China factories

China factory - GUANGDONG BTO NEW MATERIAL CO.,LTD.

GUANGDONG BTO NEW MATERIAL CO.,LTD.

  • China,Dongguan ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction
China Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction

  1. China Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction
  2. China Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction

Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction

  1. MOQ: 1 rolls (A4 size free sample)
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms T/T
Supply Ability 10000 rolls per day
Delivery Time 1week
Packaging Details 25rolls/pallet
Description Quality Cover Floors Cardboard
Performance Price of Paint Protective Board
Specifications 0.82*36.6m
Material Shield Masonite Floor Protection Manufactures
Application Building decoration and construction
Purpose Prevent construction damage and delay
Brand Name BTO
Model Number CBL-05532120
Certification FSC, SGS
Place of Origin DongGuan, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 10000 rolls per day
Delivery Time 1week Packaging Details 25rolls/pallet
Description Quality Cover Floors Cardboard Performance Price of Paint Protective Board
Specifications 0.82*36.6m Material Shield Masonite Floor Protection Manufactures
Application Building decoration and construction Purpose Prevent construction damage and delay
Brand Name BTO Model Number CBL-05532120
Certification FSC, SGS Place of Origin DongGuan, China
High Light 120inches Floor Protection Paper Roll ,Masonite Floor Protection Paper Roll ,0.82m Flooring Protection Paper

Builder'S 32''*120'Dry Floor Paper Sheath, Builder'S Floor Protection Paper Roll

 

The temporary floor protective cardboard can not only shield low-level traffic, but also provide a barrier for many materials commonly used in construction projects. Water, paint and external debris, such as mud and dirt, are away from the existing floor and reduce a lot of time to clean up after a project is completed. The combination of anti-skid design and spill protection technology provides an effective solution for trading paper customers to minimize the impact on existing surfaces that require high requirements for construction projects.

 

 

 

This floor protection paper is large enough for several items, flexible and easy to use. He is an excellent helper for floor protection, which helps to protect the floor and surface from small paint spills and splashes. It is also a major product in the paint and construction industries, providing temporary floor protection.

 

 

The main features are durability and multi-purpose. The floor protector paper is heavy enough to protect your floor from the most lasting wear and tear. It can be easily cut and used when necessary.

 

Features and benefits

 

  • Protection against abuse: protection from impact, rubbing, dogs, children and contractors
  • Anti overflow: prevent water, mud, paint and stains
  • Reusable: it can be used for dozens of different types of projects and will last for many years
  • Recycled / recyclable: made of recycled materials: recyclable at the end of useful life
  • Air permeability: newly created flexible fibers allow new concrete or wood surfaces to heal properly
  • Waterproof: made of recycled pulp, with fiber, water and ink waterproof surface.
  • Safety: non toxic, zero volatile organic compounds, no odor
  • Convenience: roll in 32 "wide x 120" long x 1 mm thick, easy to cut with box knife and tape with RAM tape.
  • Parapet: allows you to easily crease the BTO board to protect the wall and base molding
  • Save your investment: protect your beautiful floor, save your money and worry.
Available colors natural
Recyclable yes
Reusable yes
Material type paper
ventilation yes
an adhesive no
Liquid resistance yes
Flame retardant no

 

In any construction project, one of the most important preventive measures is to ensure that the finished product area remains in the best condition. Between the equipment, materials and pedestrian traffic involved in the building, the floor of the building is at risk of major damage. From large commercial projects to medium-sized renovation, almost all construction projects need temporary floor protection to avoid scratches and stains.

 

Our heavy-duty flooring is installed quickly to protect the floor surface from paint, mud, water, driving machinery, pedestrian traffic, blunt impact, and so on. It is reusable and allows the contractor to easily get the maximum from the floor. After the construction project is completed, just scroll and store the board until it is needed again.

 

 

Thanks & Regards!

BTO / Kary
Dong Guan Bto Environmental Protection Material Co.,Ltd
Add: 1, No.5 Jinsha Rd. Zhupingsha, Wangniudun, Dongguan, Guangdong, China
Cell/Wechat/WhatsApp: 0086 13728826316
Email: btoholding@yeah.net
www.btoepm.com
 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1991

  • Total Annual:

    7,500,000-10,000,000

  • Employee Number:

    800~1100

  • Ecer Certification:

    Active Member

BTO Holding Co., Ltd. was established in 1991. It is an enterprise integrating chemical industry, pulping, papermaking, paper products, research and development, production, and trade. Its production bases are located in Hunan, China and Hanoi, Vietnam. , Kraft Liner cardboard, color cardboard and o... BTO Holding Co., Ltd. was established in 1991. It is an enterprise integrating chemical industry, pulping, papermaking, paper products, research and development, production, and trade. Its production bases are located in Hunan, China and Hanoi, Vietnam. , Kraft Liner cardboard, color cardboard and o...

+ Read More

Get in touch with us

  • Reach Us
  • GUANGDONG BTO NEW MATERIAL CO.,LTD.
  • No.5, Jinsha Rd., Zhupingsha, Wangniudun Town, Dongguan City, Guangdong Province, China
  • https://www.flooringprotectionpaper.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement