China factories

China factory - Guangzhou Quanhang Construction Machinery Co., Ltd.

Guangzhou Quanhang Construction Machinery Co., Ltd.

  • China,Guangzhou
  • Site Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Excavator Clutch Plate Fit Komatsu PC200-7 Replacement Parts Special Clutch
China Excavator Clutch Plate Fit Komatsu PC200-7 Replacement Parts Special Clutch

  1. China Excavator Clutch Plate Fit Komatsu PC200-7 Replacement Parts Special Clutch
  2. China Excavator Clutch Plate Fit Komatsu PC200-7 Replacement Parts Special Clutch
  3. China Excavator Clutch Plate Fit Komatsu PC200-7 Replacement Parts Special Clutch

Excavator Clutch Plate Fit Komatsu PC200-7 Replacement Parts Special Clutch

  1. MOQ: 50PCS
  2. Price: $100.00 - $300.00/pieces
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 10000 Piece/Pieces per
Delivery Time 5-8DAY
Packaging Details Carton packaging
Baseoiltype Mineral / Synthetic Blend
Application Engine lubrication,
Compatibility Compatible with seals and metals used in engineering machinery
Model Number PC200-7/8
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 10000 Piece/Pieces per
Delivery Time 5-8DAY Packaging Details Carton packaging
Baseoiltype Mineral / Synthetic Blend Application Engine lubrication,
Compatibility Compatible with seals and metals used in engineering machinery Model Number PC200-7/8
Place of Origin China

Premium Clutch Disc Specially Designed for Komatsu PC200-7 Excavator, Original Equipment Matching, Wear‑resistant and Durable, Stable Power Output
Core Function | The Core Hub of the Excavator's Power System
1.Precise Power Control: As a core component of the travel/swing motor and main pump coupling for Komatsu PC200-7, it achieves seamless engagement and disconnection of power between the engine and the transmission system through friction, ensuring stable power transmission throughout the equipment's startup, gear shifting and operation without slippage or power interruption.
2.Shock absorption and buffer protection for the whole machine: Effectively absorb impact loads from the transmission system, reduce rigid collisions between gears, significantly lower equipment operation vibration, comprehensively protect core components of the transmission system, and effectively extend the service life of the entire machine.
3.Safety Braking to Prevent Out-of-Control: Cooperating with the hydraulic system to achieve precise braking of the traveling and slewing mechanisms, stably control the operating posture of the equipment, completely eliminate problems such as vehicle sliding and slewing out of control, and provide protection for construction safety.
4.More reliable overload protection: When the equipment load exceeds the rated value, controllable slipping is adopted to prevent the transmission system components from being damaged due to overload, greatly improving the overall operational reliability of the equipment and easily adapting to complex heavy-duty working conditions.

High-quality materials|Every material used meets the original factory standards
1.Highly Wear-Resistant Friction Layer: The main body is made of high-quality paper-based composite material / copper-based powder metallurgy material, which is perfectly suitable for the wet clutch working environment of Komatsu PC200-7. It features an ultra-high friction coefficient, exceptional wear resistance, high temperature resistance and thermal fade resistance, fully complies with OEM original factory specifications, and has a service life far exceeding that of ordinary aftermarket parts.
2.High-strength steel base frame: Made by stamping high-strength alloy steel, it has been comprehensively improved in rigidity and deformation resistance through precise heat treatment processes, ensuring the installation fit and torque bearing capacity of the clutch plate, eliminating deformation and fracture during high-speed operation, and providing greater stability for long-term use.
3.Precision Surface Craftsmanship: The friction layer surface adopts a professional grooving/texturing design, which greatly optimizes oil flow and heat dissipation performance, reduces oil film resistance in wet operating environments, significantly improves clutch response speed and power transmission efficiency, and enables more efficient operation.


Installation | Professional and Standardized, One Proper Installation for Longer Service Life
1.Pre-installation Inspection: Ensure the new clutch plate model is fully compatible with Komatsu PC200-7. Check that the friction plate surface is free from damage, oil contamination, and deformation, and that the steel plate is free from warping and cracks. Simultaneously inspect the wear of mating components such as the housing, splines, and seals, and replace damaged parts promptly to avoid secondary failures.
2.Cleaning and Pre-treatment: Thoroughly clean all mating components such as the installation cavity, spline shaft, and steel plates, completely remove metal chips, oil stains, and impurities, ensure all contact surfaces are clean and dry, and prevent abnormal wear of the clutch plates caused by the ingress of impurities.
3.Pre-soaking treatment: Wet clutch plates must be soaked in Komatsu genuine specified hydraulic oil/transmission oil for at least 2 hours to ensure the friction layer fully absorbs oil, completely avoiding burnt plates and abnormal wear caused by dry starting after installation.
4.Standard Installation Steps: Install friction plates and steel plates alternately in strict accordance with the original stacking sequence, ensuring each clutch plate is fully aligned with the spline and inserted smoothly; forced hammering during installation is prohibited. After installation, check that the stacking height and axial clearance of the clutch plates fully comply with the original technical specifications, and tighten all fasteners to the specified torque.
5.Break-in and Commissioning Procedure: After installation is complete, first conduct a no-load break-in test, gradually increase the rotational speed and load, check whether the clutch engages and disengages smoothly without slipping or abnormal noise, and only put it into full-load operation after confirming that all parameters are completely normal.

