1 kit | ||
| 3. Bucket cylinder (22 ton type)*1 | ||
| 4. High pressure hoses*18 | ||
| 5. Pins*8 | ||
| 6. Stop valves*10 | ||
| 7. Lubrication hoses*5 | ||
| 8. Counterweight optional |
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
The first system is the technical design drawing review mechanism,
The second system is the semi-finished product review mechanism,
(each process has a detection testing for the previous process)
The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether
the installation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure
that is qualified before shipping.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Bubble bag packaging for most products, Wooden case for little products, like buckets
![]()
![]()
![]()
![]()
![]()
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2018
Total Annual:
30000000-90000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Introduction Kaiping Zhonghe Machinery is a leading manufacturer specializing in high-quality excavator arms, booms, and attachments. With years of expertise in engineering and production, we provide durable, high-performance solutions for construction, demolition, mining, and material han... Introduction Kaiping Zhonghe Machinery is a leading manufacturer specializing in high-quality excavator arms, booms, and attachments. With years of expertise in engineering and production, we provide durable, high-performance solutions for construction, demolition, mining, and material han...
Get in touch with us
Leave a Message, we will call you back quickly!