China factories

Chat Now Send Email
China factory - Fengcheng Fire Turbocharger Manufacturing Co., Ltd

Fengcheng Fire Turbocharger Manufacturing Co., Ltd

  • China ,Liaoning
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China C14-194-01 Turbo Bearing Housing TCR-07.01 516763 Kamaz Series with YaMZ D245.7
China C14-194-01 Turbo Bearing Housing TCR-07.01 516763 Kamaz Series with YaMZ D245.7

  1. China C14-194-01 Turbo Bearing Housing TCR-07.01 516763 Kamaz Series with YaMZ D245.7
  2. China C14-194-01 Turbo Bearing Housing TCR-07.01 516763 Kamaz Series with YaMZ D245.7
  3. China C14-194-01 Turbo Bearing Housing TCR-07.01 516763 Kamaz Series with YaMZ D245.7
  4. China C14-194-01 Turbo Bearing Housing TCR-07.01 516763 Kamaz Series with YaMZ D245.7

C14-194-01 Turbo Bearing Housing TCR-07.01 516763 Kamaz Series with YaMZ D245.7

  1. MOQ: 10 Pieces
  2. Price: Welcome to inquiry
  3. Get Latest Price
Payment Terms T/T, Western Union
Supply Ability 20000pcs per month
Delivery Time 5-35 working days
Packaging Details Carton: 1. Fire Brand Packaging; 2. Neutral Packaging; 3. Customized Packaging (please contact our sales)
Turbo Bearing Housing model C14-194-01
Part No. 516763
OE No. TCR-07.01
Bearing Housing Materials Ductile iron HT200
Brand Name FIRE
Model Number C14-194-01
Certification CE, ISO
Place of Origin Fengcheng, China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union Supply Ability 20000pcs per month
Delivery Time 5-35 working days Packaging Details Carton: 1. Fire Brand Packaging; 2. Neutral Packaging; 3. Customized Packaging (please contact our sales)
Turbo Bearing Housing model C14-194-01 Part No. 516763
OE No. TCR-07.01 Bearing Housing Materials Ductile iron HT200
Brand Name FIRE Model Number C14-194-01
Certification CE, ISO Place of Origin Fengcheng, China
High Light Turbo Bearing Housing for Kamaz SeriesBearing Housing for YaMZ D245.7 EngineTCR-07.01 Turbo Bearing Housing

1985- Kamaz Series C14-194-01 Turbo Bearing Housing

 

Specifications:

Turbo model: C14-194-01
Part No.: 516763
OE No.: TCR-07.01
Bearing House Material: Ductile iron HT200
Year: 1985-
Packaging:

1. Fire Brand Packaging

2. Neutral Packaging

3. Customized Packaging

 

It can replace:

2708601701      

 

Applications: 1985- Kamaz Series with YaMZ D245.7,D245.9,1407B5.32 Engine

 

Other models:

Turbo Model Part No. OE No. Engine Application
C13-295-01   53443-1118010-10 YaMZ 53443-20/23 2012- Kamaz Tractor
C14-127-01 C14-127-01 C14-127-01 ZIL D245.12S 1984- Kamaz ZIL,MTZ,and RZ specialized machinery

 

Turbocharger Knowledge Hub 

 

How does a turbocharger work, and what is its function?

  • Simply put, it acts as the engine's "lungs." It recycles engine exhaust gases to spin a turbine, forcing dense, compressed air into the cylinders. This ensures every drop of fuel combusts fully, maximizing the vehicle's acceleration and towing capacity.

 

Why are modern cars and trucks increasingly relying on turbos?

  • Because it solves the dilemma between power and fuel efficiency. Without increasing the engine's physical size, a quality turbo can boost power output by 30-40% while saving 10-20% on fuel. This reduces the carbon footprint and aligns perfectly with strict global emission standards.

 

As a wholesaler, how should you evaluate the quality of a turbocharger?

  • The key lies in heat resistance and dynamic balancing precision. Turbos operate at extreme speeds (over 200,000 RPM) and scorching temperatures. Our products use aerospace-grade heat-resistant alloys, and every single unit passes a high-speed VSR balancing calibration before leaving the factory. This ensures zero oil leakage, no abnormal noise, and ultimate durability under extreme conditions—effectively lowering your return rates and protecting your profit margins.

 

What is "Turbo Lag," and how do premium products minimize it?

  • "Turbo lag" is the slight delay between pressing the accelerator and feeling the power surge. To minimize this, our turbos feature aerodynamically optimized designs and lightweight billet compressor wheels. This ensures faster spool-up times, providing end-users with a smoother, more responsive driving experience.

 

What is the most common cause of turbo failure, and how can it be prevented?

  • Over 80% of turbo failures are not due to manufacturing defects, but rather "oil starvation/contamination" or "foreign object damage (FOD)." The turbo's rotor relies entirely on engine oil for lubrication and cooling. Therefore, we highly recommend advising your mechanics to always replace the oil and filter, and clean the intake pipes when installing a new turbo. Educating your clients on this will drastically reduce unnecessary warranty claims.

 












 

FAQ:

Q: How long is the delivery time?

A: The normal production time is 25-35 days. If item is in stock, it can be sent within 5-7 days.

 

Q: What is the MOQ?

A: Different models have different MOQ. Please contact the salesperson for details.

 

Q: What are the trade terms?

A: Our trade term is EX-Work. We are responsible for delivering the goods to the customer's designated warehouse within China (Except for Ports where fees are charged).

 

Q: What are your terms of payment?

A: 40% deposit in advance, 60% balance before delivery.

 

Q: What is the materials you used?

A: We use the best materials K418.

 

Q: How long is the warranty period?

A: The warranty period is one year.

 

Q: What is the package used?

A: We only offer the Fire brand package and neutral package; If customized box needed, you have to communicate with the salesperson for the quantity and cost.

 

Tag: C14-194-01 Turbo Bearing Housing, TCR-07.01, 1985- Kamaz Series.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2001

  • Total Annual:

    100-1000

  • Employee Number:

    10~20

  • Ecer Certification:

    Verified Supplier

FIRE was born out of passion - focusing on turbocharger production from 2001 to now. The sales of high-quality turbochargers have exceeded 1,500,000pcs. With advanced production technology, modern management and quality control, a large amount of technical research and development investment, the an... FIRE was born out of passion - focusing on turbocharger production from 2001 to now. The sales of high-quality turbochargers have exceeded 1,500,000pcs. With advanced production technology, modern management and quality control, a large amount of technical research and development investment, the an...

+ Read More

Get in touch with us

  • Reach Us
  • Fengcheng Fire Turbocharger Manufacturing Co., Ltd
  • Group 4, Beishan Village, Fenghuang District, Fengcheng City, Liaoning Province
  • https://www.fire-turbo.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement