China factories

China factory - ZNLS ENGINEERING CO., LTD.

ZNLS ENGINEERING CO., LTD.

  • China,Beijing ,Beijing
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Telescoping Beam Climbing Formwork System Shaft Platform Easy Operation
China Telescoping Beam Climbing Formwork System Shaft Platform Easy Operation

  1. China Telescoping Beam Climbing Formwork System Shaft Platform Easy Operation

Telescoping Beam Climbing Formwork System Shaft Platform Easy Operation

  1. MOQ: 25 tons
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms 30%TT, Balance against copy of BL
Supply Ability 30%TT, Balance against copy of BL
Delivery Time 14 to 21 days after deposit
Packaging Details In bundle or pallets, or by customer demands
Material Steel
Surface treatment Powder Coated
Lifting Method Platform with wall form in one crane lift
Size Various standard size and Specific project design
Length adjustment By telescoping beam
Application As working platform to support internal wall form
Brand Name ZNLS
Model Number PF-SP
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms 30%TT, Balance against copy of BL Supply Ability 30%TT, Balance against copy of BL
Delivery Time 14 to 21 days after deposit Packaging Details In bundle or pallets, or by customer demands
Material Steel Surface treatment Powder Coated
Lifting Method Platform with wall form in one crane lift Size Various standard size and Specific project design
Length adjustment By telescoping beam Application As working platform to support internal wall form
Brand Name ZNLS Model Number PF-SP
Place of Origin China
High Light Climbing Scaffolding SystemJump Form Formwork System

Shaft platform-2 - It is easy to operate which will also save the cost and the structure is stable

 

Overview

The shaft beam formwork is mainly used in the construction of elevator well, equipments well, staircase of high building etc. Because the concrete lateral pressure is entirely supported by the wall-through tie-rod, additional reinforcement are not needed. The construction is easy, rapid and economical, the surface of the concrete is slick.

 

Introduction

The shaft beam formwork is mainly made up of template, pull-push prop clamp,pull-push prop,platform  board, beam,beam clamp,shaft beam,suspended platform,anchor system ect. The template and the shaft beam are lift separately,first hoist the template and then lift the shaft beam.When the shaft beam platform is reaching its place,we should make sure the pedestal of the shaft beam is tightly subjected to the tensile bolt.

 

Characteristics
1 . The construction load is entirely supported by the anchor system, Additional scaffolding is not needed. It’s perfect for the construction of high building core wall.
2 . The templates can prop to the finished concrete tightly by anchoring set to avoid offset or leakage.
3 . High standard elements can be widely used.
4 . Variety specifications and adjustable length of the shaft beam can meet the demand of shafts with different structure.

 

Value-added Service

ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Trading Company

  • Year Established:

    2014

  • Total Annual:

    10000000-12000000

  • Employee Number:

    100~150

  • Ecer Certification:

    Active Member

Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...

+ Read More

Get in touch with us

  • Reach Us
  • ZNLS ENGINEERING CO., LTD.
  • Building 3, CCT Center, Chaoyang District, Beijing, China
  • http://www.formworkscaffoldingsystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement