| Payment Terms | T/T |
| Packaging Details | Pallet |
| Length | Standard sizes available |
| Finish | Heat treated and hardened |
| Features | Durable |
| Size | Standard Size |
| Specification | As customer requestment |
| Color | Black or natural metal |
| Package | Export wooden pallet |
| Related Machine Brand | , Kmts, Hitachi, Volvo, Hyundai, Jcb, |
| Machinery Test Report | Provided |
| Model Number | ZAX200-3G |
| Place of Origin | China |
View Detail Information
Explore similar products
Custom Track Link Komatsu PC600 Aftermarket Excavator Tracks
Customized Excavator Track Link D85 35MnB Steel Adjustable
High Strength Undercarriage Track Link PC200-8 For Komatsu Excavator
Heavy Duty Digger Excavator Track Link Chains D65E-12 Customized
Product Specification
| Payment Terms | T/T | Packaging Details | Pallet |
| Length | Standard sizes available | Finish | Heat treated and hardened |
| Features | Durable | Size | Standard Size |
| Specification | As customer requestment | Color | Black or natural metal |
| Package | Export wooden pallet | Related Machine Brand | , Kmts, Hitachi, Volvo, Hyundai, Jcb, |
| Machinery Test Report | Provided | Model Number | ZAX200-3G |
| Place of Origin | China |
Hitachi ZAX200-3G Tension Cylinder Assembly
I. Core Selling Points
1.Precise model adaptation: Developed specifically for the Hitachi ZAX200-3G excavator, with hole positions, stroke and dimensions matching the original parts in a 1:1 ratio. No secondary processing is required, installation is hassle-free, and direct replacement is achievable.
2.Forged from high-strength material: The cylinder body is integrally forged from 45CrMo high-strength wear-resistant alloy steel, with no weak welding points. It can withstand heavy-duty impacts and eliminate risks of cracking and deformation.
3.Quenched Spring Process: The matched tension springs undergo high-temperature quenching and tempering plus blackening anti-rust surface treatment, achieving both qualified hardness and toughness, featuring fatigue resistance and corrosion resistance, with no rebound failure even after long-term compression.
4.Precision Sealing and Leak Prevention: The inner wall of the oil cylinder adopts high-precision honing technology, paired with an imported-grade oil seal and dust seal combination, achieving zero leakage under high-pressure working conditions, with no pressure loss or jamming during long-term use.
5.Strict factory inspection: Each assembly undergoes 100,000 fatigue tests plus high-pressure sealing tests, making it suitable for harsh working conditions such as mining, earthmoving and infrastructure construction, with durability far exceeding that of ordinary accessories.
| Item | Details |
|---|---|
| Compatible Model | Hitachi ZAX200-3G Excavator |
| Product Name | Track Adjuster Cylinder Assembly (with recoil spring, adjusting nut, dust cover) |
| Cylinder Material | 45CrMo high-strength wear-resistant alloy steel (one-piece forged) |
| Spring Process | High-temperature quenching & tempering + black oxide anti-rust treatment |
| Cylinder Process | Precision honed inner wall + anti-rust surface treatment |
| Sealing Components | Imported NBR oil seal + PU dust ring |
| Working Conditions | Mining, earthmoving, infrastructure, heavy-duty and harsh environments |
| Installation | Direct replacement, no modification needed |
| Functions | Track tension adjustment, impact absorption, undercarriage protection |
| Warranty | 6 months warranty against manufacturing defects (excluding human damage) |
III. Core Functions of the Product
The tension cylinder assembly is the "core adjustment and protection component" of the excavator's traveling chassis, which directly affects the stability of the track and the service life of the chassis.
1.Precisely adjust the track tension: Adjust the track tightness through the extension and retraction of the oil cylinder to prevent derailment caused by an overly loose track and accelerated wear of the track links and track rollers due to excessive tightness, significantly reducing the chassis wear rate.
2.Buffer walking impact load: The matched tension spring can absorb the impact force generated during the walking, steering and obstacle crossing of the excavator, preventing hard impact from being directly transmitted to the traveling mechanism and prolonging the service life of the drive wheel and idler.
3.Compensate for natural wear of the track: As the track pins, bushings and links wear, the track will gradually lengthen. The tension cylinder can maintain a proper tension state through stroke compensation, avoiding potential safety hazards caused by slack tracks.
4.Maintaining the stability of the traveling mechanism: Stable tension ensures that the track remains in proper meshing with the drive wheel and idler at all times, reducing tooth jumping and uneven wear, enabling smoother travel movements, and lowering fuel consumption and failure rates.
IV. Installation and Operation Instructions
1.Preparation before installation
Clean up sediment, mud and rust from the idler mounting seat and the track frame, ensure the mounting surface is flat and free of burrs, so as to prevent uneven stress after installation from causing deformation of the oil cylinder.
Check whether the seals and springs of the new cylinder assembly are intact, confirm that all accessories (adjusting nuts, dust caps, etc.) are complete and free from transport damage.
2.Installation Steps
1.Place the excavator track on a solid support, slowly loosen the grease nipple of the original tensioning cylinder, release the grease inside the track, and slacken the track to a detachable state.
2.Remove the old oil cylinder assembly, clean the mounting holes, align the new oil cylinder with the idler, and place it steadily into the track frame.
3.Tighten the fixing bolts evenly to avoid deformation of the cylinder barrel caused by unilateral stress; the bolt torque shall refer to the original manufacturer's standards.
4.After installation, slowly inject grease through the grease nipple to adjust the track tension.
3. Tension Adjustment Standard
1.Under no-load conditions on level ground, the track sag should be controlled at 20-30mm (i.e., the ground clearance at the middle of the track).
2.When adjusting, grease should be added slowly to prevent cracking of the cylinder barrel or damage to the oil seal caused by excessive pressure; if over-adjusted, the grease can be slowly released through the grease fitting for adjustment.
4.Daily Maintenance and Precautions
1.Regularly inspect the oil cylinder surface for oil leakage and check whether the spring is deformed or broken. Replace the oil seal promptly if leakage is found to prevent sediment from entering the oil cylinder and causing wear.
2.After each replacement of track pin bushings and track links, it is necessary to re-inspect and adjust the track tension to avoid abnormal tension caused by component wear.
3.Avoid prolonged operation in an overtightened state, as this will accelerate the wear of the track rollers, idlers and tracks, while increasing the load on the travel motor.
![]()
![]()
Company Details
Business Type:
Manufacturer
Year Established:
1998
Total Annual:
5000000-10000000
Employee Number:
50~100
Ecer Certification:
Site Member
The company specializes in the development, manufacturing (casting, forging, heat treatment) and sale of spare parts of construction machinery such as Front idler, Sprocket, Track roller (bottom roller), Carrier roller (top roller), Track link, Idler yoke, Cutting edge and end bit, Track shoe, Tight... The company specializes in the development, manufacturing (casting, forging, heat treatment) and sale of spare parts of construction machinery such as Front idler, Sprocket, Track roller (bottom roller), Carrier roller (top roller), Track link, Idler yoke, Cutting edge and end bit, Track shoe, Tight...
Get in touch with us
Leave a Message, we will call you back quickly!