| Storey Option | Single Storey |
| Payment Terms | T/T |
| Electrical System | Pre Installed Or Optional Wiring Lighting Sockets Distribution Box Preparation |
| Product Type | Foldable House |
| Assembly Method | Foldable Structure Quick Deployment |
| Plumbing System | Pre Installed Or Optional Water Supply Drainage Bathroom Kitchen Readiness |
| Structure Frame | Galvanized Steel Structure Frame |
| Wall System | Sandwich Panel Optional Insulated Sandwich Panel Optional |
| Size Options | Customizable |
| Certification | CE |
| Place of Origin | Guangdong |
| Brand Name | SUNHOUSE |
View Detail Information
Explore similar products
Collapsible Prefab House for Long-Term Living Foldable Steel Frame Residential
Fast Deployment Folding Container Houses Quick Install For Temporary Housing
Rapid Setup Foldable Container House Single Storey Temporary Container Homes
Pop Up Ready Foldable House Quick Deployment Compact Modular Folding Homes
Product Specification
| Storey Option | Single Storey | Payment Terms | T/T |
| Electrical System | Pre Installed Or Optional Wiring Lighting Sockets Distribution Box Preparation | Product Type | Foldable House |
| Assembly Method | Foldable Structure Quick Deployment | Plumbing System | Pre Installed Or Optional Water Supply Drainage Bathroom Kitchen Readiness |
| Structure Frame | Galvanized Steel Structure Frame | Wall System | Sandwich Panel Optional Insulated Sandwich Panel Optional |
| Size Options | Customizable | Certification | CE |
| Place of Origin | Guangdong | Brand Name | SUNHOUSE |
| High Light | foldable house quick deployment ,folding buildings portable design ,foldable house time-saving setup | ||
A foldable house arrives on site already built and folds open into a usable building. Walls, roof and floor are hinged and pre-finished at the factory, so the on-site operation is closer to unfolding than to construction. It is the fastest route from delivery to occupancy in the container housing range.
Panels and sections are hinged to the structural frame and locked in the folded position for transport. When the unit is positioned, the hinges allow the sections to swing out and the floor to drop. Because the walls and roof are already finished and insulated, and the electrical installation is already run, the unit becomes weathertight as soon as the joints are locked and sealed.
| Format | Typical On-Site Time | Skills Required |
|---|---|---|
| Foldable house | Hours, with lifting equipment | Basic — guided unfolding and locking |
| Expandable unit | Hours, with lifting equipment | Basic |
| Flat pack unit | One to two days per module | Assembly crew with hand tools |
| Site-built structure | Weeks to months | Trades and supervision |
| Item | Typical Specification |
|---|---|
| Folded footprint | Container-compatible; confirm per model |
| Structure | Galvanised steel frame with hinged wall and roof sections |
| Panels | Pre-finished sandwich panels, insulated to the specified climate |
| Floor | Finished floor board on a folding floor frame |
| Electrical | Pre-installed wiring with external connection point |
| Openings | Factory-fitted doors and windows |
| Optional fit-out | Bathroom, kitchenette, air conditioning provision |
Fold joints are the critical detail. Every hinge line is a potential water path. Check the seal design and the condition of the seals on delivery, and re-inspect after each time the unit is moved.
Typically within hours of delivery, provided the base is prepared and services are available at the site.
A small team with lifting equipment is normally sufficient; the number depends on unit size and weight.
Yes. That repeatability is one of its main advantages, provided the frame and seals are inspected after each move.
It is engineered for transport loads, which are demanding. Performance in service depends on the specification of frame, panels and seals.
A correctly designed and maintained seal should not leak. Inspect seal condition on delivery and after each relocation.
Tell us how quickly the building must be operational and where it will be placed; we will recommend a folding model and confirm the delivery schedule.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2005
Employee Number:
500~1000
Ecer Certification:
Verified Supplier
Foshan Huiju Decoration Material Co. Ltd. is situated in Gaoming District, Foshan City, Guangdong Province, with its roots deeply embedded in the Guangdong-Hong Kong-Macao Greater Bay Area. As one of the top 10 manufacturers of prefabricated and integrated houses in Guangdong Province, we are a mult... Foshan Huiju Decoration Material Co. Ltd. is situated in Gaoming District, Foshan City, Guangdong Province, with its roots deeply embedded in the Guangdong-Hong Kong-Macao Greater Bay Area. As one of the top 10 manufacturers of prefabricated and integrated houses in Guangdong Province, we are a mult...
Get in touch with us
Leave a Message, we will call you back quickly!