Application Scenarios | Adaptable to All Working Conditions, Exclusive for Komatsu PC200-7
✅ Exclusive Model Adaptation: 1:1 exclusive adaptation for the Komatsu PC200-7 medium-sized crawler excavator. It can universally match the clutch mechanisms of all parts of the same model, such as the travel motor, swing motor, and main pump coupling, and can be directly installed without modification.
✅ Full-scenario Operation Adaptation: Suitable for all-scenario operations of the PC200-7 excavator, including earthwork engineering, mining, municipal construction, road construction, farmland and water conservancy, and can easily meet the complex working condition requirements such as heavy load, continuous operation, and high-frequency start-stop.
✅ Full-scenario Replacement & Adaptation: It can be perfectly used for the worn replacement, fault repair and upgrade replacement of original clutch discs, as well as supporting replacement during equipment overhaul and preventive maintenance, comprehensively ensuring the stable and efficient operation of the equipment's power system.

 

Category Detailed Description
I. Core Functions 1. Power Transmission and Interruption: As a core component of the travel/swing motor and main pump coupling of Komatsu PC200-7 excavator, it realizes the engagement and interruption of power between the engine and the transmission system through friction force, ensuring stable power transmission during equipment starting, gear shifting and operation.
 
2. Buffering and Damping: It absorbs the impact load of the transmission system, reduces the hard collision between gears, lowers the vibration during equipment operation, protects the core components of the transmission system, and extends the service life of the whole machine.
 
3. Braking and Position Limiting: Cooperates with the hydraulic system to realize precise braking of the travel/swing mechanism, stably controls the operation posture of the equipment, prevents vehicle slipping and swing runaway, and fully guarantees construction safety.
 
4. Overload Protection: When the equipment load exceeds the rated value, it avoids damage to the transmission system components caused by overload through controllable slipping, greatly improving the overall operation reliability and working condition adaptability of the equipment.
II. Material Description 1. Main Friction Layer: Made of high-quality paper-based composite material/copper-based powder metallurgy material, it perfectly adapts to the wet clutch working environment of Komatsu PC200-7, has the characteristics of high friction coefficient, super wear resistance, high temperature resistance and thermal fading resistance, and fully complies with OEM original factory specifications.
 
2. Steel-based Skeleton: Formed by stamping high-strength alloy steel, it improves the rigidity and deformation resistance through precision heat treatment process, ensures the installation fit and torque bearing capacity of the clutch plate, and eliminates the problems of deformation and fracture under high-speed operation.
 
3. Surface Technology: The surface of the friction layer adopts precision slotting/weaving design, which optimizes the oil circulation and heat dissipation performance, reduces the oil film resistance in the wet working environment, and greatly improves the clutch response speed and power transmission efficiency.
III. Usage and Installation Specifications 1. Pre-installation Inspection: Confirm that the model of the new clutch plate is completely matched with Komatsu PC200-7, check that the surface of the friction plate is free of damage, oil contamination and deformation, and the steel plate is free of warping and cracks; simultaneously check the wear condition of supporting components such as the housing, spline and seals, and replace the damaged components.
 
2. Cleaning Pretreatment: Thoroughly clean all matching components such as the installation cavity, spline shaft and steel plate, completely remove metal debris, oil contamination and impurities, ensure that all contact surfaces are clean and dry, and avoid abnormal wear caused by impurities entering.
 
3. Pre-soaking Treatment: The wet clutch plate must be soaked in the hydraulic oil/transmission oil specified by Komatsu original factory for at least 2 hours to ensure that the friction layer is fully saturated with oil, and avoid the problems of plate burning and abnormal wear caused by dry start after installation.
 
4. Standard Installation: Strictly follow the original factory stacking sequence, alternately install the friction plates and steel plates, ensure that each clutch plate is completely aligned with the spline and smoothly put in place, and prohibit forced knocking installation; after installation, check that the stacking height and axial clearance of the clutch plates meet the original factory technical parameters, and fasten all fasteners with the specified torque.
 
5. Running-in and Debugging: After the installation is completed, carry out no-load running-in test, gradually increase the speed and load, check whether the clutch engagement/disengagement is smooth without slipping and abnormal noise, and put it into full-load operation after confirming that all parameters are normal.
IV. Applicable Purposes and Scenarios 1. Compatible Models: Exclusively compatible with Komatsu PC200-7 medium-sized crawler excavator, and can be universally matched with the clutch mechanisms of the travel motor, swing motor, main pump coupling and other parts of the same model.
 
2. Operation Scenarios: Suitable for full-scenario operations of PC200-7 excavators such as earthwork engineering, mining, municipal construction, road construction, farmland and water conservancy, and can easily meet the needs of complex working conditions such as heavy load, continuous operation and high-frequency start-stop.
 
3. Replacement Scenarios: It can be used for wear replacement, fault maintenance and upgrade replacement of the original factory clutch plate, and also for supporting replacement during equipment overhaul and preventive maintenance, to fully guarantee the stable and efficient operation of the equipment power system.











 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1998

  • Total Annual:

    5000000-10000000

  • Employee Number:

    50~100

  • Ecer Certification:

    Site Member

The company specializes in the development, manufacturing (casting, forging, heat treatment) and sale of spare parts of construction machinery such as Front idler, Sprocket, Track roller (bottom roller), Carrier roller (top roller), Track link, Idler yoke, Cutting edge and end bit, Track shoe, Tight... The company specializes in the development, manufacturing (casting, forging, heat treatment) and sale of spare parts of construction machinery such as Front idler, Sprocket, Track roller (bottom roller), Carrier roller (top roller), Track link, Idler yoke, Cutting edge and end bit, Track shoe, Tight...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Quanhang Construction Machinery Co., Ltd.
  • 1027-1039, International Machinery City 10th Street, No. 36 Zhuji Road, Tianhe District, Guangzhou
  • https://www.excavatorundercarriage-parts.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement