| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Raw Material | Steel |
| Surface treatment | Powder coated |
| Lifting method | Self Climbing , Hydraulic Drive |
| Load capacity | 5 tons |
| Integrated platform no. | 4 platforms for independent work |
| Climbing rail | Different length available |
| Brand Name | ZNLS |
| Model Number | PF-AC50 |
| Place of Origin | China |
View Detail Information
Explore similar products
Multi Function Hydraulic Jump Form Shuttering System OEM / ODM Available
High Safety Automatic Climbing System For Vertical / Arced Wall Easy Operation
Fully Automatic Climbing Wall , Jump Form System Construction PF-AC50
Customized Automatic Climbing System Powder Coated Surface Treatment
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Raw Material | Steel | Surface treatment | Powder coated |
| Lifting method | Self Climbing , Hydraulic Drive | Load capacity | 5 tons |
| Integrated platform no. | 4 platforms for independent work | Climbing rail | Different length available |
| Brand Name | ZNLS | Model Number | PF-AC50 |
| Place of Origin | China | ||
| High Light | Self Climbing Scaffold System ,Self Climbing Formwork System | ||
AC50-2 Automatic climbing formwork - Fast, efficient auto-climbing formwork system for High Building
Overview
Auto-climbing system AC50-2 is composed of formwork system, bracket system, hydraulic system, anchor system. It guarantees simple procedure of assembly and climbing without any lifting machine, so it is the best choice for construction.
Characteristics
1 . The self-climbing hydraulic is equipped with an operating platform. As such, workers are not required to do the set-up and this help to save on manpower and materials.
2 . There is low error rate in the construction of the structure. Errors can be easily rectified at each level.
3 . The formwork is able to climb automatically and to be cleaned onsite. As such, this will significantly increase crane operational efficiency.
Climbing Process Flow
1 . Erect formwork, use cone suspension and lateral bracing to secure the formwork. Commence the first round of concrete pouring.
2 . Dismantle the formwork and install the Anchor shoe. Lift the bracket and formwork, install the middle platform, position the formwork correctly and commence on the second round of concrete pouring.
3 . Raise the formwork and brackets to a higher level, attached the guard rail, hydraulic system and suspended platform.
4 . Close formwork and commence on the third round of concrete pouring.
5 . Dismantle the formwork and shift it backwards, attached it on the wall and climb rail.
6 . The Brackets reached its designated position.
7 . Close formwork, commence on the concrete pouring, and the standard climbing process commences.
![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!